TenderDekho Logo
Closed GEM

Invitation to Bid - Act assy set 7165G8Y0750A6HSEPLMK1,Two way Space Saver Actuator PN 0750A6H,7165 Series 3way Ball Va in SAGAR, MADHYA PRADESH

Bid Publish Date

03-May-2025, 10:07 am

Bid End Date

13-May-2025, 2:00 pm

Progress

Issue03-May-2025, 10:07 am
Technical05-Sep-2025, 4:42 pm
Financial
Award28-Aug-2025, 1:19 am
Explore all 5 tabs to view complete tender details

Quantity

90

Category

Act assy set 7165G8Y0750A6HSEPLMK1

Bid Type

Two Packet Bid

Categories 35

A tender has been published for Bharat Petroleum Corporation Ltd Act assy set 7165G8Y0750A6HSEPLMK1, Two way Space Saver Actuator PN 0750A6H, 7165 Series 3way Ball Valve PN 7165G8Y, Mounting kit PNSEPLMK1, Act assy set 7165G8Y0713A6HSEPLMK1, Spring return saver actuator PN 0713A6H, Act assy set 7115G8Y0722A6HSEPLMK3, 90 Spring Return PN 0722A6H, Flomite 71 Series valve PN7115G8Y, Mounting kit PNSEPLMK3, Act assy set 7177G4Y0713A6HSEPLMK2, 71 Series 3way Ball Valve PN 7177G4Y, Mounting kit PNSEPLMK2, 3800 Series Needle Valve PN3812G8Y, 6200 Series Poppet Check Valve 6253G8Y, Flomite 71 Series valvePN7115G4Y, Back Pres. Regulator PNBP3 1A11D5G171, Reducing Branch Tee PN8TTTB4316, Union Tee 12 PN8TTT316, Union Elbow 34 PN12LU316, Reducing Union 34X12 OD PN12RU8316, Union 34 OD end PN12U8316, CVH series Check Valve PN CVHG12Y31S, 7223 Series Ball Valve PN 7223G12Y, 6200 Series Pop Check Valve PN 6231G4Y, Tube 0. 25 OD 0 035 PNTHT3R60635089, Tube12 OD 0. 049PNTHT3R6012. 71. 24, Tube34 OD 0. 065 PNTHT3R6019. 51. 65 in SAGAR, MADHYA PRADESH. Quantity: 90 by. Submission Deadline: 13-05-2025 14: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Act assy set 7165G8Y0750A6HSEPLMK1 , Two way Space Saver Actuator PN 0750A6H , 7165 Series 3way Ball Valve PN 7165G8Y , Mounting kit PNSEPLMK1 , Act assy set 7165G8Y0713A6HSEPLMK1 , Spring return saver actuator PN 0713A6H , Act assy set 7115G8Y0722A6HSEPLMK3 , 90 Spring Return PN 0722A6H , Flomite 71 Series valve PN7115G8Y , Mounting kit PNSEPLMK3 , Act assy set 7177G4Y0713A6HSEPLMK2 , 71 Series 3way Ball Valve PN 7177G4Y , Mounting kit PNSEPLMK2 , 3800 Series Needle Valve PN3812G8Y , 6200 Series Poppet Check Valve 6253G8Y , Flomite 71 Series valvePN7115G4Y , Back Pres. Regulator PNBP3 1A11D5G171 , Reducing Branch Tee PN8TTTB4316 , Union Tee 12 PN8TTT316 , Union Elbow 34 PN12LU316 , Reducing Union 34X12 OD PN12RU8316 , Union 34 OD end PN12U8316 , CVH series Check Valve PN CVHG12Y31S , 7223 Series Ball Valve PN 7223G12Y , 6200 Series Pop Check Valve PN 6231G4Y , Tube 0.25 OD 0 035 PNTHT3R60635089 , Tube12 OD 0.049PNTHT3R6012.71.24 , Tube34 OD 0.065 PNTHT3R6019.51.65

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASBHARAT PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-7799611.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 28 Items Sign in for GEM prices

#1

Act assy set 7165G8Y0750A6HSEPLMK1

As per specification

2 ea Delivery: 84 days
#2

Two way Space Saver Actuator PN 0750A6H

As per specification

3 ea Delivery: 84 days
#3

7165 Series 3way Ball Valve PN 7165G8Y

As per specification

12 ea Delivery: 84 days
#4

Mounting kit PNSEPLMK1

As per specification

5 ea Delivery: 84 days
#5

Act assy set 7165G8Y0713A6HSEPLMK1

As per specification

2 ea Delivery: 84 days
#6

Spring return saver actuator PN 0713A6H

As per specification

3 ea Delivery: 84 days
#7

Act assy set 7115G8Y0722A6HSEPLMK3

As per specification

1 ea Delivery: 84 days
#8

90 Spring Return PN 0722A6H

As per specification

1 ea Delivery: 84 days
#9

Flomite 71 Series valve PN7115G8Y

As per specification

7 ea Delivery: 84 days
#10

Mounting kit PNSEPLMK3

As per specification

1 ea Delivery: 84 days
#11

Act assy set 7177G4Y0713A6HSEPLMK2

As per specification

2 ea Delivery: 84 days
#12

71 Series 3way Ball Valve PN 7177G4Y

As per specification

7 ea Delivery: 84 days
#13

Mounting kit PNSEPLMK2

As per specification

1 ea Delivery: 84 days
#14

3800 Series Needle Valve PN3812G8Y

As per specification

4 ea Delivery: 84 days
#15

6200 Series Poppet Check Valve 6253G8Y

As per specification

5 ea Delivery: 84 days
#16

Flomite 71 Series valvePN7115G4Y

As per specification

10 ea Delivery: 84 days
#17

Back Pres. Regulator PNBP3 1A11D5G171

As per specification

2 ea Delivery: 84 days
#18

Reducing Branch Tee PN8TTTB4316

As per specification

2 ea Delivery: 84 days
#19

Union Tee 12 PN8TTT316

As per specification

2 ea Delivery: 84 days
#20

Union Elbow 34 PN12LU316

As per specification

2 ea Delivery: 84 days
#21

Reducing Union 34X12 OD PN12RU8316

As per specification

2 ea Delivery: 84 days
#22

Union 34 OD end PN12U8316

As per specification

2 ea Delivery: 84 days
#23

CVH series Check Valve PN CVHG12Y31S

As per specification

2 ea Delivery: 84 days
#24

7223 Series Ball Valve PN 7223G12Y

As per specification

5 ea Delivery: 84 days
#25

6200 Series Pop Check Valve PN 6231G4Y

As per specification

2 ea Delivery: 84 days
#26

Tube 0.25 OD 0 035 PNTHT3R60635089

As per specification

1 ea Delivery: 84 days
#27

Tube12 OD 0.049PNTHT3R6012.71.24

As per specification

1 ea Delivery: 84 days
#28

Tube34 OD 0.065 PNTHT3R6019.51.65

As per specification

1 ea Delivery: 84 days

Required Documents

1

Certificate (Requested in ATC)

2

OEM Authorization Certificate

3

OEM Annual Turnover

4

Additional Doc 1 (Requested in ATC)

5

Additional Doc 2 (Requested in ATC)

6

Additional Doc 3 (Requested in ATC)

7

Additional Doc 4 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
SPIRARE ENERGY PRIVATE LIMITED   Under PMA
-09-05-2025 16:42:00

Financial Results

Rank Seller Price Item
L1
SPIRARE ENERGY PRIVATE LIMITED(MSE)( MSE Social Category:General )    Under PMA
Item Categories : Act assy set 7165G8Y0750A6HSEPLMK1,Two way Space Saver Actuator PN 0750A6H,7165 Series 3way Ball Va

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about MADHYA PRADESH tender market

What are the eligibility requirements for the tender?

The eligibility requirements include being a registered entity capable of fulfilling high-value industrial orders. Bidders should demonstrate prior experience in similar projects and compliance with industry standards. Proper registration with relevant authorities and maintaining a strong financial structure are also critical for participation.

What certificates are required to participate in this tender?

Bidders are required to submit multiple certificates, including a valid business registration, tax compliance certificates, and quality assurance certifications related to the components offered. Any additional relevant certifications that validate the operational capacity may also be necessary.

How do I register for the tender?

The registration process involves submitting an online application through the BPCL procurement portal. Interested bidders must ensure all required documentation is correctly uploaded and comply with the format specified in the tender instructions.

What are the accepted document formats for submissions?

Submissions must be made in PDF or Word document formats, as per the submission guidelines. Bidders should ensure that all documents are clear, legible, and contain the necessary signatures where applicable to avoid issues during evaluation.

What security measures and financial guarantees are needed?

Bidders must provide an Earnest Money Deposit (EMD) as specified in the documentation, along with performance security guarantees where necessary. Payment terms will also be dictated by the evaluation results, ensuring compliance with BPCL’s procurement guidelines.