Tank Cleaning 50 KL,Tank Cleaning- 200 KL,Tank Cleaning 9 Meter dia,Tank Cleaning 20 Meter Dia,Tank
Bharat Petroleum Corporation Ltd
Progress
Quantity
65
Category
CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS, SEMI UG SUMPS, COLUMN PIPE TO OH TANK etc
Bid Type
Two Packet Bid
Indian Army has released a public tender for CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS, SEMI UG SUMPS, COLUMN PIPE TO OH TANK, WALL PITS AND CONNECTED ALLIED WORKS OF B and R NATURE, CLEANING OF OH TANKS, STATIC WATER TANKS, CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS, CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS, SEMI UG SUMPS, CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS, SEMI UG SUMPS, COLUMN PIPE TO OH TANK, CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS, SEMI UG SUMPS, COLUMN PIPE TO OH TANK etc, CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS, SEMI UG SUMPS, COLUMN PIPE TO OH TANK, WALL etc in HYDERABAD, TELANGANA. Quantity: 65. Submission Deadline: 12-08-2025 11: 00: 00. Download documents and apply online.
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Bharat Petroleum Corporation Ltd
Indian Army
GURDASPUR, PUNJAB
Hindustan Petroleum Corporation Ltd
WEST DELHI, DELHI
Indian Army
UDHAMPUR, JAMMU & KASHMIR
Rural Development Department (rdd) Udhampur
UDHAMPUR, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS, SEMI UG SUMPS, COLUMN PIPE TO OH TANK, WALL PITS AND CONNECTED ALLIED WORKS OF B and R NATURE | M&L for seven stage cleaning and sterilization of inside the RCC Steel Underground semi underground Over head Sedmentation clear water sumps of capacity UG sump reservoir 1400000 gallons through bacteriological treatment by using TERBAC G5 Inchor 5, NB 10, TERBAC G 65, Inoxi60, NB69 AND ULTRA VIOLET RAY. Make rays Cleantech, Inus watertech, satya enterprise. Seven stages are as under. a. First Stage is to drain out the water by using exit valve or high capacity dewatering system. b. Second stage is cleaning all the algae formation inside the tank by using TERBAC G10, Inoxi60, NB69 a laboratory tested branded chemical of the company and scrubbing the walls of the tanks. c. Third strage is fresh water cleaning by high speed jet pump. d. Fourth stage and first bacteria screening is decertification by using TERBACG5, Inohor5, NB10 a Govt Laboratory certified brannded halogen compound. e. Fifth stage is cleaning the floor of water tank by industrial vaccum cleaner. f . Sixth stage is the second bacterio screening and sterilizing method by using ultra violet ray within the tnk and kills all suspended bacteria. g Seventh stage of cleaning and third bacteria screening is to sterilize the floor of the water tank by using laboratory certified, branded strong oxidizing agent TERBAC G65, Inoxi60, NB69. NOTE as per SoW. | 1 | each job | ageusec | 45 |
| 2 | CLEANING OF OH TANKS, STATIC WATER TANKS | All as per ser item No I above but for of inside UG sump reservoir capacity of 500000 Gallons | 1 | each job | ageusec | 45 |
| 3 | CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS | All as per ser item No I above but for of inside UG sump reservoir capacity of 350000 gallons | 2 | each job | ageusec | 45 |
| 4 | CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS, SEMI UG SUMPS | All as per ser item No 01 above but for of inside UG sump reservoir capacity of 25000 gallons | 2 | each job | ageusec | 45 |
| 5 | CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS, SEMI UG SUMPS, COLUMN PIPE TO OH TANK | All as per ser item No 01 above but for of inside UG sump reservoir capacity of 10000 15000 gallons | 11 | each job | ageusec | 45 |
| 6 | CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS, SEMI UG SUMPS, COLUMN PIPE TO OH TANK etc | All as per ser item No 01 above but for of inside overhead reservoir capacity of 350000 gallons | 2 | each job | ageusec | 45 |
| 7 | CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS, SEMI UG SUMPS, COLUMN PIPE TO OH TANK etc | All as per ser item No 01 above but for of inside overhead reservoir capacity of 250000 gallons | 2 | each job | ageusec | 45 |
| 8 | CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS, SEMI UG SUMPS, COLUMN PIPE TO OH TANK etc | All as per ser item No 01 above but for of inside overhead reservoir capacity of 150000 gallons | 6 | each job | ageusec | 45 |
| 9 | CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS, SEMI UG SUMPS, COLUMN PIPE TO OH TANK etc | All as per ser item No 01 above but for of inside overhead reservoir capacity of 50000 gallons | 4 | each job | ageusec | 45 |
| 10 | CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS, SEMI UG SUMPS, COLUMN PIPE TO OH TANK etc | All as per ser item No 01 above but for of inside overhead reservoir capacity of 25000 gallons | 2 | each job | ageusec | 45 |
| 11 | CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS, SEMI UG SUMPS, COLUMN PIPE TO OH TANK etc | S&F CI non raising type sluice valve both ends flanged with CI body, ISI marked, IS 14846, pressure PN 1.6 with SS spindle, clamps and check nuts, operating hand wheel as in replacement of unserviceable sluice valves of any type complete all as specified and directed for the following sizes. | 1 | one job | ageusec | 45 |
| 12 | CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS, SEMI UG SUMPS, COLUMN PIPE TO OH TANK, WALL etc | 100 mm bore. | 5 | each | ageusec | 45 |
| 13 | CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS, SEMI UG SUMPS, COLUMN PIPE TO OH TANK, WALL etc | 150 mm bore. | 5 | each | ageusec | 45 |
| 14 | CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS, SEMI UG SUMPS, COLUMN PIPE TO OH TANK etc | 200mm | 5 | each | ageusec | 45 |
| 15 | CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS, SEMI UG SUMPS, COLUMN PIPE TO OH TANK etc | S&F CI Non Return Valve both ends flanged with CI body, ISI marked, IS 14846, pressure PN 1.6 as in replacement of unserviceable sluice valves of any type complete all as specified and directed for the following sizes. | 1 | one job | ageusec | 45 |
| 16 | CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS, SEMI UG SUMPS, COLUMN PIPE TO OH TANK etc | 100mm bore. | 5 | each | ageusec | 45 |
| 17 | CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS, SEMI UG SUMPS, COLUMN PIPE TO OH TANK etc | 150mm bore. | 5 | each | ageusec | 45 |
| 18 | CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS, SEMI UG SUMPS, COLUMN PIPE TO OH TANK etc | 200mm | 5 | each | ageusec | 45 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | KIRAN ASSOCIATES Under PMA | - | 11-08-2025 13:13:47 | Qualified |
| 2 | MAVEE SYNDICATE Under PMA | - | 11-08-2025 16:28:31 | Qualified |
| 3 | NINDI BUILDERS Under PMA | - | 11-08-2025 18:10:06 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | MAVEE SYNDICATE(MSE)( MSE Social Category:OBC ) Under PMA | ₹43,45,902 | Item Categories : CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS, SEMI UG SUMPS, COLUMN PIPE TO OH TANK, WALL PIT |
| L2 | NINDI BUILDERS (MSE,MII)( MSE Social Category:General ) Under PMA | ₹51,92,200 | Item Categories : CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS, SEMI UG SUMPS, COLUMN PIPE TO OH TANK, WALL PIT |
| L3 | KIRAN ASSOCIATES (MSE,MII)( MSE Social Category:OBC ) Under PMA | ₹54,48,000 | Item Categories : CLEANING OF OH TANKS, STATIC WATER TANKS, UG SUMPS, SEMI UG SUMPS, COLUMN PIPE TO OH TANK, WALL PIT |
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS