Open EPROCURE

Procurement Opportunity: construction of CC lining Reach From3.441 to 3.606 Km 165.00 mtr total in main canal and syphon no 06 Both side 50 mtr total 100 mtr at Gurha pump canal block naraini distt banda in BANDA, UTTAR PRADESH

Bid Publish Date

07-Jan-2026, 10:00 am

Bid End Date

16-Jan-2026, 11:00 am

EMD

₹62,500

Progress

Issue07-Jan-2026, 10:00 am
AwardPending
Explore all 5 tabs to view complete tender details

Tender Type

Open

Contract Type

Tender

Tender Fee

₹854

EMD Exemption

No

Category

Civil Works

Contract Form

Percentage

Public procurement opportunity for U P Irrigation Department (Mechanical) construction of CC lining Reach From3. 441 to 3. 606 Km 165. 00 mtr total in main canal and syphon no 06 Both side 50 mtr total 100 mtr at Gurha pump canal block naraini distt banda in BANDA, UTTAR PRADESH issued by. Submission Deadline: 16-01-2026 11: 00: 00. View full details and respond.

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Similar Tenders

5 found
Urgent

Urgent Maintenance and Repair of Both Side Canal lining from ch. 210.00 to ch. 212.00 repairing of Outlet Structure at ch. 205.00 and resectioning of canal from ch. 205.00 to ch. 211.00 including Strengthening of canal from ch. 211.00 to ch. 217.00

IRRIGATION AND WATERWAYS DEPT.

📍 BANKURA, WEST BENGAL

EMD: ₹9,554
Est: ₹4.8 L
⏰ Deadline: 4 days left
🛒 Type: Works
View EPROCURE
Urgent

Supply and fixing of 16 Mtr High mast Pole with HPSV Flood Light at kanwara pump canal block badhokhar distt Banda Lot 3

U P Irrigation Department (Mechanical)

📍 BANDA, UTTAR PRADESH

EMD: ₹12,100
Est: ₹6.0 L
⏰ Deadline: 3 days left
🛒 Type: Works
View EPROCURE
Urgent

Supply and fixing of 16 Mtr High mast Pole with HPSV Flood Light at Balaji pump canal block badhokhar distt Banda Lot 5

U P Irrigation Department (Mechanical)

📍 BANDA, UTTAR PRADESH

EMD: ₹12,100
Est: ₹6.0 L
⏰ Deadline: 3 days left
🛒 Type: Works
View EPROCURE
Urgent

construction of CC lining Reach From2.340 to 2.625 Km 285.00 mtr total in main cana to Kulaba No 14 at Gurha pump canal block naraini distt banda

U P Irrigation Department (Mechanical)

📍 BANDA, UTTAR PRADESH

EMD: ₹66,500
⏰ Deadline: 3 days left
🛒 Type: Works
View EPROCURE
Urgent

construction of CC lining Reach From1.785 to 2.065 Km 280.00 mtr total in main cana to basrahi minorl at Gurha pump canal block naraini distt banda

U P Irrigation Department (Mechanical)

📍 BANDA, UTTAR PRADESH

EMD: ₹66,000
Est: ₹32.9 L
⏰ Deadline: 3 days left
🛒 Type: Works
View EPROCURE