Progress
RACentral Coalfields Limited invites bids for trolley bags to support operations in Bokaro, Jharkhand. The tender includes an option to increase or decrease the bid quantity by up to 25% and to extend delivery time accordingly. After contract award, bidders must submit Detailed Design Drawings within 5 days for approval; delays in approval will push delivery timelines without LD. The contract requires bidders to demonstrate financial stability and prior government/PSU supply experience, with an emphasis on data sheet alignment and post-award design compliance. Unique aspects include the option clause and mandatory design approvals prior to fabrication, ensuring conformity to buyer-specified drawings and timelines.
Product: trolley bags
Delivery: contingent on 5-day design approval window
Quantity: ±25% option
Standards: not specified in tender data; ensure data sheet alignment
OEM/Importer: registered Indian office for after-sales service
Option quantity: +/-25% during contract term with delivery recalculation
5-day design approval; modifications provided within 5 days
Data Sheet alignment mandatory; mismatch risks bid rejection
Delivery period starts after approval of Detailed Design Drawings; option-driven extensions apply with minimum 30 days, calculated as (Additional quantity ÷ Original quantity) × Original delivery period
Payment terms not explicitly specified in excerpt; typically aligned with delivery acceptance and MT/LD terms as per contract
LD details not provided; specify in final contract based on delivery delays and performance criteria
Not under liquidation, court receivership, or bankruptcy
One year prior supply of similar trolley bag products to government/PSU
OEM or Authorized Seller for imported items with Indian office for after-sales service
Start
28-Aug-2026, 7:00 pm
End
29-Aug-2026, 7:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
135
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
70 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Trolley Bag
Payment Timelines
Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Bokaro
Delivery Pincodes
829144
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Suresh Kumar Singh | 829144,GM Office, Dhori Area, CCL, Phusro | Bokaro | Jharkhand | 829144 | 135 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
PAN card
Experience certificates showing prior similar government/PSU supply
Financial statements / net worth documentation for OEM
Data Sheet of offered trolley bag product
OEM authorization for imported items (registered Indian office)
Undertaking of financial health and non-liquidation status
Any prior contract copies supporting 1-year experience requirement
Key insights about JHARKHAND tender market
Bidders should prepare GST, PAN, and experience certificates, submit a Data Sheet aligned to the offered trolley bag, and provide OEM authorization for imported items. Ensure compliance with the 1-year government/PSU supply experience and demonstrate financial viability. Follow the 5-day design drawing approval process after award.
Required documents include GST registration, PAN, experience certificates showing prior government/PSU supply, OEM authorization for imported items, financial statements proving net worth, Data Sheet of the offered trolley bag, and an undertaking of financial health to negate liquidation risk.
Delivery begins after Detailed Design Drawings are approved. An option to adjust quantity by ±25% exists, with the extended delivery period calculated as (Additional quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
The tender requires ISI marked or equivalent standards where specified; ensure Data Sheet indicates compliance. If imported, OEM authorization and Indian service office are mandatory; bid may be rejected for parameter mismatch.
The purchaser may increase or decrease the bid quantity by up to 25% at contract placement or during currency. Delivery time extends proportionally with the quantity change, subject to a minimum 30 days.
If buyer approval is delayed, delivery period is refixed for the delay duration, with no liquidated damages for the period of delay caused by buyer’s drawing approval process.
Bidders or OEMs must have regularly manufactured and supplied similar trolley bag products to a Central/State Govt/PSU for at least 1 year before bid opening; copies of relevant contracts must be submitted with the bid.
Imported items require OEM or Authorized Seller with a registered Indian office for after-sales service; submit an official certificate confirming this arrangement as part of bid submission.