Split Air Conditioner Including Green AC, Wall Mount Type (V2),Split Air Conditioner Including Gree
Indian Army
Bid Publish Date
19-Nov-2025, 4:11 pm
Bid End Date
29-Nov-2025, 5:00 pm
Location
Progress
Quantity
5
Category
Split Air Conditioner Including Green AC, Wall Mount Type (V2)
Bid Type
Two Packet Bid
The Directorate Of Employment (Employment And Training Department Uttarakhand) invites bids for Split Air Conditioner Including Green AC, Wall Mount Type (V2) in Dehradun, Uttarakhand 248001. The contract covers Supply, Installation, Testing and Commissioning of the specified AC units. The process allows an option to adjust quantity up to 25% of bid quantity at contract award and again during the contract currency, with delivery extended based on a calculated timeline (minimum 30 days). Bidders must ensure compliance with manufacturer authorization and maintain sound financial standing. The scope includes all cost components, including delivery and commissioning. An ATC document has been uploaded to supplement terms, and the supplier must honor extended delivery periods if option clauses are exercised.
Product: Split AC with Green AC capability, Wall Mount Type (V2)
Scope: Supply, Installation, Testing and Commissioning
Quantity variation: ±25% of bid quantity
Delivery timing: minimum 30 days for extensions; calculated extension formula
Authorization: OEM authorization required for non-OEM bidders
ATC compliance: Follow uploaded ATC terms and conditions
Option clause allows 25% quantity variation and corresponding delivery adjustments
Bidders must provide OEM authorization and non-liability undertakings
Scope includes SITC with all costs included in bid price
Not explicitly defined in data; verify in ATC and bid documents; ensure alignment with SITC contract and supplier terms
Delivery extension rules apply; minimum extension time is 30 days; extension proportional to quantity variance
Not specified in data; check ATC for penalty provisions and performance bonds
No liquidation, bankruptcy, or court receivership against bidder
OEM authorization or valid manufacturer authorization for distributors
Capability to deliver SITC of Split AC Wall Mount V2 within specified timelines
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
National Institute Of Wind Energy
CHENNAI, TAMIL NADU
Nhpc Limited
DARJEELING, WEST BENGAL
Bengal Chemicals And Pharmaceuticals Limited (bcpl)
KOLKATA, WEST BENGAL
N/a
RAJNANDGAON, CHHATTISGARH
Tender Results
Loading results...
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates of similar SITC projects
Audited financial statements (as required)
EMD/security deposit details (as applicable and stated in ATC)
OEM/Manufacturer authorization certificate
Technical bid documents and compliance sheets
ATC document acknowledgment and compliance statements
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | AEVITAS PROCUREMENT SERVICE PRIVATE LIMITED Under PMA | Make : Whirlpool Model : Whirlpool 1.5T 3 Star AC S Or Equivalent | 28-11-2025 15:42:38 | |
| 2 | AMPLE INFOTECH Under PMA | Make : LG Model : US-Q18TNXE | 29-11-2025 09:54:44 | |
| 3 | RELIABLE REPROGRAPHICS Under PMA | Make : LG Model : US-Q18TNXE | 28-11-2025 19:41:26 | |
| 4 | TATER INTERNATIONAL IMPEX Under PMA | Make : Voltas Model : VOLTAS SPLIT INVERTER AC, SAC 183V | 29-11-2025 08:06:05 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | AMPLE INFOTECH Under PMA | Item Categories : Split Air Conditioner Including Green AC, Wall Mount Type (V2),Split Air Conditioner Including Gree | |
| L2 | RELIABLE REPROGRAPHICS Under PMA | Item Categories : Split Air Conditioner Including Green AC, Wall Mount Type (V2),Split Air Conditioner Including Gree |
Please sign in or create an account to view contract details and download result documents.
Key insights about UTTARAKHAND tender market
Bidders must submit OEM authorization if bidding through a distributor, provide financial undertaking, and include SITC scope in the bid. Ensure compliance with the ATC document and the option-quantity clause (up to 25%). Confirm delivery timelines with a minimum 30-day extension, if applicable.
Required documents include GST and PAN, experience certificates for SITC projects, financial statements, OEM authorization, technical bid, ATC acknowledgment, and bid security details if applicable. Ensure all documents reflect the Dehradun location and Green AC specifications.
Scope includes supply, installation, testing and commissioning. Delivery extension follows the formula (Extended quantity ÷ Original quantity) × Original delivery period with a 30-day minimum. All costs are included in the bid price, and installation supports commissioning at the customer site.
ATC documents contain bidder-specific terms and conditions; bidders must acknowledge and comply with them, including any unique clauses related to quantity variation, compliance checks, and warranty/AMC expectations for the Green AC wall-mount V2 units.
Bidders must avoid liquidation/bankruptcy, provide undertaking of financial stability, hold OEM authorization for the product if not the OEM, and demonstrate capacity to deliver SITC services for Split AC Wall Mount V2 in Dehradun within specified timelines.
The purchaser may increase or decrease quantity up to 25% at contract award and during currency at contracted rates. The additional delivery time is calculated using the stated formula, with a minimum extension of 30 days, ensuring supply continuity.
Scope encompasses Supply, Installation, Testing and Commissioning of Split AC Wall Mount V2 units with Green AC features; all cost components must be included in the bid price, and OEM authorization must be provided if applicable.
Verify OEM authorization, confirm ATC compliance, prepare financial undertaking, ensure SITC coverage, and align with the 25% quantity variation rule and minimum 30-day delivery extension; double-check GST/PAN and experience certificates for Dehradun exposure.
Gautam Buddha University
📍 GAUTAM BUDDHA NAGAR, UTTAR PRADESH
Directorate Of Ordnance Coordination And Services
📍 JABALPUR, MADHYA PRADESH
Revenue And Land Reforms Department
📍 VAISHALI, BIHAR
Government Medical College And Associated Hospitals
📍 JAMMU, JAMMU & KASHMIR
Employees State Insurance Corporation (esic)
📍 WEST DELHI, DELHI
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS