TenderDekho Logo
GEM

Bharat Electronics Limited nitrogen gas regulator tender 2025 Machilipatnam BEL-DOP BEL-Machilipatnam

Bid Publish Date

04-Nov-2025, 11:42 am

Bid End Date

14-Nov-2025, 12:00 pm

Progress

Issue04-Nov-2025, 11:42 am
Technical11-Nov-2025, 7:26 pm
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

5

Bid Type

Two Packet Bid

Key Highlights

  • Nitrogen gas regulator procurement by BEL under DOP
  • FO.R BEL-Machilipatnam or door delivery at supplier cost
  • 25% quantity variation to be considered during/after contract
  • 12-month warranty from receipt and acceptance with 7-day defect rectification window
  • Mandatory compliance statements for technical documents and terms in technical bid
  • Inclusive final price covering all costs (transportation, loading/unloading, insurance, taxes, duties)

Categories 7

Tender Overview

Bharat Electronics Limited (Department of Defence Production) seeks procurement of a nitrogen gas regulator. The scope appears limited to a single product category with undefined quantity, but price must be final and all-inclusive. Delivery terms specify FO.R BEL-Machilipatnam or door delivery at supplier’s cost and insurance. An ATC clause enforces a 25% quantity variation during contract and extended delivery windows. The warranty specified is 12 months from receipt and acceptance with seller obligated to rectify or replace within 7 days if non-conforming. Compliance statements for technical documents and the terms must accompany the bid, ensuring alignment with BEL’s quality expectations. The tender emphasizes adherence to the option clause and total price certainty. Unique elements include the integration of compliance documentation with the technical bid and the extended delivery framework tied to quantity changes. This tender targets suppliers capable of providing nitrogen gas handling components with robust warranty and documented compliance. The opportunity sits in the defense procurement arena under BEL, highlighting strict conformance, risk management, and delivery discipline.

Technical Specifications & Requirements

  • Product: Nitrogen gas regulator
  • Delivery Terms: FO.R BEL-Machilipatnam or door delivery; supplier bears loading, unloading, freight, insurance, taxes, duties
  • Warranty: 12 months from date of receipt and acceptance; replacement/rectification required within 7 days for non-conforming goods
  • Option Clause: quantity may increase up to 25% of bid quantity at contract rates; extended delivery period applies with a minimum extension rule
  • Compliance: provide Compliance Statement for technical documents and terms with the technical bid; price quoted must be final and inclusive of all costs
  • Quality/guarantee: goods must meet contract technical specifications and be of good quality with standard warranty; supplier to supply spares on agreed terms if required
  • Currency of terms: no explicit currency provided; ensure inclusive pricing and delivery at BEL’s location

Terms, Conditions & Eligibility

  • Delivery: FOB BEL-Machilipatnam or door delivery at supplier’s cost and insurance
  • Warranty: 12-month standard warranty; replacement/rectification within 7 days for defective goods
  • Price: quoted price must be final and binding; inclusive of transportation, loading/unloading, insurance, taxes, duties
  • Quantity variation: up to 25% increase/decrease during contract and currency of contract
  • Compliance submission: include compliance statement for technical documents and Terms & Conditions with the technical bid
  • Performance risk: ensure adherence to BEL terms; warranty breach may trigger compensation obligations
  • Documentation: submit standard tender documents per terms; GST/PAN/experience not explicitly listed in the provided terms but typically required in BEL tenders

Key Specifications

  • Product: Nitrogen gas regulator

  • Delivery: FOB BEL-Machilipatnam or door delivery

  • Warranty: 12 months from receipt/acceptance

  • Compliance: required for technical documents and terms

  • Quantity: flexibility up to 25% of bid quantity

  • Pricing: final and inclusive of all costs

Terms & Conditions

  • Quantity may be increased by up to 25% at contract rates

  • 12-month warranty with 7-day defect rectification

  • Final, all-inclusive pricing with delivery terms specified

Important Clauses

Delivery Terms

FO.B BEL-Machilipatnam or door delivery; supplier bears cost and insurance

Warranty & Remedies

12 months warranty; replacement/rectification within 7 days for defective goods

Price & Compliance

Quoted price final and binding; inclusive of all costs; submit compliance statements with bid

Bidder Eligibility

  • Experience in supplying nitrogen gas handling equipment

  • Capability to deliver FOB or door delivery to BEL-Machilipatnam

  • Ability to provide 12-month warranty and spare parts support

Documents 3

GeM-Bidding-8546157.pdf

Main Document

Technical Specification/Buyer Specification Document

TECHNICAL

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Indian Air Force Nitrogen Hose Procurement Tender 2026 - NITROGEN HOSE Goods Supply 2026, DMA

Indian Air Force

GANDHI NAGAR, GUJARAT

Posted: 6 January 2026
Closed: 19 January 2026
GEM

Indian Air Force Nitrogen Hose Tender 2025 Department Of Military Affairs India

Indian Air Force

THANJAVUR, TAMIL NADU

Posted: 3 November 2025
Closed: 13 November 2025
GEM

Nitrogen Concentrator

National Institute Of Food Technology Entrepreneurship And Management (niftem) New Delhi

SONIPAT, HARYANA

Posted: 15 October 2025
Closed: 12 November 2025
GEM

Nitrogen cylinder

Iocl Business Development

JAGATSINGHAPUR, ODISHA

Posted: 10 October 2025
Closed: 24 October 2025
GEM

NITROGEN EVAPORATOR

Export Inspection Council Of India (eic)

KHORDHA, ODISHA

Posted: 20 March 2025
Closed: 10 April 2025
GEM

Required Documents

1

Compliance Statement for technical documents

2

Compliance Statement for attached Terms and Conditions

3

Quoted price inclusive of transportation, loading/unloading, insurance, taxes, duties

4

Delivery terms acceptance (FO.R BEL-Machilipatnam or door delivery)

5

Warranty compliance confirmation (12 months, 7-day defect rectification)

Technical Results

S.No Seller Item Date Status
1ANUPAM UDYOG   Under PMAMake : esab Model : NA Title : NITROGEN GAS REGULATOR11-11-2025 19:26:02Qualified
2k tech solutions   Under PMAMake : esab Model : Double Stage Nitrogen Regulator 230/10 bar Title : NITROGEN GAS REGULATOR13-11-2025 13:33:29Qualified
3Puneet Welding Industries   Under PMAMake : SEEMA Model : S.DS.DNI - 5 Title : NITROGEN GAS REGULATOR14-11-2025 01:25:23Disqualified
4Reeva Cryogenic Gases LLP   Under PMAMake : Reeva Cryogenic Gases LLP--Reeva Cryogenic Gases LLP Model : GAS REGULATOR Title : NITROGEN GAS REGULATOR14-11-2025 10:24:25Qualified
5VINAYAK ENTERPRISES   Under PMAMake : esab Model : NITROGEN GAS REGULATOR Title : NITROGEN GAS REGULATOR14-11-2025 09:05:12Qualified

Financial Results

Rank Seller Price Item
L1ANUPAM UDYOG   Under PMA₹37,950Item Categories : NITROGEN GAS REGULATOR
L2Reeva Cryogenic Gases LLP (MSE)( MSE Social Category:General )    Under PMA₹44,250Item Categories : NITROGEN GAS REGULATOR
L3VINAYAK ENTERPRISES   Under PMA₹45,740Item Categories : NITROGEN GAS REGULATOR
L4k tech solutions   Under PMA₹49,350Item Categories : NITROGEN GAS REGULATOR

Frequently Asked Questions

Key insights about ANDHRA PRADESH tender market

How to bid for nitrogen gas regulator tender in Machilipatnam under BEL?

Bidders must submit a compliant technical bid with a dedicated compliance statement for technical documents and Terms. Provide final inclusive price, delivery terms as FO.R BEL-Machilipatnam or door delivery, and warranty details. Ensure acceptance of the 25% quantity variation clause and 12-month warranty.

What is the warranty requirement for nitrogen regulator procurement?

The contract specifies a 12-month warranty from receipt/acceptance. If defects appear, the supplier must rectify or replace within 7 days. Ensure spare parts availability and timely service to avoid penalties or contract disputes.

What documents are required to accompany the technical bid?

Submit Compliance Statement for technical documents, the Compliance Statement for Terms and Conditions, and the final inclusive price. Include delivery terms acceptance and explicit warranty confirmation as part of the technical bid.

What are delivery terms for BEL Machilipatnam nitrogen regulator?

Delivery terms require FOB BEL-Machilipatnam or door delivery at the supplier’s cost and insurance. Supplier bears all costs including loading/unloading, insurance, and duties until delivery at consignee location.

How does the 25% quantity variation affect delivery schedule?

The purchaser may increase quantity up to 25% of the bid quantity during contract. Additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.

What is the pricing requirement for this nitrogen regulator tender?

Quoted price must be final and binding, inclusive of all costs (transportation, loading/unloading, insurance, taxes, duties). The supplier should not demand price changes later under any circumstance.

Are there any mandatory compliance statements for submissions?

Yes, bidders must attach a Compliance Statement of technical documents and a Compliance Statement of attached Terms and Conditions with the technical bid to meet BEL’s QA expectations.

What does BEL require regarding delivery acceptance?

BEL requires the goods to be delivered or sent to the BEL-Machilipatnam location; acceptance is contingent on conformity to contract specifications and warranty terms, with post-delivery support as specified.