TenderDekho Logo
Closed GEM

Government Tender Published for Supply of 2 Mega Pixel Network Dome Camera with Power Adaptor,Supply of 2 Mega Pixel Network Indoor in CACHAR, ASSAM

Bid Publish Date

28-Jul-2025, 5:20 pm

Bid End Date

03-Sep-2025, 11:00 am

Value

₹1,18,18,764

Generate Docs

Progress

Issue28-Jul-2025, 5:20 pm
Technical09-Feb-2025, 12:27 am
Financial
Award25-Oct-2025, 12:20 am
Explore all 4 tabs to view complete tender details

Quantity

12195

Category

Supply of 2 Mega Pixel Network Dome Camera with Power Adaptor

Bid Type

Two Packet Bid

Categories 79

Airports Authority Of India invites bids for Supply of 2 Mega Pixel Network Dome Camera with Power Adaptor, Supply of 2 Mega Pixel Network Indoor in CACHAR, ASSAM. Quantity: 12195. Submission Deadline: 03-09-2025 11: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Authority Records

MINISTRY OF CIVIL AVIATIONAIRPORTS AUTHORITY OF INDIA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-8147492.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 54 Items Sign in for GEM prices

#1

Supply of 2 Mega Pixel Network Dome Camera with Power Adaptor

Supply of 2 Mega Pixel Network Dome Camera with Power Adaptor - As per Technical Specification.

23 each Delivery: 120 days
#2

Supply of 2 Mega Pixel Network Indoor IR PTZ Camera

Supply of 2 Mega Pixel Network Indoor IR PTZ Camera - As per Technical Specification.

6 each Delivery: 120 days
#3

Supply of 2 Mega Pixel Network Outdoor IR PTZ Camera

Supply of 2 Mega Pixel Network Outdoor IR PTZ Camera - As per Technical Specification.

10 each Delivery: 120 days
#4

Providing Camera Recording Licenses for Existing Video Management Software

Providing Camera Recording Licenses for Existing Video Management Software Primary & Redundancy Server.

78 each Delivery: 120 days
#5

Supply of 8TB Hard Driver

Supply of 8TB Hard Driver NL-SAS ISE 12 Gbps 7.2K 512e 3.5in Hot-Plug for existing storage complete as required.

5 each Delivery: 120 days
#6

Supply of SPF plus SR Optic 10GbE 850nm Module for existing storage

Supply of SPF+SR Optic 10GbE 850nm Module for existing storage complete as required.

4 each Delivery: 120 days
#7

Supply of OM4 LC or LC Fiber Cable

Supply of OM4 LC/LC Fiber Cable (Optics required), 2 Mtr or Existing storage complete as required.

2 each Delivery: 120 days
#8

Supply of Workstation

Supply of Workstation - As per Technical Specification.

2 each Delivery: 120 days
#9

Supply of 55 Inch Display Unit

Supply of 55 Inch Display Unit For Control & Live View - As per Technical Specification.

1 each Delivery: 120 days
#10

Supply of Layer-2 24 Ports PoE plus Managed Switch

Supply of Layer-2 24 Ports PoE++ Managed Switch - As per Technical Specification.

2 each Delivery: 120 days
#11

Supply of 1G Single Mode SFP Transceiver Module

Supply of 1G Single Mode SFP Transceiver Module - As per Technical Specification.

8 each Delivery: 120 days
#12

Supply of 12 Core Single Mode Armoured Optical Fiber Cable

Supply of 12 Core Single Mode Armoured Optical Fiber Cable - As per Technical Specification.

350 mtr Delivery: 120 days
#13

Supply of 12 Port loaded Optical Fiber LIU

Supply of 12 Port loaded Optical Fiber LIU - As per Technical Specification.

1 each Delivery: 120 days
#14

Supply of Optical Fiber Patch Cord

Supply of Optical Fiber Patch Cord-LC-LC 3 Mtrs. - As per Technical Specification.

4 each Delivery: 120 days
#15

Supply of Cat6 4 Pair Unshielded Twisted Pair Cable

Supply of Cat6 4 Pair Unshielded Twisted Pair Cable - LSZH (Indoor Purpose)- As per Technical Specification.

1,700 mtr Delivery: 120 days
#16

Supply of Cat6 4 Pair Shielded Twisted Pair Cable

Supply of Cat6 4 Pair Shielded Twisted Pair Cable - LSZH (Outdoor Purpose)- As per Technical Specification.

700 mtr Delivery: 120 days
#17

Supply of Cat6 24 Port U or UTP Patch Panel

Supply of Cat6 24 Port U or UTP Patch Panel - As per Technical Specification.

1 each Delivery: 120 days
#18

Supply of Cat6 U or UTP Patch Cord

Supply of Cat6 U or UTP Patch Cord- 1Mtr - As per Technical Specification.

39 each Delivery: 120 days
#19

Supply of Cat6 U or UTP Patch Cord

Supply of Cat6 U or UTP Patch Cord- 5Mtr - As per Technical Specification.

5 each Delivery: 120 days
#20

Supply of RJ 45 Connector

Supply of RJ 45 Connector complete as required.

100 each Delivery: 120 days
#21

Supply of 6U Wall Mount Network Rack

Supply of 6U Wall Mount Network Rack with accessory - As per Technical Specification.

1 each Delivery: 120 days
#22

Supply of 3 Core 2.5MM Copper Electrical Cable

Supply of 3 Core 2.5MM Copper Electrical Cable - As per Technical Specification.

1,850 mtr Delivery: 120 days
#23

Supply of Electrical Box with 25 Amp MCB 15 or 16 Amp Socket at Rack End

Supply of Electrical Box with 25 Amp MCB 15/16 Amp Socket at Rack End complete as required.

1 each Delivery: 120 days
#24

Supply of 5 or 6 Amp Shuttered switch socket Combined with Cover Plate and back box

Supply of 5/6 Amp Shuttered switch socket Combined with Cover Plate and back box complete as requred.

20 each Delivery: 120 days
#25

Supply of 4 Way Waterproof Electrical cable junction box with terminal block

Supply of 4 Way Waterproof Electrical cable junction box with terminal block complete as required.

10 each Delivery: 120 days
#26

Supply of 25MM MS Conduit with all fixing accessories

Supply of 25MM MS Conduit with all fixing accessories - As per site requirement.

100 mtr Delivery: 120 days
#27

Supply of 25MM PVC Pipe with all fixing accessories for Indoor

Supply of 25MM PVC Pipe with all fixing accessories for Indoor complete as required.

200 mtr Delivery: 120 days
#28

Supply of 25MM PVC Flexible Pipe for Indoor

Supply of 25MM PVC Flexible Pipe for Indoor complete as required.

100 mtr Delivery: 120 days
#29

Supply of 32MM PVC Pipe with all fixing accessories for Indoor

Supply of 32MM PVC Pipe with all fixing accessories for Indoor complete as required.

700 mtr Delivery: 120 days
#30

Supply of 32MM PVC Flexible Pipe for Indoor

Supply of 32MM PVC Flexible Pipe for Indoor complete as required.

100 mtr Delivery: 120 days
#31

Supply of 25 or 32mm PVC Reinforceable flexible Pipe

Supply of 25/32mm PVC Reinforceable flexible Pipe complete as required.

100 mtr Delivery: 120 days
#32

Laying of 25MM PVC Pipe for Indoor with all fixing accessories

Laying of 25MM PVC Pipe for Indoor with all fixing accessories on/above of false celling or fixing on wall including fixing of suitable saddle /screws etc complete as required.

200 mtr Delivery: 120 days
#33

Laying of 25MM PVC Flexible Pipe for Indoor

Laying of 25MM PVC Flexible Pipe for Indoor complete as required.

100 mtr Delivery: 120 days
#34

Laying of 32MM PVC Pipe with all fixing accessories for Indoor

Laying of 32MM PVC Pipe with all fixing accessories for Indoor with all fixing accessories on/above of false celling or fixing on wall including fixing of suitable saddle /screws etc complete as required.

700 mtr Delivery: 120 days
#35

Laying of 32MM PVC Flexible Pipe for Indoor

Laying of 32MM PVC Flexible Pipe for Indoor complete as required.

100 mtr Delivery: 120 days
#36

Laying of 25 or 32mm PVC Reinforceable flexible Pipe

Laying of 25/32mm PVC Reinforceable flexible Pipe complete as required.

100 mtr Delivery: 120 days
#37

Laying or fixing of MS Conduit including fixing of suitable saddle or screws etc

Laying /fixing of MS Conduit including fixing of suitable saddle /screws etc complete as required.

100 mtr Delivery: 120 days
#38

Laying of Optical Fibre Cable end to end ferruling labeling and termination through HDPE or MS Conduit or GI Conduit or PVC Pipe

Laying of Optical Fibre Cable end to end ferruling labeling & termination through HDPE/MS Conduit/GI Conduit/PVC Pipe complete as required.

350 mtr Delivery: 120 days
#39

Laying of Cat6 U or UTP end to end ferruling labeling and termination through PVC Pipe

Laying of Cat 6 U or UTP end to end ferruling labeling and termination through PVC Pipe complete as required.

1,600 mtr Delivery: 120 days
#40

Laying of Cat6 STP end to end ferruling labeling and termination through HDPE or MS Conduit or GI Conduit or PVC Pipe complete as required

Laying of Cat6 STP end to end ferruling labeling & termination through HDPE/MS Conduit/GI Conduit/PVC Pipe complete as required.

700 mtr Delivery: 120 days
#41

Laying of Electrical Cable end to end ferruling labeling and termination through HDPE or MS Conduit or GI Conduit or PVC Pipe complete as required

Laying of Electrical Cable end to end ferruling labeling & termination through HDPE/MS Conduit/GI Conduit/PVC Pipe complete as required.

1,850 mtr Delivery: 120 days
#42

Mounting, Fixing, Labeling and Dressing of 6U Wall Mount Rack complete as required

Mounting, Fixing, Labeling & Dressing of 6U Wall Mount Rack complete as required.

1 each Delivery: 120 days
#43

Mounting, Fixing and Labeling of All Types of Cameras complete as required

Mounting, Fixing and Labeling of All Types of Cameras complete as required.

39 each Delivery: 120 days
#44

Installation Splicing of all OFC core Rack to Server Rack, Labelling, testing and commissioning of 12 or 24 Port LIU with all its accessories complete as required

Installation Splicing of all OFC core (Rack to Server Rack), Labelling, testing & commissioning of 12/24 Port LIU with all its accessories complete as required.

1 each Delivery: 120 days
#45

Installation of 5 or 6 Amp Shuttered switch socket Combined with Cover Plate and back box complete as required

Installation of 5/6 Amp Shuttered switch socket Combined with Cover Plate and back box complete as required.

20 each Delivery: 120 days
#46

Installation of Electrical Box with 25 Amp MCB 15 or 16 Amp Socket at Rack End complete as required

Installation of Electrical Box with 25 Amp MCB 15/16 Amp Socket at Rack End complete as required.

1 each Delivery: 120 days
#47

Installation, Testing and Commissioning of HDD Storage complete as required

Installation, Testing & Commissioning of HDD Storage complete as required.

5 each Delivery: 120 days
#48

Mounting, Fixing, Installation, testing, labeling and commissioning on the network rack side of U or UTP 24 Port Patch Panel complete as required

Mounting, Fixing, Installation, testing, labeling & commissioning on the network rack side of U/UTP 24 Port Patch Panel complete as required.

1 each Delivery: 120 days
#49

Mounting, Fixing, Installation and Configuration of All Types of Switches complete as required

Mounting, Fixing, Installation & Configuration of All Types of Switches complete as required.

2 each Delivery: 120 days
#50

Installation and Configuration of WorkStation complete as required

Installation & Configuration of WorkStation complete as required.

2 each Delivery: 120 days
#51

Mounting, Fixing, Installation and Configuration of All Types of Display Unit complete as required

Mounting, Fixing, Installation & Configuration of All Types of Display Unit complete as required.

1 each Delivery: 120 days
#52

Configuration of Cameras Recording Licenses for existing Video Management Software primary and redundary server complete as required

Configuration of Cameras Recording Licenses for existing Video Management Software primary & redundary server complete as required.

78 each Delivery: 120 days
#53

Relocation of existing cameras with accessories complete as required

Relocation of existing cameras with accessories complete as required.

20 each Delivery: 120 days
#54

Testing, commissioning ,certification, providing 3 sets of completion diagram and Documentation of Entire Project complete as required

Testing, commissioning ,certification, providing 3 sets of completion diagram & Documentation of Entire Project complete as required.

1 job Delivery: 120 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

Additional Doc 1 (Requested in ATC)

7

Additional Doc 2 (Requested in ATC)

8

Additional Doc 3 (Requested in ATC)

9

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

10

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

4 Updates
#1

Update

29-Aug-2025
#2

Update

29-Aug-2025

Extended Deadline

03-Sep-2025, 11:00 am

Opening Date

03-Sep-2025, 11:30 am

#3

Update

21-Aug-2025
#4

Update

18-Aug-2025

Extended Deadline

01-Sep-2025, 11:00 am

Opening Date

01-Sep-2025, 11:30 am

Technical Results

S.No Seller Item Date Status
1
AMTEL COMMUNICATION PRIVATE LIMITED   Under PMA
-02-09-2025 00:27:23
2
CENEX TECHNOLOGIES PRIVATE LIMITED   Under PMA
-02-09-2025 15:33:11
3
ESTEEM360 ZONE PRIVATE LIMITED   Under PMA
-18-08-2025 16:11:07
4
HIND DEFENCE EQUIPMENTS PRIVATE LIMITED   Under PMA
-03-09-2025 10:29:36
5
P AND C SMARTECH SOLUTIONS PRIVATE LIMITED   Under PMA
-03-09-2025 09:59:49
6
Realsoft Corporation (India)   Under PMA
-03-09-2025 10:03:22
7
VECTRAS ENPROCON LIMITED   Under PMA
-03-09-2025 09:57:01
8
VIHAWK TECH SOLUTIONS PRIVATE LIMITED   Under PMA
-03-09-2025 10:52:14

Financial Results

Rank Seller Price Item
L1
Realsoft Corporation (India)(MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Supply of 2 Mega Pixel Network Dome Camera with Power Adaptor,Supply of 2 Mega Pixel Network Indoor
L2
P AND C SMARTECH SOLUTIONS PRIVATE LIMITED (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Supply of 2 Mega Pixel Network Dome Camera with Power Adaptor,Supply of 2 Mega Pixel Network Indoor

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.