Bids are Invited For Supply of 11kV 3 phase, 630Amps, Motorized SCADA compatible Monitoring and Controlling , SF6 Insula in HYDERABAD, TELANGANA

Bid Publish Date

29-Jul-2026, 11:44 am

Bid End Date

29-Aug-2026, 12:00 pm

EMD

₹1,30,000

Value

₹65,00,000

Generate Docs

Progress

Issue29-Jul-2026, 11:44 am
Corrigendum24-Aug-2026
AwardPending

Prasar Bharati Broadcasting Corporation Of India announces a tender for Supply of 11kV 3 phase, 630Amps, Motorized SCADA compatible Monitoring and Controlling, SF6 Insulated Outdoor, totally enclosed, 5Way Ring Main Unit RMU, Insurance, transportation and unloading of RMU at site, Design, fabrication and construction of RCC foundation or plinth for 5Way RMU panels, Laying of 11kV, 3 core, 120 Sqmm XLPE, Aluminium Armoured HT cable from 11kV Feeder structure to RMU panel, Laying of 11kV, 3 core, 120 Sqmm XLPE, Aluminium Armoured HT cable from Outdoor type RMU to 4 panel HT Switchgear, Laying of 11kV, 3 core, 120 Sqmm XLPE, Aluminium Armoured HT cable from 4 panel HT Switchgear to 500 kVA Transformers 2 Nos. , Supply and fixing of outdoor heat shrinkable end standard make termination kits for 11 kV, 120Sq mm XLPE HT Cable for RMU, Supply and fixing of indoor heat shrinkable or end standard make Cable termination kits for 11 kV, 120Sq mm XLPE HT Cable for HT Switchgear Panel and 500KVA Indoor Transformers 2 Nos. , Supply and fixing of indoor heat shrinkable or end standard make Cable termination kits for 11 kV 120Sq mm XLPE HT Cable 500KVA Indoor Transformers 2 Nos, Supply and Providing conventional type Copper plate earthing system for RMU, Excavation and Laying Copper strip from Earth pit terminal to the 5way RMU and Terminations as per TGSPDCL Hyderabad norms, Testing of High Voltage HT Cables, Provision for cable glands in RMU, and providing cable glands, lugs, ferrules, cable clamps and other termination accessories for HT cables. , System integration, trial run, and commissioning of complete 11kV power supply system including synchronization with existing network, Preparation and submission of as-built drawings, test certificates, O and M Manuals and commissioning reports and Towards charges for submission of RMU drawings to TGSPDCL, Hyderabad, Erection or Installation, testing and commissioning of 5 Way RMU units including obtaining approval from, TGSPDCL, Hyderabad Central Electricity Authorities. , Tripping battery system complete with trickle charger operating from 230V mains for use with the tripping circuit of above switch board if necessary, Any other material or work necessary to complete the SITC and Approval from CEA and any other Department in HYDERABAD, TELANGANA. Quantity: 132. Submission Deadline: 29-08-2026 12: 00: 00. Last date to apply is approaching fast!

Tender Data

Bid Details

Quantity

132

Category

Supply of 11kV 3 phase, 630Amps, Motorized SCADA compatible Monitoring and Controlling , SF6 Insulated Outdoor, totally enclosed, 5Way Ring Main Unit RMU

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

32

Past Performance

80 %

Warranty Period

5 years

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Supply of 11kV 3 phase, 630Amps, Motorized SCADA compatible Monitoring and Controlling , SF6 Insulated Outdoor, totally enclosed, 5Way Ring Main Unit RMU , Insurance, transportation and unloading of RMU at site , Design, fabrication and construction of RCC foundation or plinth for 5Way RMU panels , Laying of 11kV, 3 core, 120 Sqmm XLPE, Aluminium Armoured HT cable from 11kV Feeder structure to RMU panel , Laying of 11kV, 3 core, 120 Sqmm XLPE, Aluminium Armoured HT cable from Outdoor type RMU to 4 panel HT Switchgear , Laying of 11kV, 3 core, 120 Sqmm XLPE, Aluminium Armoured HT cable from 4 panel HT Switchgear to 500 kVA Transformers 2 Nos. , Supply and fixing of outdoor heat shrinkable end standard make termination kits for 11 kV, 120Sq mm XLPE HT Cable for RMU , Supply and fixing of indoor heat shrinkable or end standard make Cable termination kits for 11 kV, 120Sq mm XLPE HT Cable for HT Switchgear Panel and 500KVA Indoor Transformers 2 Nos. , Supply and fixing of indoor heat shrinkable or end standard make Cable termination kits for 11 kV 120Sq mm XLPE HT Cable 500KVA Indoor Transformers 2 Nos , Supply and Providing conventional type Copper plate earthing system for RMU , Excavation and Laying Copper strip from Earth pit terminal to the 5way RMU and Terminations as per TGSPDCL Hyderabad norms , Testing of High Voltage HT Cables , Provision for cable glands in RMU, and providing cable glands, lugs, ferrules, cable clamps and other termination accessories for HT cables. , System integration, trial run, and commissioning of complete 11kV power supply system including synchronization with existing network , Preparation and submission of as-built drawings, test certificates, O and M Manuals and commissioning reports and Towards charges for submission of RMU drawings to TGSPDCL, Hyderabad , Erection or Installation, testing and commissioning of 5 Way RMU units including obtaining approval from, TGSPDCL ,Hyderabad Central Electricity Authorities. , Tripping battery system complete with trickle charger operating from 230V mains for use with the tripping circuit of above switch board if necessary , Any other material or work necessary to complete the SITC and Approval from CEA and any other Department

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

62

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Medchal Malkajgiri

Delivery Pincodes

500013

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Banavatu Srinivasarao500013,Doordarshan Kendra Ramanthapur Hyderabad 500013Medchal MalkajgiriTelangana500013160-

Authority Records

MINISTRY OF INFORMATION AND BROADCASTING

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9645082.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 18 Items Sign in for GEM prices

#1

Supply of 11kV 3 phase, 630Amps, Motorized SCADA compatible Monitoring and Controlling , SF6 Insulated Outdoor, totally enclosed, 5Way Ring Main Unit RMU

Supply of 11kV 3 phase, 630Amps, Motorized SCADA compatible Monitoring and Controlling , SF6 Insulated Outdoor, totally enclosed, 5Way Ring Main Unit RMU Consisting of Incoming LBS 2 Nos and Outgoing CB 3 Nos. with voltage and current Metering on all incoming or Outgoing feeders including all the protective devices confirming to standard IS3427 1997 amended to date as detailed below and conforming to TGSPDCTL ,Hyderabad requirements. RMU design and CT PT ratio should be suitable for 320kVA Maximum Demand.

1 set Delivery: 30 days
#2

Insurance, transportation and unloading of RMU at site

Insurance, transportation and unloading of RMU at site

1 job Delivery: 30 days
#3

Design, fabrication and construction of RCC foundation or plinth for 5Way RMU panels

Design, fabrication and construction of RCC foundation / plinth for 5Way RMU panels including anchor bolts, cable trench interface panel to panel and civil works as recommended by OEM and as per TGSPDCL Hyderabad norms.

1 job Delivery: 30 days
#4

Laying of 11kV, 3 core, 120 Sqmm XLPE, Aluminium Armoured HT cable from 11kV Feeder structure to RMU panel

Laying of 11kV, 3 core, 120 Sqmm XLPE, Aluminium Armoured HT cable from 11kV Feeder structure to Outdoor type RMU incomer panel. Work includes excavation of cable trench, laying of HT Cable, filling with sand cushioning, bricks and closing with protective covers trench, providing cable markers and back filling as per TGSPDCL ,Hyderabad norms. Payment shall be as per actuals

20 mtr Delivery: 30 days
#5

Laying of 11kV, 3 core, 120 Sqmm XLPE, Aluminium Armoured HT cable from Outdoor type RMU to 4 panel HT Switchgear

Laying of 11kV, 3 core, 120 Sqmm XLPE, Aluminium Armoured HT cable from Outdoor type RMU to 4 Panel HT Switchgear Work includes excavation of cable trench, laying of HT Cable, filling with sand cushioning, bricks and closing with protective covers trench, providing cable markers and back filling as per TGSPDCL ,Hyderabad norms. Payment shall be as per actuals

40 mtr Delivery: 30 days
#6

Laying of 11kV, 3 core, 120 Sqmm XLPE, Aluminium Armoured HT cable from 4 panel HT Switchgear to 500 kVA Transformers 2 Nos.

Laying of 11kV, 3 core, 120 Sqmm XLPE, Aluminium Armoured HT cable from 4 Panel HT Switchgear to 500 kVA Transformers 2 Nos. Work includes excavation of cable trench, laying of HT Cable, filling with sand cushioning, bricks and closing with protective covers trench, providing cable markers and back filling as per TGSPDCLTL ,Hyderabad norms. Payment shall be as per actuals.

20 mtr Delivery: 30 days
#7

Supply and fixing of outdoor heat shrinkable end standard make termination kits for 11 kV, 120Sq mm XLPE HT Cable for RMU

Supply and fixing of outdoor heat shrinkable / end standard make termination kits for 11 kV, 120Sq mm XLPE HT Cable for RMU

10 nos Delivery: 30 days
#8

Supply and fixing of indoor heat shrinkable or end standard make Cable termination kits for 11 kV, 120Sq mm XLPE HT Cable for HT Switchgear Panel and 500KVA Indoor Transformers 2 Nos.

Supply and fixing of indoor heat shrinkable or end standard make Cable termination kits for 11 kV, 120Sq mm XLPE HT Cable for HT Switchgear Panel and 500KVA Indoor Transformers 2 Nos

8 nos Delivery: 30 days
#9

Supply and fixing of indoor heat shrinkable or end standard make Cable termination kits for 11 kV 120Sq mm XLPE HT Cable 500KVA Indoor Transformers 2 Nos

Supply and fixing of indoor heat shrinkable or end standard make Cable termination kits for 11 kV 120Sq mm XLPE HT Cable 500KVA Indoor Transformers 2 Nos

2 nos Delivery: 30 days
#10

Supply and Providing conventional type Copper plate earthing system for RMU

Supply and Providing conventional type Copper plate earthing system for RMU including termination, interconnections, test links and all accessories as per the drawing enclosed in Annexure C Diagram 2 for completion of the earthing.Copper Strips 50 x 3 mm As per Actuals, Copper Plate, GI Pipe,and any other required materials to complete the Earthing system should be supplied by the tenderer. Copper Purity Certificate for 99.95 Percentage to be submitted for the copper materials supplied for Earthing system.

2 sets Delivery: 30 days
#11

Excavation and Laying Copper strip from Earth pit terminal to the 5way RMU and Terminations as per TGSPDCL Hyderabad norms

Excavation and Laying Copper strip from Earth pit terminal to the 5way RMU and terminations as per TGSPDCL, Hyderabad Norms . Payment shall be as per actuals at the Site

20 mtr Delivery: 30 days
#12

Testing of High Voltage HT Cables

Testing of High Voltage HT Cables including insulation resistance, continuity and sheath integrity before laying of cable

1 job Delivery: 30 days
#13

Provision for cable glands in RMU, and providing cable glands, lugs, ferrules, cable clamps and other termination accessories for HT cables.

Provision for cable glands in RMU, and providing cable glands, lugs, ferrules, cable clamps and other termination accessories for HT cables.

1 lumpsum Delivery: 30 days
#14

System integration, trial run, and commissioning of complete 11kV power supply system including synchronization with existing network

System integration, trial run, and commissioning of complete 11kV power supply system including synchronization with existing network

1 job Delivery: 30 days
#15

Preparation and submission of as-built drawings, test certificates, O and M Manuals and commissioning reports and Towards charges for submission of RMU drawings to TGSPDCL, Hyderabad

Preparation and submission of as-built drawings, test certificates, O and M Manuals and commissioning reports and Towards charges for submission of RMU drawings to TGSPDCL, Hyderabad

1 job Delivery: 30 days
#16

Erection or Installation, testing and commissioning of 5 Way RMU units including obtaining approval from, TGSPDCL ,Hyderabad Central Electricity Authorities.

Erection/Installation, testing and commissioning of 5 Way RMU units including obtaining approval from, TGSPDCL ,Hyderabad / Central Electricity Authorities.

1 job Delivery: 30 days
#17

Tripping battery system complete with trickle charger operating from 230V mains for use with the tripping circuit of above switch board if necessary

Tripping battery system complete with trickle charger operating from 230V mains for use with the tripping circuit of above switch board ( if necessary)

1 set Delivery: 30 days
#18

Any other material or work necessary to complete the SITC and Approval from CEA and any other Department

Any other material/work necessary to complete the SITC and Approval from CEA and any other Department

1 lumpsum Delivery: 30 days

Categories 101

Corrigendum Updates

2 Updates
#1

Update

24-Aug-2026

Extended Deadline

29-Aug-2026, 6:30 am

Opening Date

29-Aug-2026, 7:00 am

#2

Update

19-Aug-2026

Extended Deadline

24-Aug-2026, 6:30 am

Opening Date

24-Aug-2026, 7:00 am

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

Additional Doc 1 (Requested in ATC)

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer