Open Tender for Track-I - SITC and Operationalization of the AI Cloud,Track-II - SITC of DC infra NON-IT in EPC Mod in PUNE, MAHARASHTRA

Bid Publish Date

25-Sep-2026, 4:27 pm

Bid End Date

29-Oct-2026, 5:00 pm

EMD

₹42,00,00,000

Progress

Issue25-Sep-2026, 4:27 pm
Corrigendum07-Oct-2026
AwardPending

Centre For Development Of Advanced Computing (c-dac) has released a public tender for Track-I - SITC and Operationalization of the AI Cloud, Track- II - SITC of DC infra NON-IT in EPC Mode with O and M, Track-II - SICBO of the AI Cloud IT infrastructure, Any other services, allied works etc. , Any other items, component etc. required to complete the solution. in PUNE, MAHARASHTRA. Quantity: 5. Submission Deadline: 29-10-2026 17: 00: 00. Download documents and apply online.

Advertisement

Tender Data

Bid Details

Quantity

5

Category

Track-II - SICBO of the AI Cloud IT infrastructure

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

200000

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Track-I - SITC and Operationalization of the AI Cloud , Track- II - SITC of DC infra NON-IT in EPC Mode with O and M , Track-II - SICBO of the AI Cloud IT infrastructure , Any other services, allied works etc. , Any other items, component etc. required to complete the solution.

Advisory Bank

Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

48

Pre-Bid & Qualification

Pre-Bid Date

12-10-2026 11:00:00

Pre-Bid Venue

Prebid meeting shall be held in offline mode at C-DAC CIP Pashan Panchwati Pune Maharashtra 411008

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Pune

Delivery Pincodes

411008

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Rajesh Nandu Nikam411008,C-DAC C-DAC Innovation Park, Panchavati, PashanPuneMaharashtra411008190-

Authority Records

MINISTRY OF ELECTRONICS AND INFORMATION TECHNOLOGYELECTRONICS AND INFORMATION TECHNOLOGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9947775.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Corrigendum Updates

1 Update
#1

Update

07-Oct-2026
Advertisement

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

Track-I - SITC and Operationalization of the AI Cloud

Supply , Installation, Testing , Commissioning, benchmarking, and operationalization of the AI Cloud IT infrastructure - Accelerated Compute Solution, High Speed Compute Fabric.

1 pieces Delivery: 90 days
#2

Track-II - SITC of DC infra NON-IT in EPC Mode with O and M

Supply, Installation, Testing and Commissioning of DC infrastructure NON-IT on EPC basis with Tier-III TCDD, TCCF and TCOS Certification along with Operation and Maintenance for 3 years

1 pieces Delivery: 240 days
#3

Track-II - SICBO of the AI Cloud IT infrastructure

SICBO Accelerated Compute Solution, High Speed Compute Fabric, DC LAN Fabric, In and Out Band Network, Cloud CPU Compute Solution, High Throughput Storage, Storage Delivery Network Fabric, Data Protection and Backup, Unified - Cloud Storage

1 pieces Delivery: 310 days
#4

Any other services, allied works etc.

Any other services, allied works etc. required to complete the solution. Bidder to specify the corresponding activity in their Technical Bids to which these will be mapped/associated.

1 pieces Delivery: 310 days
#5

Any other items, component etc. required to complete the solution.

Any other items, component etc. required to complete the solution. Bidder to specify the corresponding activity in their Technical Bids to which these will be mapped/associated.

1 pieces Delivery: 310 days

Categories 25

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Bidder Turnover

2

Certificate (Requested in ATC)

3

OEM Authorization Certificate

4

Additional Doc 1 (Requested in ATC)

5

Additional Doc 2 (Requested in ATC)

6

Additional Doc 3 (Requested in ATC)

7

Additional Doc 4 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement