Rural Development Department Bihar High Mast Lighting Tower with LED Flood Lighting System Tender 2026

Bid Publish Date

08-Sep-2026, 8:56 pm

Bid End Date

18-Sep-2026, 9:00 pm

Progress

Issue08-Sep-2026, 8:56 pm
Technical09-Nov-2026, 10:59 am
Financial
AwardCompleted

Tender Overview

The Rural Development Department Bihar is procuring a High Mast Lighting Tower for a large area equipped with an LED Flood Lighting System. The tender references an option clause allowing up to a 25% quantity increase at contracted rates, with delivery timeline adjustments based on the extended period. The bidder must ensure financial stability and establish a Functional Service Centre in the state if not already present, with dedicated service support channels. The procurement emphasizes on-site or carry-in warranty considerations and mandatory service escalation details. The exact start, end dates, and estimated value are not disclosed, but the scope clearly targets a robust, scalable lighting solution for large-area illumination.

Technical Specifications & Requirements

  • Product: High Mast Lighting Tower with an LED Flood Lighting System for large-area illumination.
  • Delivery and quantity: Option clause allows up to 25% quantity increase during contract; delivery period scales with additional quantity and minimum 30 days, subject to original terms.
  • Service infrastructure: Must have a Functional Service Centre in the State of the consignee location; if not present, establish within 30 days post-award; payment linked to documentary evidence of service capability.
  • Support: Dedicated toll-free service line and an Escalation Matrix for service support.
  • Documentation and compliance: Copies of service commitments and post-sales support details to be provided with bid; warranty terms and SLA expectations implied by service-center clause.

Terms & Eligibility

  • Financial due diligence: Bidder must not be under liquidation or similar proceedings; may need to upload a liquidation/solvency undertaking.
  • ATC terms: Buyer-uploaded ATC terms govern procurement conduct; bidders must comply with option quantities and delivery-time calculations.
  • Delivery timing: Base delivery period to be respected with adjustments for increased quantity; minimum 30 days handling in extended periods.
  • After-sales: On-site or carry-in warranty rules apply per product/service arrangement; service-channel obligations are mandatory for bid submission.

Key Specifications

  • Product/service: High Mast Lighting Tower with LED Flood Lighting System

  • Delivery flexibility: Up to 25% quantity increase at contracted rates

  • Delivery timeline: Calculated extension period with minimum 30 days

  • Service requirement: Functional Service Centre in consignee state; establishment within 30 days if absent

  • Support: Dedicated toll-free service line and escalation matrix

Terms & Conditions

  • Option Clause permits 25% quantity variation during contract at same rates

  • Service Centre in Bihar required; establishment within 30 days if not existing

  • Dedicated toll-free support and escalation matrix mandatory

  • Financial integrity: bidder must not be under liquidation or similar proceedings

Important Clauses

Payment Terms

Payment terms linked to service-centre evidence and delivery milestones; ATC governs terms

Delivery Schedule

Delivery period scales with increased quantity; minimum extension of 30 days

Penalties/Liquidated Damages

LD clauses may apply based on delivery and performance failures as per ATC

Bidder Eligibility

  • Not under liquidation or court receivership

  • Demonstrated capability to supply High Mast Lighting Towers with LED systems

  • Evidence of service capability within Bihar or confirmed establishment within 30 days of award

Advertisement

Authority & Contact

Office Name

Block Office Khanpur Samastipur

Grievance Contact

[email protected]

Technical Results

S.No Seller Item Date Status
1
ATAI INFRACON PROJECTS PRIVATE LIMITED   Under PMA
Make : NA Model : SH-HM-16 [28]11-09-2026 16:29:37
2
KHUSHI TRADERS   Under PMA
Make : NA Model : SH-HM-16 [28]18-09-2026 07:50:12
3
M/S-MAA TARA ENTERPRISES   Under PMA
Make : NA Model : SH-HM-16 [28]09-09-2026 21:09:41
4
Maa Gayatri Enterprises   Under PMA
Make : NA Model : SH-HM-16 [28]10-09-2026 08:46:56

Financial Results

Rank Seller Price Item
L1
KHUSHI TRADERS( MSE Social Category:General )    Under PMA
Item Categories : High Mast Lighting Tower for large area with LED Flood Lighting System
L2
Maa Gayatri Enterprises   Under PMA
Item Categories : High Mast Lighting Tower for large area with LED Flood Lighting System
L3
M/S-MAA TARA ENTERPRISES( MSE Social Category:General )    Under PMA
Item Categories : High Mast Lighting Tower for large area with LED Flood Lighting System
L4
ATAI INFRACON PROJECTS PRIVATE LIMITED( MSE Social Category:OBC )    Under PMA
Item Categories : High Mast Lighting Tower for large area with LED Flood Lighting System

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

High Mast Lighting Tower for large area with LED Flood Lighting System (Q3)

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Samastipur

Delivery Pincodes

848117

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Navin Kumar Thakur848117,gram panchayat raj shripurgahar westSamastipurBihar848117115-

Authority Records

RURAL DEVELOPMENT DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9866239.pdf

Main Document

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Advertisement

Categories 5

Required Documents

1

GST Registration Certificate

2

Permanent Account Number (PAN) Card

3

Experience Certificates for similar high mast lighting projects

4

Financial Statements (last 3 years)

5

EMD/Security Deposit as applicable

6

Technical Bid Documents showing LED flood lighting capability

7

OEM Authorizations (if applicable)

8

Proof of Functional Service Centre in Bihar or plan to establish within 30 days of award

9

Proof of Dedicated toll-free service number and escalation matrix

Frequently Asked Questions

Key insights about BIHAR tender market

How to bid for high mast lighting tower tender in Bihar 2026?

Bidders should submit GST and PAN, along with experience certificates for large-area LED lighting projects. Provide financial statements, EMD, and OEM authorizations. Ensure a Functional Service Centre in Bihar or a plan to establish within 30 days of award, plus a toll-free support setup and escalation matrix.

What documents are required for Bihar LED lighting tender submission?

Required documents include GST certificate, PAN, 3-year financials, last 3 years experience certificates for high mast lighting projects, EMD, technical bid, OEM authorizations if applicable, and proof of a Bihar service centre or establishment plan with evidence of toll-free support.

What is the quantity variation clause for this Bihar tender?

The buyer reserves the right to increase or decrease quantity up to 25% at contracted rates. Delivery timelines adjust proportionally, with a minimum 30-day extension; total extension based on (additional quantity/original quantity) × original delivery period.

What service commitments are required for Bihar lighting towers tender?

Bidders must have a Functional Service Centre in Bihar or commit to establishing one within 30 days of award. A dedicated toll-free service line and a documented escalation matrix for service support are mandatory components of bid submission.

What are the delivery and payment expectations for this Bihar LED project?

Delivery terms align with original schedules; any extension due to quantity changes requires minimum 30 days. Payment relies on post-delivery milestones and service-centre compliance; ATC terms will govern final payment conditions.

Which standards or certifications are required for the Bihar lighting tender?

The tender specifies LED lighting capabilities and service commitments; bidders should demonstrate ISO/quality or relevant LED module standards as part of technical bids, along with OEM authorizations if equipment brands are mandated.