Bid Publish Date
15-May-2025, 1:00 pm
Bid End Date
06-Jun-2025, 1:00 pm
EMD
₹20,000
Value
₹9,66,000
Location
Progress
Quantity
392
Bid Type
Two Packet Bid
Jawaharlal Nehru Port Trust announces a tender for Trainingcenter1, Trainingcenter2, Trainingcenter3, Trainingcenter4, Trainingcenter5, Trainingcenter6, Trainingcenter7, Trainingcenter8, Trainingcenter9, Trainingcenter10, Trainingcenter11, Trainingcenter12, Trainingcenter13, Trainingcenter14, Trainingcenter15, Trainingcenter16 in RAIGAD, MAHARASHTRA. Quantity: 392. Submission Deadline: 06-06-2025 13: 00: 00. Last date to apply is approaching fast!
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Trainingcenter1 | AIR HANDLING UNIT Supply installation testing and commissioning of Double skin air handling unit in comprising of fan section with direct driven plug fan cooling section with 8 rows deep cooling coil pre filter having efficiency 90 percent down to 10 micron filters the outdoor skin will be 0.6 mm PPGI and inner skin 0.6 mm PPGI sheet Unit shall be horizontal draw through type arranged for horizontal discharge Capacity 1500 cfm 50 mmwg | 1 | nos | [email protected] | 90 |
| 2 | Trainingcenter2 | Refrigerant pipe with insulation 8.5 TR suction line | 20 | rmt | [email protected] | 90 |
| 3 | Trainingcenter3 | Refrigerant pipe with insulation 8.5 TR Discharge Line | 20 | rmt | [email protected] | 90 |
| 4 | Trainingcenter4 | Miscellaneous items like controls for condensing units like expansion valves hand shut off valves catch all dryers thermostats complete with first charged of refrigerant gas | 2 | nos | [email protected] | 90 |
| 5 | Trainingcenter5 | AHU drain pipe line from AHU to drain area with insulation | 10 | rmt | [email protected] | 90 |
| 6 | Trainingcenter6 | AIR DISTRIBUTION SYSTEM Ducts shall be made of GSS with curves and bends where indicated for easy flow of air an ensured to be air tight by applying silicon sealant after fabrication hangers shall be provided to GI ducts and shall be not more than 2.5 m apart 24 Gauge 0.63 mm | 10 | sqmt | [email protected] | 90 |
| 7 | Trainingcenter7 | Thermal insulation 25 mm thick with cross link polyethylene for supply air duct Thermal insulation with cross link polyethylene for return air duct | 30 | sqmt | [email protected] | 90 |
| 8 | Trainingcenter8 | Canvas connection for AHU | 1 | nos | [email protected] | 90 |
| 9 | Trainingcenter9 | ELECTRICAL PANEL SITC AHU Control Panel with MCB and starter with LED indicator as instructed and as directed by OIC-ES IP 55 Fuseless control Floor Mounted | 1 | nos | [email protected] | 90 |
| 10 | Trainingcenter10 | Single compression gland | 4 | nos | [email protected] | 90 |
| 11 | Trainingcenter11 | SITC of Power cable for Electrical Panel 4C by 2.5 Sqmm | 20 | rmt | [email protected] | 90 |
| 12 | Trainingcenter12 | SITC Green Colour Earthing Cable 2.5 Sqmm for all 3 Phase Equipments | 20 | rmt | [email protected] | 90 |
| 13 | Trainingcenter13 | Temperature Sensor 50 150 and 4 to 20 ma | 1 | nos | [email protected] | 90 |
| 14 | Trainingcenter14 | M S Fabrication for AHU and Condensing Unit | 250 | kg | [email protected] | 90 |
| 15 | Trainingcenter15 | Electrical control panel for Air curtain | 1 | nos | [email protected] | 90 |
| 16 | Trainingcenter16 | Existing AHU and system Dismantling and keeping in store | 1 | lot | [email protected] | 90 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about MAHARASHTRA tender market
The eligibility requirements to participate include being a registered entity allowed to operate within the relevant jurisdiction. Bidders must show proven experience in HVAC projects along with a solid financial standing to ensure they can handle the project effectively. All necessary documentation proving compliance with these criteria should be submitted with the tender proposal.
The technical specifications for the HVAC systems require adherence to multiple performance and safety standards. This includes certifications for the AHU being compliant with recognized industrial standards. Additionally, the selected equipment must demonstrate energy efficiency and provide necessary documentation for ongoing maintenance and operational guidelines.
Payment terms will typically be structured based on milestones achieved during the project. It usually involves an upfront payment followed by subsequent installments released upon the completion of specific phases, alongside warranties and performance guarantees from the selected contractor to ensure satisfactory delivery of project milestones.
Documents must be submitted electronically via the designated portal outlined in the tender guidelines. Bidders are urged to follow the submission criteria strictly, ensuring that all required documents such as technical proposals, financial breakdowns, and necessary compliance certificates are included in a complete submission.
Yes, there are special provisions for Micro, Small, and Medium Enterprises (MSEs) and startups. They may receive benefits in the evaluation process aimed at encouraging greater participation from smaller businesses, fostering local entrepreneurship and enhancing local content in line with national procurement policies.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS