TenderDekho Logo
Closed GEM

Open Tender for WAC Mntc,Replacement,Rewinding of Fan,C L Light Repairing,AFD Mntc,O and M in NORTH 24 PARGANAS, WEST BENGAL

Bid Publish Date

13-Feb-2025, 4:22 pm

Bid End Date

26-Feb-2025, 5:00 pm

EMD

₹31,140

Value

₹15,56,980

Progress

RA
Issue13-Feb-2025, 4:22 pm
Reverse AuctionCompleted
AwardCompleted
Explore all 5 tabs to view complete tender details

Quantity

258

Category

O and M

Bid Type

Two Packet Bid

Categories 58

Public procurement opportunity for Bharat Sanchar Nigam Limited Portal(bsnl) WAC Mntc, Replacement, Rewinding of Fan, C L Light Repairing, AFD Mntc, O and M in NORTH 24 PARGANAS, WEST BENGAL. Quantity: 258 issued by. Submission Deadline: 26-02-2025 17: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

WAC Mntc , Replacement , Rewinding of Fan , C L Light Repairing , AFD Mntc , O and M

Authority Records

MINISTRY OF COMMUNICATIONSTELECOMMUNICATIONS DEPARTMENTBHARAT SANCHAR NIGAM LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-7520388.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 6 Items Sign in for GEM prices

#1

WAC Mntc

Comprehensive maintenance of following capacity WAC / Split AC unit and its associated power feeding arrangement comprising of MCB, Industrial Plug and socket, interconnection lead / cord including replacement of faulty spares, charging of refrigerant, repairing / rewinding of cooling motor and blower motor, replacement of faulty compressor, cleaning of filter, cooling coil and condenser coil etc. for smooth operation of the AC units complete as reqd. a) 1.5 TR capacity Split / Window AC units (18 jobs/month)

216 job Delivery: 365 days
#2

Replacement

Replacement of faulty 36/40 watt fl. Tubes with 20 watt retrofit/new LED light.

10 nos Delivery: 365 days
#3

Rewinding of Fan

Rewinding of faulty ceiling fan 1200/1400 mm sweep motor with good quality copper wire.

5 nos Delivery: 365 days
#4

C L Light Repairing

Replacement of existing faulty Compound light lamps with 30 watt LED lamp.

3 nos Delivery: 365 days
#5

AFD Mntc

Comprehensive maintenance of AFD system of the entire building (System of different floors) complete with replacement of faulty items as detectors and repairing of other component such as Main control panel, Local control panel, Manual call point, Hooters etc. as reqd.

12 month Delivery: 365 days
#6

O and M

Operation of Electromechanical services at Barrackpore TE Bldg & Area Manager office, Barrackpore, CTD as per specification and details of services (Inventory) etc. attached.

12 month Delivery: 365 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC)

11

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

12

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Reverse Auction Schedule

Completed

Start

05-Mar-2025, 5:00 pm

End

07-Mar-2025, 5:00 pm

Duration: 48 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
ASHOKA ELECTRIC CO   Under PMA
-21-02-2025 16:04:43
2
bhavatarini refrigeration   Under PMA
-26-02-2025 11:45:53

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1bhavatarini refrigeration(MSE)   Under PMA Winner ₹10,96,264Item Categories : WAC Mntc,Replacement,Rewinding of Fan,C L Light Repairing,AFD Mntc,O and M
L2ASHOKA ELECTRIC CO (MSE,MII)   Under PMA₹13,09,025Item Categories : WAC Mntc,Replacement,Rewinding of Fan,C L Light Repairing,AFD Mntc,O and M

🎉 L1 Winner

bhavatarini refrigeration(MSE)   Under PMA

Final Price: ₹10,96,264

Frequently Asked Questions

Key insights about WEST BENGAL tender market

What are the eligibility requirements for bidders?

The eligibility requirements for bidders include being a registered legal entity with a minimum average annual turnover of INR 7 Lakhs for the last three years, demonstrating past performance of at least 80%, and submitting various documents such as OEM certifications and financial compliance certificates as stipulated in the tender.

What certifications are required to participate in the tender?

Bidders must provide several certificates including OEM Authorization Certificates, supporting documents for experience and turnover exemptions (if applicable), and detailed documentation proving compliance with the Bill of Quantities specifications.

How is the bid registration process conducted for this tender?

The registration process for submitting bids involves ensuring all required documentation is prepared in advance, particularly the EMD of INR 31,140. Bidders must follow specific submission guidelines outlined in the tender document, ensuring that all files meet the specified format for consideration.

What are the technical specifications for fan and lighting repairs?

The technical specifications for the repair and maintenance of fans and ceiling lights include compliance with the quality standards outlined in the BoQ. Bidders must submit supporting documentation demonstrating compliance with these specifications to ensure eligibility during evaluation.

What is the evaluation and selection process for this tender?

The evaluation process will utilize a total value-wise evaluation where bids are assessed based on technical compliance, financial viability, and past project performance. Suppliers will be notified of the results post-evaluation, where the chosen candidates will comply with bid submission processes.