Bid Publish Date
24-Oct-2026, 7:44 pm
Bid End Date
03-Nov-2026, 8:00 pm
Location
Progress
The Indian Army (Department Of Military Affairs) invites bids for an Electro Hydraulic Load Transfer & Vertical Positioning Unit configured for deployment in North Sikkim, Sikkim 737107. The procurement scope shows potential quantity variation up to 25% of bid quantity, with contract delivery aligning to the original delivery window and extended periods calculated by a defined formula. Bidders must be prepared to comply with at least the basic supplier documentation and ATC requirements as outlined in the bid conditions. The opportunity targets suppliers capable of delivering a high-precision load transfer and vertical positioning subsystem, suitable for military-mobile applications within a rugged Himalayan environment.
No specific technical specifications or BOQ items are provided in the tender. The procurement is centered on a specialized electro-hydraulic system capable of load transfer and vertical positioning under military conditions. The absence of defined itemized quantities or performance metrics requires bidders to rely on standard military-grade electro-hydraulic components and integration capabilities compatible with Indian Army benchmarks. Emphasize robustness, compatibility with rugged terrains, and compliance with ATC terms.
Product: Electro Hydraulic Load Transfer & Vertical Positioning Unit
No BOQ items available; no numeric specifications provided
Delivery terms governed by quantity variation clause (up to 25%)
Required supplier documentation: PAN, GSTIN, cancelled cheque, EFT mandate
ATC/Corrigendum applicable; upload of all required certificates
EMD not specified in available data; bidding subject to standard terms
Option clause allows +/-25% quantity with extended delivery impact
Mandatory submission of PAN, GSTIN, cancelled cheque, EFT Mandate
Not specified in provided data; bidders should review ATC for payment conditions
Delivery schedule linked to option clause; additional time formula applied with minimum 30 days
Not disclosed; consult ATC for LD arrangements and penalties
Must provide PAN card and GSTIN
Must submit EFT mandate and cancelled cheque
Compliance with ATC and Corrigendum certificates
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
3
Past Performance
80 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Electro Hydrulic Load Transfer & Vertical Positioning Unit
Pre-Bid Date
29-10-2026 09:00:00
Pre-Bid Venue
Field Supply Depot, Chungthang, North Sikkim
Max Delivery Days
20
Delivery Locations
1
Delivery Cities
North Sikkim
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | North Sikkim | North Sikkim | - | - | 1 | 20 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate copy certified by bank
Any certificates/documents as per Bid Document, ATC and Corrigendum
Vendor code creation documentation
Key insights about SIKKIM tender market
Submit PAN, GSTIN, cancelled cheque and EFT Mandate; upload all required certificates per ATC; ensure compliance with the 25% quantity variation clause and delivery-time calculation formula. Review Corrigendum and ATC for any added documents and associated performance terms.
Provide PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate certified by your bank. These items are mandatory for vendor code activation and bid eligibility, as per Buyer Added Terms.
The buyer may increase/decrease quantity up to 25% at contract placement and during currency. Additional delivery time equals (Increased quantity / Original quantity) × Original delivery period, with a minimum of 30 days.
No explicit numerical specs are published. Bidders should propose a rugged, military-grade solution compatible with Himalayan terrain, aligned with standard ATC requirements and IS/ISO-type quality practices as applicable to Indian Army tenders.
Upload all certificates listed in the Bid Document, ATC and Corrigendum. Ensure digital copies of compliance certificates are available for quick verification during bid evaluation.
Delivery time extends from the last date of the original delivery order; during extension, time is recalculated per the option clause formula, ensuring minimum 30 days for any added quantity.