Progress
RAQuantity
27
Category
Manufacture and supply of guide pillar assembly for existing Underframe fixtures as per the 3D model
Bid Type
Two Packet Bid
Bharat Earth Movers Limited (Defence Production) invites bids in BANGALORE, KARNATAKA for the manufacture and supply of multiple underframe components, including guide pillar assemblies for existing fixtures, underframe support beams, and underframe support columns type-1 and type-2, aligned to the 3D model. The scope references existing underframe fixtures and QC. A site visit is optional, and bidders must prepare a data sheet with bid, along with GST and accounting details. The tender includes a 25% quantity variation clause and specifies that delivery periods can adjust with contract extensions. No BOQ items are listed.
Product/service names: guide pillar assembly, underframe support beam, underframe support columns type-1 and type-2
Quantities: not disclosed; 25% variation allowed
EMD/Estimated value: not disclosed
Experience: no explicit years stated
Quality/Compliance: Data Sheet alignment with product specifications mandatory
Delivery: terms to be finalized with contract; extended delivery possible under option clause
GST payable per actuals or prevailing rates with max quoted GST%
25% quantity variation and extended delivery period under option clause
Site visit allowed with bidder bearing costs and indemnity obligations
GST as per actuals or prevailing rates; payment terms not disclosed in tender data
Delivery period to commence from order date; extended delivery possible with minimum 30 days
Not specified in tender data; penalties to be defined in contract
Submit PAN, GSTIN, cancelled cheque and EFT Mandate
Provide Data Sheet aligned to offered components
End User Certificate in Buyer format if required
No BOQ items; bid validity and technical alignment to 3D model references
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Manufacture and supply of guide pillar assembly for existing Underframe fixtures as per the 3D model , Manufacture and supply of Underframe support beam for existing Underframe reverse welding fixture UF , Manufacture and supply of Underframe support column type-1 for existing Underframe Quality control f , Manufacture and supply of Underframe support columns type-2 for existing Underframe Quality control
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
TECHNICAL
TECHNICAL
TECHNICAL
TECHNICAL
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
PAN Card
GSTIN certificate
Cancelled cheque
EFT Mandate certified by bank
Data Sheet of offered products
End User Certificate (Buyer format, if requested)
Extended Deadline
27-Apr-2026, 9:00 am
Opening Date
27-Apr-2026, 9:30 am
Extended Deadline
22-Apr-2026, 3:00 pm
Opening Date
22-Apr-2026, 3:30 pm
Start
03-May-2026, 6:00 pm
End
07-May-2026, 2:00 pm
Duration: 92 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ********** Under PMA | Make : Self Model : NEW Title : Manufacture and supply of guide pillar assembly for existing Underframe fixtures as per the 3D model | 11-04-2026 17:31:57 | |
| 2 | ********** Under PMA | Make : BOYD Model : BOYD SMITHS Title : Manufacture and supply of guide pillar assembly for existing Underframe fixtures as per the 3D model | 14-04-2026 15:44:26 | |
| 3 | ********** Under PMA | Make : Unbrand Model : Guide pillar assembly for existing Underframe fixt Title : Manufacture and supply of guide pillar assembly for existing Underframe fixtures as per the 3D model | 15-04-2026 17:01:20 | |
| 4 | ********** Under PMA | Make : Unbrand Model : ET2026_APR02_01 Title : Manufacture and supply of guide pillar assembly for existing Underframe fixtures as per the 3D model | 15-04-2026 14:13:48 |
Key insights about KARNATAKA tender market
Bidders should prepare PAN, GSTIN, cancelled cheque, and bank-certified EFT Mandate. Upload a detailed Data Sheet aligned to offered underframe components and ensure End User Certificate format if requested. Review 3D model references and confirm delivery timelines align with contract terms.
Required documents include PAN, GSTIN, cancelled cheque, EFT Mandate, and the Data Sheet for each offered item. End User Certificate in Buyer format may be requested. Ensure GST applicability is assessed and data sheet matches product specifications to avoid rejection.
Site visits are optional; bidders may inspect installation premises at their own cost. Entry requires indemnity against liabilities. No pre-requisites guarantee information; bid should be prepared with current site conditions and 3D model references in mind.
The purchaser may increase or decrease the quantity up to 25% of the bid quantity at contract placement and during the currency of the contract. Delivery period adjustments follow the calculated formula with a minimum of 30 days extension.
Bidders must upload a Data Sheet that exactly matches the product specifications offered. Mismatches relative to the 3D model references may lead to bid rejection; ensure clarity on dimensions, materials, and tolerances.
GST will be reimbursed as actuals or prevailing rates, whichever is lower, with the maximum of the quoted GST percentage. Bidders should quote GST thoughtfully and ensure compliance with applicable GST rules.
If the Buyer requires an End User Certificate, bidders must provide it in the Buyer’s standard format. Confirm whether EUC is required during bid submission and prepare accordingly to avoid bid rejection.
Sign up now to access all documents
Main Document
TECHNICAL
TECHNICAL
TECHNICAL
TECHNICAL
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS