STAND, SSM WORK ROLL STACKING, PD/R-288020
Rourkela Steel Plant
SUNDERGARH, ODISHA
Bid Publish Date
19-May-2026, 9:06 am
Bid End Date
05-Jun-2026, 1:00 pm
EMD
₹5,00,000
Location
Progress
Quantity
4
Category
Balancing Beam Assembly for entry side work roll of four high roughing stand
Bid Type
Two Packet Bid
Organization: Bhilai Steel Plant, part of the Steel Authority of India Limited (SAIL). Product category: Balancing Beam Assembly for entry and exit sides of the four-high roughing stand. Location: Bhilai, Chhattisgarh (tender location implied by organization). Quantity/Scope: Focused on two beam assemblies (entry side and exit side) for the four-high roughing stand; Estimated value not disclosed; EMD: ₹5,00,000. Unique aspect: procurement for critical forming line components with no BOQ items listed. This tender combines structural-beam assemblies with precision alignment needs for rolling mill equipment. The ATC document was uploaded, indicating specific buyer terms. This extract-oriented tender demands precise integration with existing roughing stand architecture.
Balancing Beam Assembly for entry side work roll of four-high roughing stand
Balancing Beam Assembly for exit side work roll of four-high roughing stand
EMD: ₹5,00,000
ATC document uploaded by Buyer
No BOQ items available
EMD amount is ₹5,00,000 via bank transfer or as specified in ATC
ATC document attached; bidders must comply with buyer terms
Delivery and payment terms are to be clarified in the ATC
Payment terms detailed in the ATC; refer to buyer terms for schedule and milestones
Delivery timelines to be specified in ATC; ensure alignment with rolling mill downtime windows
LD provisions to be as per ATC; details available in uploaded ATC document
Experience in supply/assembly of balancing beams or rolling mill components
Financial stability evidenced by financial statements
GST registration and PAN;.authorizations from OEM as required by ATC
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Balancing Beam Assembly for entry side work roll of four high roughing stand , Balancing Beam Assembly for exit side work roll of four high roughing stand
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
TECHNICAL
TECHNICAL
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Rourkela Steel Plant
SUNDERGARH, ODISHA
Iisco Steel Plant
Delhi Metro Rail Corporation Limited
NORTH WEST DELHI, DELHI
Indian Army
DIMAPUR, NAGALAND
Hindustan Copper Limited
RAIGAD, MAHARASHTRA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates (relevant rolling mill component assemblies)
Financial statements (last 2-3 years)
EMD/Security deposit submission proof
Technical bid documents aligned with ATC
OEM authorizations (if required by ATC)
Bidders must submit GST, PAN, experience certificates, financials, EMD ₹5,00,000, and ATC-compliant technical bid. Ensure OEM authorizations if required, and align proposal with assembly of entry/exit side balancing beams for a four-high roughing stand. Review the uploaded ATC for payment and delivery terms.
Submit GST certificate, PAN card, organization’s financial statements, experience certificates for rolling mill assemblies, EMD proof of ₹5,00,000, and technical bid aligned to ATC terms. Include OEM authorizations if mandated and any installation qualification documents requested in the ATC.
Technical scope includes balancing beam assemblies for both entry and exit sides of a four-high roughing stand. Specific dimensions and fitment details are in the ATC; bidders should prepare CAD-compatible assemblies, alignment features, and compatibility with existing stand components.
Delivery window details are provided in the ATC. Bidders should anticipate alignment with rolling mill downtime and commissioning windows; ensure procurement lead times reflect factory testing, transit, and on-site installation planning as per buyer terms.
Payment terms are defined in the ATC; typically include milestone-based payments tied to delivery/installation and acceptance. Ensure compliance with the supplier’s financial documents and bank guarantees as required by SAIL and the buyer in the ATC.
EMD is ₹5,00,000. Submit via online payment or DD as specified in the ATC. Include EMD submission proof with the technical bid and ensure it remains valid through bid submission and evaluation milestones per buyer terms.
N/a
📍 MUZAFFARNAGAR, UTTAR PRADESH
Rashtriya Ispat Nigam Limited
📍 VISAKHAPATNAM, ANDHRA PRADESH
National Fire Service College
📍 NAGPUR, MAHARASHTRA
Directorate Of Employment & Training
📍 SURAT, GUJARAT
Iisco Steel Plant
📍 BARDHAMAN, WEST BENGAL
Sign up now to access all documents
Main Document
OTHER
TECHNICAL
TECHNICAL
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS