TenderDekho Logo
Closed GEM

Contract Bidding Open For 12 Core ADSS Unarmoured Single Mode OFC as per TEC GR No 85200 Colon 2022,FXO oblique FXS Bracket o in WEST KAMENG, ARUNACHAL PRADESH

Bid Publish Date

18-Sep-2026, 1:55 pm

Bid End Date

29-Sep-2026, 2:00 pm

Progress

Issue18-Sep-2026, 1:55 pm
AwardPending

Public procurement opportunity for Indian Army 12 Core ADSS Unarmoured Single Mode OFC as per TEC GR No 85200 Colon 2022, FXO oblique FXS Bracket on 8 into E1 plus 4 into 1G Ethernet plus 8FXO oblique S Plus Bracket on 1 plus 1Bracket off SFP 80 Km, STM bracket on 2 into 1 Gig SFP 120 Km Single Fiber plus 4 into Ethernet plus 12 x E1, OTDR 35db, Splicing Machine, 1G SFP Module Bracket on 80 Km Bracket off Single Fiber, 10G SFP Module Bracket on 80 Km Bracket off Single Fiber, Optical to Ethernet Convertor bracket on OTE bracket off with SFP Module 80 Km 1G, Optical to Ethernet Convertor bracket on OTE bracket off with SFP Module 80 Km 10G, Jointing Kit 12 Core OFC Round Joint Closure in WEST KAMENG, ARUNACHAL PRADESH. Quantity: 172 issued by. Submission Deadline: 29-09-2026 14: 00: 00. View full details and respond.

Advertisement

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

172

Category

12 Core ADSS Unarmoured Single Mode OFC as per TEC GR No 85200 Colon 2022

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

34

OEM Avg. Turnover

274

Past Performance

50 %

Warranty Period

7 days

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

12 Core ADSS Unarmoured Single Mode OFC as per TEC GR No 85200 Colon 2022 , FXO oblique FXS Bracket on 8 into E1 plus 4 into 1G Ethernet plus 8FXO oblique S Plus Bracket on 1 plus 1Bracket off SFP 80 Km , STM bracket on 2 into 1 Gig SFP 120 Km Single Fiber plus 4 into Ethernet plus 12 x E1 , OTDR 35db , Splicing Machine , 1G SFP Module Bracket on 80 Km Bracket off Single Fiber , 10G SFP Module Bracket on 80 Km Bracket off Single Fiber , Optical to Ethernet Convertor bracket on OTE bracket off with SFP Module 80 Km 1G , Optical to Ethernet Convertor bracket on OTE bracket off with SFP Module 80 Km 10G , Jointing Kit 12 Core OFC Round Joint Closure

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

38

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

West Kameng

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-West KamengWest Kameng--6060-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9874705.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 10 Items Sign in for GEM prices

#1

12 Core ADSS Unarmoured Single Mode OFC as per TEC GR No 85200 Colon 2022

12 Core ADSS Unarmoured Single Mode OFC as per TEC GR No 85200 Colon 2022

60 km Delivery: 60 days
#2

FXO oblique FXS Bracket on 8 into E1 plus 4 into 1G Ethernet plus 8FXO oblique S Plus Bracket on 1 plus 1Bracket off SFP 80 Km

FXO oblique FXS Bracket on 8 into E1 plus 4 into 1G Ethernet plus 8FXO oblique S Plus Bracket on 1 plus 1Bracket off SFP 80 Km

12 nos Delivery: 60 days
#3

STM bracket on 2 into 1 Gig SFP 120 Km Single Fiber plus 4 into Ethernet plus 12 x E1

STM bracket on 2 into 1 Gig SFP 120 Km Single Fiber plus 4 into Ethernet plus 12 x E1

4 nos Delivery: 60 days
#4

OTDR 35db

OTDR 35db

3 nos Delivery: 60 days
#5

Splicing Machine

Splicing Machine

3 nos Delivery: 60 days
#6

1G SFP Module Bracket on 80 Km Bracket off Single Fiber

1G SFP Module Bracket on 80 Km Bracket off Single Fiber

14 nos Delivery: 60 days
#7

10G SFP Module Bracket on 80 Km Bracket off Single Fiber

10G SFP Module Bracket on 80 Km Bracket off Single Fiber

14 nos Delivery: 60 days
#8

Optical to Ethernet Convertor bracket on OTE bracket off with SFP Module 80 Km 1G

Optical to Ethernet Convertor bracket on OTE bracket off with SFP Module 80 Km 1G

16 nos Delivery: 60 days
#9

Optical to Ethernet Convertor bracket on OTE bracket off with SFP Module 80 Km 10G

Optical to Ethernet Convertor bracket on OTE bracket off with SFP Module 80 Km 10G

16 nos Delivery: 60 days
#10

Jointing Kit 12 Core OFC Round Joint Closure

Jointing Kit 12 Core OFC Round Joint Closure

30 nos Delivery: 60 days

Categories 6

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement