TenderDekho Logo
Active GEM

Government Tender Published for TENSIONER KARAM PN4000 03 SL,WIRE ROPE SS316 DIA 8MM,CABLE EXTREMITY SS,INSTLN OF LIFELINE,SAFETY H

Bid Publish Date

23-Sep-2026, 1:59 pm

Bid End Date

03-Oct-2026, 2:00 pm

EMD

₹28,000

Progress

Issue23-Sep-2026, 1:59 pm
AwardPending

Public procurement opportunity for Hindustan Petroleum Corporation Ltd TENSIONER KARAM PN4000 03 SL, WIRE ROPE SS316 DIA 8MM, CABLE EXTREMITY SS, INSTLN OF LIFELINE, SAFETY HARNESS FULL BODY, FALL ARRESTER BLOCK KARAM PCGS06SS, Emergency Trolley, Low Temperature Gas Protective Suit, Fire Proximity Suit, Leak Control Kit Set, Petroleum Product Clean Up, Oil Spill Dispersant Water Based, Non Sparking Tools, Self Contained Breathing Apparatus, ELSA 15 MIN Emergency Escape Unit, Intrinsically Safe Search Light, FLP OR WP Speaker with Megaphone, Hand Operated Siren as per IS 6026, Fireman Axe Non Sparking, First Aid Box With Kit, Manual Resuscitator, 2 Fold Stretcher Steel, Spanners Set 1 Flat and 1 Ring, Cold Temp Gloves Cryogenic, Electrical Gloves LT, Electrical Gloves HT, Electrical Tester, Chemical Goggles. Quantity: 233 issued by. Submission Deadline: 03-10-2026 14: 00: 00. View full details and respond.

Advertisement

Tender Data

Bid Details

Quantity

233

Category

SAFETY HARNESS FULL BODY

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Group wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Item Category

TENSIONER KARAM PN4000 03 SL , WIRE ROPE SS316 DIA 8MM , CABLE EXTREMITY SS , INSTLN OF LIFELINE , SAFETY HARNESS FULL BODY , FALL ARRESTER BLOCK KARAM PCGS06SS , Emergency Trolley , Low Temperature Gas Protective Suit , Fire Proximity Suit , Leak Control Kit Set , Petroleum Product Clean Up , Oil Spill Dispersant Water Based , Non Sparking Tools , Self Contained Breathing Apparatus , ELSA 15 MIN Emergency Escape Unit , Intrinsically Safe Search Light , FLP OR WP Speaker with Megaphone , Hand Operated Siren as per IS 6026 , Fireman Axe Non Sparking , First Aid Box With Kit , Manual Resuscitator , 2 Fold Stretcher Steel , Spanners Set 1 Flat and 1 Ring , Cold Temp Gloves Cryogenic , Electrical Gloves LT , Electrical Gloves HT , Electrical Tester , Chemical Goggles

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

21

Payment Timelines

Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

365

Delivery Locations

1

Delivery Cities

Bathinda

Delivery Pincodes

151001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
SHIVAM JOHRI151001,HPCL Bathinda Installation, Phoos Mandi, Bathinda-151001BathindaPunjab15100110365-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9934684.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

NA

Office Name

Petroleum House

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 28 Items Sign in for GEM prices

#1

TENSIONER KARAM PN4000 03 SL

As per technical specifications

10 each Delivery: 365 days
#2

WIRE ROPE SS316 DIA 8MM

As per technical specifications

100 meter Delivery: 365 days
#3

CABLE EXTREMITY SS

As per technical specifications

10 each Delivery: 365 days
#4

INSTLN OF LIFELINE

As per technical specifications

10 lump sum Delivery: 365 days
#5

SAFETY HARNESS FULL BODY

As per technical specifications

44 each Delivery: 365 days
#6

FALL ARRESTER BLOCK KARAM PCGS06SS

As per technical specifications

20 each Delivery: 365 days
#7

Emergency Trolley

As per technical specifications

1 each Delivery: 180 days
#8

Low Temperature Gas Protective Suit

As per technical specifications

1 each Delivery: 180 days
#9

Fire Proximity Suit

As per technical specifications

1 each Delivery: 180 days
#10

Leak Control Kit Set

As per technical specifications

1 set Delivery: 180 days
#11

Petroleum Product Clean Up

As per technical specifications

1 set Delivery: 180 days
#12

Oil Spill Dispersant Water Based

As per technical specifications

1 set Delivery: 180 days
#13

Non Sparking Tools

As per technical specifications

1 set Delivery: 180 days
#14

Self Contained Breathing Apparatus

As per technical specifications

2 each Delivery: 180 days
#15

ELSA 15 MIN Emergency Escape Unit

As per technical specifications

2 each Delivery: 180 days
#16

Intrinsically Safe Search Light

As per technical specifications

2 each Delivery: 180 days
#17

FLP OR WP Speaker with Megaphone

As per technical specifications

1 each Delivery: 180 days
#18

Hand Operated Siren as per IS 6026

As per technical specifications

1 each Delivery: 180 days
#19

Fireman Axe Non Sparking

As per technical specifications

1 each Delivery: 180 days
#20

First Aid Box With Kit

As per technical specifications

1 each Delivery: 180 days
#21

Manual Resuscitator

As per technical specifications

1 each Delivery: 180 days
#22

2 Fold Stretcher Steel

As per technical specifications

1 each Delivery: 180 days
#23

Spanners Set 1 Flat and 1 Ring

As per technical specifications

1 set Delivery: 180 days
#24

Cold Temp Gloves Cryogenic

As per technical specifications

4 each Delivery: 180 days
#25

Electrical Gloves LT

As per technical specifications

2 pair Delivery: 180 days
#26

Electrical Gloves HT

As per technical specifications

2 pair Delivery: 180 days
#27

Electrical Tester

As per technical specifications

1 each Delivery: 180 days
#28

Chemical Goggles

As per technical specifications

10 each Delivery: 180 days

Categories 34

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data