Bid Publish Date
22-Jul-2026, 10:52 am
Bid End Date
11-Aug-2026, 11:00 am
Location
Progress
Quantity
193
GEM (Government e-Marketplace) procurement seeks a supplier for a suite of electrical protection and monitoring systems, including Lightning Protection System (ESE), High/Low Input Voltage Disconnector, Internal Lightning Protection Class B & C (3 Phase), Temperature Management System, Fire Alarm System, and Power Clamp Meter with integration/installation. The BOQ lists 14 items across installation, commissioning, and copper earthing work, with an overall emphasis on live monitoring and safety compliance. Delivery terms hinge on an option clause allowing up to 25% quantity variation, with the delivery period calculated from the last delivery order date. The contract structure also specifies staged payments tied to delivery and performance milestones. Location details are not specified in the data provided, but the procurement structure indicates a government-electrical safety and protection upgrade scope. The procurement emphasizes OEM-validated components and site readiness for installation.
Option clause allows up to 25% quantity variation at contract; delivery extension based on (increased quantity/original quantity) × original delivery days with minimum 30 days.
60% payment on delivery; 40% after installation, testing, and satisfactory performance.
OEM must provide valid EST certificate for LPS and ILPS; attach ILPS certificate in bid.
60% of contract value due on delivery per GeM order; remaining 40% after successful installation and acceptance testing.
Delivery period linked to last delivery order date; option clause allows up to 25% quantity variation during contract and currency, with extension rules.
Not explicitly specified in data; implied adherence to standard GeM terms for delays and performance.
Valid electrical license issued by state or central government
Site visit certificate signed by authorized in-charge
OEM authorizations for LPS and ILPS attached with bid
Tender Category
Goods
Bid To RA
No
ePBG Percentage
3%
ePBG Duration (Months)
12
Delivery Locations
1
Delivery Cities
South West delhi
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | South West delhi | South West delhi | - | - | 3 | - | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Lightning Protection System
Lightning Protection System
High Low Voltage Disconnector HIVD3 Phase 120 Amp
High Low Voltage Disconnector HIVD3 Phase 120 Amp
Internal Lightning protection class B-3 phase
Internal Lightning protection class B3 phase
Internal Lightning protection class C-3 phase
Internal Lightning protection class C-3 phase
Temperature management systems Heat Controlling device
Temperature management systems Heat Controlling device
Fire Alarm System
Fire Alarm System
Power Clamp Meter
Power Clamp Meter
Tool Box with Complete Accy
Tool Box with Complete Accy
30 X COPPER STRIP 32 x 3MM PER MTR
30 X COPPER STRIP 32 x 3MM PER MTR
DC Power cable 10mm x 10mm
DC Power cable 10mm x 10mm
03 x Copper Electrode 17mm wit Accessories
03 x Copper Electrode 17mm wit Accessories
25Kg Chemical bag for Earthing
25Kg Chemical bag for Earthing
10mm green colour Earthing cable
10mm green colour Earthing cable
INSTALLATIONAND COMMISION
INSTALLATIONAND COMMISION
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Lightning Protection System | Lightning Protection System | 3 | nos | 2ic_delhiareasigcoy | 15 | |
| 2 | High Low Voltage Disconnector HIVD3 Phase 120 Amp | High Low Voltage Disconnector HIVD3 Phase 120 Amp | 3 | nos | 2ic_delhiareasigcoy | 15 | |
| 3 | Internal Lightning protection class B-3 phase | Internal Lightning protection class B3 phase | 3 | nos | 2ic_delhiareasigcoy | 15 | |
| 4 | Internal Lightning protection class C-3 phase | Internal Lightning protection class C-3 phase | 3 | nos | 2ic_delhiareasigcoy | 15 | |
| 5 | Temperature management systems Heat Controlling device | Temperature management systems Heat Controlling device | 3 | nos | 2ic_delhiareasigcoy | 15 | |
| 6 | Fire Alarm System | Fire Alarm System | 3 | nos | 2ic_delhiareasigcoy | 15 | |
| 7 | Power Clamp Meter | Power Clamp Meter | 1 | nos | 2ic_delhiareasigcoy | 15 | |
| 8 | Tool Box with Complete Accy | Tool Box with Complete Accy | 1 | nos | 2ic_delhiareasigcoy | 15 | |
| 9 | 30 X COPPER STRIP 32 x 3MM PER MTR | 30 X COPPER STRIP 32 x 3MM PER MTR | 3 | nos | 2ic_delhiareasigcoy | 15 | |
| 10 | DC Power cable 10mm x 10mm | DC Power cable 10mm x 10mm | 20 | nos | 2ic_delhiareasigcoy | 15 | |
| 11 | 03 x Copper Electrode 17mm wit Accessories | 03 x Copper Electrode 17mm wit Accessories | 40 | nos | 2ic_delhiareasigcoy | 15 | |
| 12 | 25Kg Chemical bag for Earthing | 25Kg Chemical bag for Earthing | 62 | nos | 2ic_delhiareasigcoy | 15 | |
| 13 | 10mm green colour Earthing cable | 10mm green colour Earthing cable | 5 | nos | 2ic_delhiareasigcoy | 15 | |
| 14 | INSTALLATIONAND COMMISION | INSTALLATIONAND COMMISION | 43 | location | 2ic_delhiareasigcoy | 30 |
Discover companies most likely to bid on this tender
GST certificate
PAN card
Experience certificates
Financial statements
EMD documents or Bid Security Declaration (if exempt from EMD)
Technical bid documents
OEM authorizations for LPS/ILPS
Site visit certificate signed by responsible official
Electrician license issued by state or central government
Key insights about DELHI tender market
Bidders must hold a valid state/central electrical license, attach OEM LPS/ILPS certificates, and submit a site-visit certificate signed by the in-charge. Also provide GST, PAN, experience proofs, financial statements, and Bid Security Declaration if EMD is waived. The bid requires installation, commissioning, and integration documentation.
Required documents include GST certificate, PAN, experience certificates for electrical projects, financial statements, OEM authorizations for LPS/ILPS, technical bid, site-visit certificate, and an electrical license. Exemption from EMD requires a Bid Security Declaration.
Technical scope covers Lightning Protection System (ESE), High/Low Input Voltage Disconnector, Internal LPS Class B and Class C (3 Phase), Temperature Management System, Fire Alarm System, and Power Clamp Meter, with copper earthing strips totaling 40 units to be installed and integrated.
Payment terms specify 60% on delivery of complete stores per GeM order, with the remaining 40% after installation, testing, and satisfactory performance documented by the site in-charge.
The option clause permits up to 25% quantity variation at contract and during currency, with delivery time calculated as (increased quantity ÷ original quantity) × original delivery period, minimum 30 days.
Eligible bidders must hold a valid electrical license, provide OEM certificates for LPS/ILPS, submit a signed site-visit certificate, and include GST, PAN, experience and financial documents, with EMD considerations via Bid Security Declaration if exempt.
Scope includes installation, commissioning, integration with 40 copper earthing strips, and required site verification; bidder must attest completion and performance via acceptance tests before final payment.
No, the ATC explicitly states that the Repeat Order and Option Clause are not applicable to this procurement.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS