Bid Publish Date
15-Oct-2026, 8:23 am
Bid End Date
26-Oct-2026, 9:00 am
Location
Progress
Hindustan Aeronautics Limited (Department of Defence Production) seeks a Test Rig for FCG Probes. The scope appears to be equipment acquisition with OEM installation/commissioning responsibilities. The BOQ shows no items listed, indicating the bid may encompass a single or undefined quantity, with options for up to 50% quantity variation. A data sheet must accompany the bid and must match technical parameters. GST handling is bidder’s responsibility, with reimbursement as per actuals or applicable rates. Anomalies between data sheet and offered product may lead to bid rejection. Optional site visits are at bidder expense and entry is subject to indemnities. Installation/Testing/Training, if applicable, must be carried out by OEM-qualified resources. A Malicious Code Certificate is mandatory to prevent embedded malware and IP infringements.
GST responsibility lies with bidder; reimbursement as per actuals or lower rate
Data Sheet must match product specifications; mismatch may lead to rejection
Installation and training to be performed by OEM-certified personnel
GST reimbursement as actuals or lower, based on quoted GST; no explicit payment schedule provided
Not specified; buyers reserve 50% quantity variation rights
Not specified in available data
Must provide PAN, GSTIN, cancelled cheque, EFT mandate
OEM authorization or OEM-certified reseller status for installation/commissioning
DataSheet alignment with technical parameters; no mismatches
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
Yes
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
Bid Splitting Applied
No
Min. Avg. Annual Turnover
19
Warranty Period
3 years
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
TEST RIG FOR FCG PROBES
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
LUCKNOW
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | LUCKNOW | LUCKNOW | - | - | 1 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate certified by Bank
Data Sheet of the offered product
Technical compliance certificates / datasheet alignment
OEM authorization or OEM-certified reseller details
Evidence of installation/commissioning capability
Key insights about UTTAR PRADESH tender market
To bid, submit PAN, GSTIN, cancelled cheque, EFT mandate, and a Data Sheet aligned to the offered Test Rig for FCG Probes. Include OEM authorization, and Malicious Code Certificate. Ensure GST handling falls within HAL guidelines; optional site visit at bidder cost clarification may be needed.
Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, Data Sheet, OEM authorization, and technical compliance certificates. Upload the Data Sheet with bid; ensure it matches specifications to avoid rejection. Provide evidence of installation capability or OEM-certified resources.
The tender specifies a Test Rig for FCG Probes with an accompanying Data Sheet. No numerical specs are provided in the available data; bidders must rely on the Data Sheet and OEM documentation to demonstrate conformity, including installation/commissioning by OEM resources and malware-free guarantees.
Site visits are optional and at bidder expense. Entry is allowed under indemnity terms. Bidders should prepare risk assessments and confirm the scope of site reconnaissance before scheduling, since costs are not reimbursed by HAL.
GST is the bidder’s responsibility; HAL will reimburse as per actuals or the lower applicable rate, bounded by the quoted GST percentage. Ensure proper GSTIN and invoice alignment with HAL’s reimbursement terms and document GST compliance in the bid.
HAL reserves the right to increase or decrease the order quantity up to 50%. Plan procurement accordingly, including flexibility in manufacturing or supplier capacity, and confirm revised delivery timelines if quantities change.