Vertical Blinds (V2)
Office Of Dg (ace)
TIRUVALLUR, TAMIL NADU
Bid Publish Date
23-Feb-2026, 12:48 pm
Bid End Date
27-Feb-2026, 8:00 pm
Location
Progress
Quantity
500
Bid Type
Two Packet Bid
Organization: Indian Army, Department of Military Affairs. Procurement: Figure 8 Descender (V2) – Q3 category, for field deployment at Siachen Battle School, Siachen Glacier Base Camp, Leh, Ladakh (194101). Scope: supply with optional 25% quantity increase during contract, delivery terms tied to last original delivery date, and installation/commissioning at the high-altitude site. Estimated value and exact EMD are not disclosed; emphasis on non-obsolescence and OEM authorization. Uniqueness: high-altitude, remote installation with strict lifetime shelf-life and ongoing supply confidence.
25% quantity variation allowed during contract and extended period calculations
Delivery to high-altitude Siachen site with installation if scope includes commissioning
3 years government supply experience or OEM authorization required
Not disclosed in tender data; default government procurement practice applies; ensure OEM/authorisation and submission of EFT mandate
Delivery begins after last date of original delivery order; extended delivery time formula provided; minimum extension 30 days
Not specified; apply standard government LD for late delivery if cited in contract
Not in liquidation or similar proceedings; provide undertaking
3 years of regular manufacturing/supply to Central/State Govt/PSU for same/similar category products
OEM authorization required if bid via distributor/service provider
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
Office Of Dg (ace)
TIRUVALLUR, TAMIL NADU
Indo Tibetan Border Police (itbp)
GAUTAM BUDDHA NAGAR, UTTAR PRADESH
Ex-servicemen Contributory Health Scheme (echs)
BAREILLY, UTTAR PRADESH
Indian Army
INDORE, MADHYA PRADESH
Assam Science Technology And Environment Council
KAMRUP, ASSAM
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Material Specifications | Body Material | Aluminium |
| Technical Specification and Properties | Breaking Strength | 25.0 |
| Technical Specification and Properties | Provision of bend ear available | No |
| Dimensions | Length | 92.0 |
| Dimensions | Ring Diameter ( Smaller ) | 24.0 |
| Dimensions | Ring Diameter ( Bigger ) | 49.0 |
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT mandate certified by bank
OEM authorization certificate (if bidding via distributor)
Prior government supply contracts / experience certificates (3 years of similar products)
Undertaking confirming no liquidation or court proceedings
Any relevant technical compliance certificates or product datasheets
Extended Deadline
27-Feb-2026, 8:00 pm
Opening Date
27-Feb-2026, 8:30 pm
Key insights about JAMMU AND KASHMIR tender market
Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, and OEM authorization if bidding through distributors. Provide 3 years of government supply experience with contracts supporting yearly quantities, and ensure the product shelf life stays at least 5 years at delivery. Delivery to Siachen Battle School is mandatory.
Required documents include PAN, GST certificate, cancelled cheque, EFT mandate, OEM authorization, and contract copies showing 3 years of govt supply. Also include experience certificates, financial statements, and any product datasheets proving non-obsolescence and shelf life of 5 years.
Specs cover body material, breaking strength, bend ear provision, and ring diameters (smaller and bigger) plus length. Exact numerical values are not disclosed in the summary; bidders should reference the BOQ/technical datasheets for precise measurements and ISO/OEM certifications as applicable.
Supplied products must have a minimum usable shelf life of 5 years at supply time, with at least 5 years remaining usable life as of delivery. This ensures long-term usability for high-altitude operational use.
Delivery and potential installation/commissioning occur at Siachen Battle School, Siachen Glacier Base Camp, Ladakh, Leh 194101. The delivery period extends from the last date of the original delivery order, with possible extensions based on the option clause.
Bidder must have manufactured and supplied similar category products to Central/State Govt/PSU for at least 3 years prior to bid opening. If a bunch bid, the primary product must meet the criterion, with supporting contract copies from each year.
The purchaser may increase or decrease quantity up to 25% of bid quantity at contract placement and during currency. The extended delivery time uses a formula: (increased quantity / original quantity) × original delivery period, minimum 30 days.
When bidding via authorized distributors, an OEM authorization form/certificate with vendor details (name, designation, address, email, phone) must be furnished along with the bid to demonstrate direct OEM support.
Sign up now to access all documents
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS