TenderDekho Logo
Closed GEM

Prisons Administration And Reforms Department Uttar Pradesh brick, cement, sariya, mistri tender Gazipur 2026

Bid Publish Date

03-Oct-2026, 1:37 pm

Bid End Date

13-Oct-2026, 2:00 pm

EMD

₹40,000

Progress

Issue03-Oct-2026, 1:37 pm
AwardPending

Tender Overview

The Uttar Pradesh Prisons Administration And Reforms Department seeks procurement of construction materials and related services for a project in GAZIPUR, UTTAR PRADESH (232325). Procurement covers brick, morang, cement, sariya, gitti and associated labour/mistri services with 7 BOQ items, though specific item details are not disclosed. Estimated value is not published; EMD is ₹40,000. Scope includes supply, installation, testing, commissioning, and operator training, plus any statutory clearances. A key differentiator is the option clause enabling up to 25% quantity variation at contract rates and extended delivery timelines. The tender emphasizes turnover proof (3-year average) and OEM turnover alignment, plus a requirement for a service centre in the state of each consignee location.

Technical Specifications & Requirements

  • Scope: Supply, Installation, Testing, Commissioning of goods; operator training; statutory clearances if any.
  • Materials: Bricks, morang, cement, sariya, gitti; quantity details not disclosed in BOQ.
  • Delivery & Execution: Delivery period governed by option clause; additional time formula: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days; extended duration up to original delivery period.
  • Turnover & OEM: Minimum average annual turnover over last 3 years (as per bid document); OEM turnover criteria apply in bunch bids; audited balances or CA/Cost Accountant certificate acceptable.
  • Support: Functional Service Centre in the state for carry-in warranty.

Terms & Eligibility

  • EMD: ₹40,000.
  • Option Clause: Allow up to 25% quantity variation during contract; extended delivery as defined.
  • Turnover Evidence: 3-year average turnover required; documents to be uploaded (audited balance sheet or CA/Cost Accountant certificate).
  • OEM Condition: OEM turnover requirement; in multi-product bids, OEM of highest bid value meets criterion.
  • Service Availability: Service centre presence in each consignee state; carry-in warranty implied.

Key Specifications

  • Items: brick, morang, cement, sariya, gitti, mistri labour (BOQ items not individually specified)

  • EMD: ₹40,000

  • Delivery: 25% quantity variation allowed; delivery period adjustments with minimum 30 days

  • Turnover: 3-year average turnover evidence required (organization and OEM as applicable)

  • Service: Functional Service Centre in the state of each consignee location

  • Scope: Supply, Installation, Testing, Commissioning, and operator training with statutory clearances (if any)

Terms & Conditions

  • EMD of ₹40,000 required with bid submission

  • 25% quantity variation right during contract; extended delivery rules apply

  • 3-year average turnover evidence must be uploaded

  • OEM turnover criteria apply for multi-item bids

  • Functional service centres required in each consignee state

Important Clauses

Payment Terms

Not explicitly stated in provided data; payment terms to be clarified in bid documents.

Delivery Schedule

Delivery period aligned with option clause; additional time computed as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.

Penalties/Liquidated Damages

Not specified in available information; define in contract if applicable.

Bidder Eligibility

  • Minimum average turnover over last 3 years (detailed in bid document)

  • OEM turnover criteria met for the highest value category if bunch bids

  • Functional Service Centre present in each consignee state

Advertisement

Authority & Contact

Organization

N/a

Office Name

Prisons Administration And Reform Department Up

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

63278

Category

brick

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

brick , morang , cement , sariya , gitti , mistri , labour

Advisory Bank

State Bank of India

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Ghazipur

Delivery Pincodes

233001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Jagdamba Prasad Dubey233001,DISTRICT JAIL GHAZIPURGhazipurUttar Pradesh2330015162015-

Authority Records

PRISONS ADMINISTRATION AND REFORMS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9980511.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 7 Items Sign in for GEM prices

#1

brick

brick

51,620 pieces Delivery: 15 days
#2

morang

morang

3,277 ft Delivery: 15 days
#3

cement

cement

435 bag Delivery: 15 days
#4

sariya

sariya

2,059 kg Delivery: 15 days
#5

gitti

gitti

4,060 ft Delivery: 15 days
#6

mistri

mistri

522 days Delivery: 15 days
#7

labour

labour

1,305 days Delivery: 15 days
Advertisement

Categories 3

Required Documents

1

GST registration

2

PAN card

3

Audited Balance Sheets or CA/Cost Accountant turnover certificates for last 3 years

4

OEM authorization (if bidding as a reseller/partner)

5

Proof of functional Service Centre in relevant state

6

EMD payment receipt/document

7

Technical bid documents indicating compliance with scope (supply, installation, testing, commissioning, training)

8

Company incorporation certificate (if applicable)

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for Gazipur UP prisons construction materials tender 2026

Bidders must meet turnover criteria for the last 3 financial years and provide audited balances or CA certificates. Submit GST, PAN, EMD ₹40,000, OEM authorization if applicable, and proof of a functional service centre in the state. Ensure compliance with supply, installation, testing, commissioning, and training scope.

What documents are required for UP prisons brick tender 2026

Required documents include GST registration, PAN, audited financial statements or CA certificate for turnover, OEM authorization if reselling, service centre proof in each consignee state, and EMD₹40,000. Technical bid should cover supply, installation, testing, commissioning, and operator training with statutory clearances if any.

What are the delivery terms for Gazipur prisons materials tender

Delivery is governed by the option clause allowing up to 25% quantity variation at contract rates. The extended delivery period uses the formula (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.

What are OEM turnover requirements for UP tender 2026

OEM turnover must meet the minimum average annual turnover over the last 3 years as specified in the bid document. In bunch bids, the OEM with the highest bid value must satisfy this criterion, supported by audited balances or CA certificates.

What is the EMD amount for this UP tender

The Earnest Money Deposit (EMD) required is ₹40,000. Submit the EMD along with the bid in the specified online or offline mode per tender terms and ensure it is valid for the bid validity period.

What service commitments are required for UP prisons procurement

Bidder must demonstrate a Functional Service Centre in the state of each consignee location for carry-in warranty, plus delivery, installation, testing, commissioning, and operator training support as part of scope.

How to verify eligibility for brick and cement tender in UP

Check turnover documentation for last 3 years, provide OEM turnover proof if applicable, ensure service centre presence in relevant states, and confirm capability to supply bricks, cement, sariya, morang, gitti, and labour per scope.

Advertisement