TenderDekho Logo
Active GEM

Indian Army Department of Military Affairs Propeller, Vibration Dampers, Battery Straps Tender 2026

Bid Publish Date

16-Aug-2026, 12:40 pm

Bid End Date

26-Aug-2026, 1:00 pm

Progress

Issue16-Aug-2026, 12:40 pm
AwardPending

Key Highlights

  • Supplier must honor option clause allowing up to 50% quantity variation during contract and during currency for contracted rates.
  • Warranty requirement: 1 year from final acceptance or after installation/testing, with OEM warranty certificates at delivery.
  • Inspection regime: Post-Receipt Inspection by BOO at consignee site; pre-dispatch inspection not required unless ATC specifies.
  • Document submission basics: PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate certified by bank.

Tender Overview

Indian Army through the Department of Military Affairs invites bids for multiple accessory categories including Propeller, Vibration Dampers, Battery Straps, TPU Landing Pads, Zip Ties. The tender covers five item groups with unspecified quantities and an estimated value not disclosed. Location details are not provided; this is a national-level procurement intended to equip military hardware with standard components. The bid includes an option clause allowing up to 50% quantity variation at contracted rates, with delivery timelines adjusting accordingly. Bidders must adhere to prescribed document submissions and warranty expectations as outlined in the terms.

Technical Specifications & Requirements

  • Items: Propeller, Vibration Dampers, Battery Straps, TPU Landing Pads, Zip Ties (category list).
  • Warranty: 1 year from final acceptance or after installation/commissioning; OEM warranty certificates required at delivery.
  • Inspection: Post-receipt inspection at consignee site by BOO; pre-dispatch inspection not required unless ATC specifies otherwise.
  • Delivery: Option clause permits up to 50% increase in quantity during contract; delivery period adjustments commence from last date of original/extended delivery.
  • Documentation: Bidder must submit PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate (certified by bank).
  • Financials: Minimum average annual turnover for last three years as per bid document; audited balance sheets or CA/Cost Accountant certificate required.
  • After-sales: Installation, commissioning, training, and maintenance capabilities must be established in India with service centers near consignee destinations.
  • Inspection Agency: BOO to conduct post-receipt inspection.

Terms & Eligibility

  • EMD/Security: Not explicitly specified in provided data; bidders should verify exact amount and mode in final ATC.
  • Payment Terms: Not detailed here; ensure alignment with government procurement norms and ATC.
  • Turnover: Minimum average annual turnover over last three years as indicated in bid document; provide certified audited statements or CA/Cost Accountant certificate.
  • Warranty/SLA: 1-year warranty; OEM warranties to be submitted at delivery; ensure after-sales service network is in India.
  • Additional: Compliance with option clause, delivery timelines linked to original/extended delivery periods, and post-dispatch inspection adherence.

Key Specifications

  • Product categories: Propeller, Vibration Dampers, Battery Straps, TPU Landing Pads, Zip Ties

  • Warranty: 1 year from final acceptance or after installation/comissioning

  • Inspection: Post-receipt inspection at consignee site by BOO

  • Delivery: Quantity variation up to 50% at contract, delivery time reset per option clause

  • Documentation: PAN, GSTIN, Cancelled Cheque, EFT Mandate

Terms & Conditions

  • Option clause permits up to 50% quantity variation during contract and currency

  • 1-year OEM warranty with certificates to be provided at delivery

  • Post-receipt inspection by BOO; pre-dispatch inspection if ATC requires

  • Mandatory documents: PAN, GSTIN, Cancelled Cheque, EFT Mandate

  • Minimum turnover criteria; audited statements or CA/Cost Accountant certificate required

Important Clauses

Payment Terms

Not specified in provided data; bidders should refer to ATC for exact terms and milestones

Delivery Schedule

Delivery period may extend with option clause; extended time based on (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days

Penalties/Liquidated Damages

Not specified in provided data; verify in ATC for LD/penalty terms

Bidder Eligibility

  • Minimum average annual turnover over last three years as per bid document

  • Proof of installation, commissioning, training and after-sales service capability in India

  • Compliance with mandatory document submissions: PAN, GSTIN, EFT Mandate, Cancelled Cheque

Tender Data

Bid Details

Quantity

140

Category

TPU Landing Pads

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

2

OEM Avg. Turnover

5

Past Performance

30 %

Warranty Period

1 years

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Propeller , Vibration Dampers , Battery Straps , TPU Landing Pads , Zip Ties

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

SONITPUR

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-SONITPURSONITPUR--9230-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9762016.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

Propeller

Propeller

92 nos Delivery: 30 days
#2

Vibration Dampers

Vibration Dampers

12 nos Delivery: 30 days
#3

Battery Straps

Battery Straps

12 pcs Delivery: 30 days
#4

TPU Landing Pads

TPU Landing Pads

12 nos Delivery: 30 days
#5

Zip Ties

Zip Ties

12 nos Delivery: 30 days

Categories 5

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Copy of Cancelled Cheque

4

Copy of EFT Mandate certified by Bank

5

Audited Balance Sheets for last 3 years or CA/Cost Accountant certificate indicating turnover

6

OEM authorization certificates (if applicable)

7

Warranty certificates from OEM

8

Service center details near consignee locations

Frequently Asked Questions

Key insights about ASSAM tender market

What documents are required for the Indian Army propeller and accessory tender in 2026?

Bidders must submit PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate certified by bank, plus audited financials or CA/Cost Accountant turnover certificate for last three years, and OEM authorizations if applicable.

How is the 50% quantity variation clause applied in this tender?

The purchaser may increase or decrease the bid quantity up to 50% of the bid quantity at contract, and extend delivery during currency; additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.

What is the warranty requirement for supplied items in this tender?

The warranty is 1 year from final acceptance or after installation/comissioning; OEM warranty certificates must be submitted at delivery; service network in India must handle maintenance and repairs.

What is the inspection process for this Indian Army procurement?

Post-receipt inspection will be conducted at the consignee site by BOO; pre-dispatch inspection is not required unless specified in the ATC.

What turnover evidence is acceptable for bidder eligibility in this tender?

Bidders must provide audited balance sheets for the last three years or a CA/Cost Accountant certificate indicating annual turnover, aligning with the bid document's minimum threshold.

Where can bidders find delivery and performance terms for this army tender?

Refer to the ATC for delivery terms, including option clause, delivery timelines, and any LD/penalty terms; ensure compliance with post-receipt inspection and after-sales service requirements.

Which categories are included in this Army procurement tender in 2026?

Categories include Propeller, Vibration Dampers, Battery Straps, TPU Landing Pads, Zip Ties; ensure your bid covers these five item groups and aligns with OEM warranty and service support commitments.