TenderDekho Logo
Closed GEM

National Aluminium Company Limited Muffle Furnace, Analytical Balance 220g, Fire & Flash Point Tester Procurement Angul Odisha 2026

Bid Publish Date

25-Mar-2026, 9:20 am

Bid End Date

23-Apr-2026, 10:00 am

Location

Progress

Issue25-Mar-2026, 9:20 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

5

Category

MUFFLE FURNACE

Bid Type

Two Packet Bid

Categories 28

Tender Overview

National Aluminium Company Limited (NALCO) in Angul, Odisha invites bids for the procurement of multiple laboratory and furnace equipment, including a MUFFLE FURNACE, ANALYTICAL BALANCE 220 GM, FIRE & FLASH POINT TESTER, DISTILLATION APPARATUS, and KINEMATIC VISCOSITY BATH. The scope encompasses Supply, Installation, Testing and Commissioning of the goods. Bidders should anticipate an order covering diverse lab and metallurgical equipment, with payment terms: 80% within 30 days of receipt and inspection, and 20% after installation with 15 days observation. GST treatment is purchaser’s responsibility; GST refunds follow actuals or applicable rates. The tender emphasizes certificate upload and post-award security as per GeM GTC and ATC clauses. Unique aspects include multiple equipment categories under a single procurement and flexible security deposit options (PBG, DD, FDR, or online RTGS). Location is Angul, Odisha, with no BOQ itemization reported. This procurement is aligned with NABL/IS/ISO expectations implied by the scope, and requires timely delivery, installation and commissioning with engineer-certified acceptance.

Technical Specifications & Requirements

  • Product categories: MUFFLE FURNACE, ANALYTICAL BALANCE 220 GM, FIRE & FLASH POINT TESTER, DISTILLATION APPARATUS, KINEMATIC VISCOSITY BATH
  • Scope: Supply, Installation, Testing and Commissioning of all listed equipment
  • Delivery/Acceptance: Inspection at smelter plant in Angul; 30-day 80% payment after receipt, 15-day post-installation observation for 20%
  • Documentation: Certificates required at bid submission per ATC; GST handling as per bidder’s invoice in GSTR 2A
  • Standards/Certifications: Not specified in available data; bid documents expect standard conformance to lab/metallurgical equipment norms
  • Other: GeM GTC-compliant security deposits via DD, FDR, or online RTGS; delivery timeline not disclosed; no BOQ items listed.

Terms, Conditions & Eligibility

  • EMD/PBG options: DD in favor of National Aluminium Co. Ltd. (Angul), FDR acceptable, or online RTGS/IBN with proof within 15 days of award
  • Payment terms: 80% within 30 days of receipt and inspection; 20% after installation and 15-day observation with certification from NALCO engineer
  • GST: GST payable by bidder; refunds per actuals or applicable rate, limited to quoted GST
  • Documentation: Upload all required certificates during bid; failure to provide may lead to rejection
  • Delivery/Installation: Supply, installation, testing and commissioning included; terms require engineer-in-charge certification
  • ATC/Corrigendum compliance: Bids must include all requested certificates and documents as per ATC
  • No BOQ items: Tender shows 0 items; scope remains as listed equipment categories

Key Specifications

  • Muffle Furnace: equipment category for metallurgical labs; no explicit capacity or temperature spec provided

  • Analytical Balance 220 g: precision balance suitable for chemical analysis, no Calibration/verification standard listed

  • Fire & Flash Point Tester: portable or benchtop model suitable for liquid fuel testing, no standard code provided

  • Distillation Apparatus: laboratory distillation setup, no specified temperatures or head configurations

  • Kinematic Viscosity Bath: bath for viscosity testing, no viscosity range or temp control spec provided

Terms & Conditions

  • 80% payment within 30 days after receipt and inspection

  • 20% payment after installation with 15 days observation and engineer certification

  • Bid requires GST compliance and multiple security deposit options (DD/FDR/RTGS)

Important Clauses

Payment Terms

80% within 30 days from receipt and successful inspection; 20% after installation and 15-day observation with engineer-in-charge certification

Delivery Schedule

Supply, installation, testing and commissioning included; delivery timeline not specified in data

Penalties/Liquidated Damages

Not specified in data

Bidder Eligibility

  • Experience in supplying/metallurgical laboratory equipment

  • Financial stability demonstrated by statements

  • Compliant with GST and GeM GTC security deposit rules

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

MUFFLE FURNACE , ANALYTICAL BALANCE 220 GM , FIRE & FLASH POINT TESTER , DISTILLATION APPARATUS , KINEMATIC VISCOSITY BATH

Authority Records

MINISTRY OF MINES

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 12

GeM-Bidding-9053868.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar equipment supply

4

Financial statements or proof of financial status

5

EMD/Payment security documents (DD, FDR, or RTGS transfer proof)

6

Technical compliance certificates for each equipment category

7

OEM authorizations or dealership certificates (if applicable)

Frequently Asked Questions

Key insights about ODISHA tender market

How to bid for Nalco Angul laboratory equipment tender 2026?

Bidders must submit GST registration, PAN, experience certificates, financial statements, and EMD or PBG as per GeM GTC. Provide OEM authorization if required and upload all technical certificates. The scope covers supply, installation, testing, and commissioning with 80% payment after receipt and 20% after installation.

What documents are required for Nalco Angul equipment tender 2026?

Required documents include GST certificate, PAN, company financials, experience certificates for similar equipment, EMD security deposit via DD/FDR or online RTGS, technical compliance certificates, and OEM authorizations. Upload these at bid submission per ATC; ensure GST reflects in your invoice.

What are the payment terms for Nalco Angul procurement 2026?

Payment terms specify 80% within 30 days of receipt and successful inspection, with the remaining 20% after installation and 15 days observation as certified by the NALCO engineer-in-charge. GST payment follows invoice reflection in GSTR 2A.

Which equipment categories are included in Nalco Angul tender 2026?

The tender covers MUFFLE FURNACE, ANALYTICAL BALANCE 220 GM, FIRE & FLASH POINT TESTER, DISTILLATION APPARATUS, and KINEMATIC VISCOSITY BATH. Each item falls under metallurgical and laboratory instrumentation procurement with supply, installation, testing and commissioning.

What forms of EMD or security deposit are accepted for Nalco Angul bid?

Accepted forms include Account Payee DD in favor of National Aluminium Co. Ltd., FDR, and online RTGS/IBN transfers to the specified SBI account, with scanned proof due within 15 days of award.

Does Nalco Angul require any specific standards for equipment 2026?

Standards are not explicitly listed in the data. Bidders should provide standard-compliant technical certificates and OEM authorizations as applicable, ensuring the equipment meets typical lab/metallurgical norms for furnaces and analytical balances.

What is the delivery/installation requirement for Nalco Angul tender 2026?

The scope includes Supply, Installation, Testing and Commissioning with acceptance documented by an engineer-in-charge. The exact delivery timeline is not disclosed, but payment is contingent on successful inspection and commissioning.

How to verify GST treatment and refunds for Nalco Angul tender?

GST is the bidder’s responsibility; refunds or reimbursements follow actuals or applicable rates, subject to the quoted GST percentage. Ensure tax invoices are correctly reflected in GSTR 2A for processing.