Height Adjustable Table
Rural Development Department
BANKA, BIHAR
Menu
The Rural Development Department, Bihar, invites bids for the supply and installation of height adjustable tables (Q3). The contract covers Supply, Installation, Testing, Commissioning, Operator Training, and any required statutory clearances. Estimated value and quantity are not disclosed. Bidders must adhere to the option clause allowing up to 25% quantity variation and extended delivery periods, with delivery timelines calculated per the formula in the terms. A critical differentiator is the mandatory ISO 9001 certification for the bidder or OEM. This procurement emphasizes compliance, traceable performance, and post-installation support within Bihar.
Key technical points include:
Mandatory documentation includes:
Product/service: Height adjustable tables (Q3)
Scope includes: Supply, Installation, Testing, Commissioning, Operator Training, statutory clearances
Certification requirement: ISO 9001 (bidder or OEM)
Delivery clause: up to 25% quantity variation; delivery period adjustments per formula with minimum 30 days
Documentation emphasis: product brochure, proof of experience, financials, ITRs, GSTIN, PAN
ATC/acceptance: Mandatory ATC Acceptance Letter and compliance with additional terms
EMD amount not disclosed in the tender data; verify at bid submission
Bid quantity may increase by up to 25% during contract and currency period
Scope requires delivery, installation, testing, commissioning, and operator training
Not specified in provided data; verify in final ATC and SI terms during bid submission
Delivery starts after original delivery order; extended period applies if option clause exercised; minimum 30 days for additional time
Not detailed in provided data; review ATC for LD or penalties during contract
ISO 9001 certification for bidder or OEM
Experience in supplying/installing office furniture or similar equipment
Compliance with GST, PAN, and financial documentation as per required years
Rural Development Department
BANKA, BIHAR
Rural Development Department
BHAGALPUR, BIHAR
Panchayati Raj Department
BANKA, BIHAR
Rural Development Department
BHAGALPUR, BIHAR
Rural Development Department
BHAGALPUR, BIHAR
Tender Results
Loading results...
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about BIHAR tender market
Bidders must submit ATC Acceptance Letter, ISO 9001 certification for the bidder or OEM, product brochure, proof of experience, PAN, GSTIN, financials for last 3 years, ITRs, GSTR-3B, MSME/ZED certificates, CVC certificate, Non-Blacklist declaration, and the required ATC documentation. Ensure compliance with the 25% quantity option and minimum 30-day delivery extension rule.
Required documents include Experience Certificate & Past Performance, Product Specification Brochure, Proof of Relevant Experience, PAN Card, GSTIN with copies, Audited financial statements for 3 years, ITRs, GSTR-3B (6 months), MSME & ZED certificates, CVC certificate, Non-Blacklist on stamp paper, and the ATC Acceptance Letter.
Bidders must have ISO 9001 certification (for the bidder or OEM). The ATC also requires acceptance of additional terms. Ensure all supplied tables meet the ISO 9001 quality management framework and provide relevant certification documents during bid submission.
The purchaser reserves the right to increase or decrease the bid quantity up to 25% at contract placement and during the contract currency, at contracted rates. Delivery time adjusts per the formula (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Scope includes Supply, Installation, Testing, Commissioning, and Training of operators. Delivery timing follows the option clause; installation and commissioning occur after delivery, with statutory clearances if required. Ensure training dates align with project rollout in the Bihar region.
Submit last 3 financial years’ Profit & Loss and Balance Sheet or turnover certificate (CA audited with UDIN), ITRs, and GSTR-3B for the last 6 months. These accompany PAN and GSTIN copies to establish financial viability and tax compliance for Bihar procurement.
An ATC Acceptance Letter confirming acceptance of Additional Terms & Conditions is mandatory. It binds bidders to the overall terms structure, including quantity variation, delivery timelines, and compliance with ISO 9001 and other stated ATCs.
Statutory clearances, if any, must be obtained as part of scope. The bidder should verify local Bihar regulations, ensure compliance with applicable furniture safety standards, and include clearance documentation in the handover package to support post-installation approvals.
Rural Development Department
📍 KATIHAR, BIHAR
Bhagalpur District Panchayats
📍 BHAGALPUR, BIHAR
Sign up now to access all documents
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Choose from flexible plans to access tender documents instantly
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS