TenderDekho Logo
Active GEM

Odisha Power Generation Corporation Limited Pulley Taper Lock SPB Procurement Odisha 2026 ISO Standards

Bid Publish Date

31-Jul-2026, 10:02 am

Bid End Date

17-Aug-2026, 3:00 pm

Progress

Issue31-Jul-2026, 10:02 am
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

29

Category

145100200003 - PULLEY TAPER LOCK SPB 3 GROV PCD 1000 MM

Bid Type

Two Packet Bid

Categories 1

Tender Overview

Odisha Power Generation Corporation Limited (OPGCL) seeks procurement of PULLEY TAPER LOCK SPB variants with GROV PCD specifications, covering sizes 236 mm, 180 mm, 170 mm, 250 mm, 355 mm, and 1000 mm, for potential multiple orders. The tender comprises 8 BOQ items across the listed spindle/groove configurations, with no explicit quantity or value published in the summary. The purchaser retains a right to adjust quantities within a ±25% range and to extend delivery in line with option clauses, at contracted rates. The procurement supports standard engine-driven drive systems at Energy Department Odisha. A Buyer ATC document is uploaded and referenced in the terms. The bid thus targets suppliers capable of supplying precise taper lock pulleys and related accessories to fit diverse SPB grooved configurations. Unique aspects include multiple GROV PCDs and 3- or 2-groove variants within a single procurement window, with emphasis on compliance to option-based delivery adjustments and contract execution terms.

Technical Specifications & Requirements

  • Organization: Odisha Power Generation Corporation Limited (OPGCL) for Pulley Taper Lock SPB variants
  • Product scope: Taper lock pulleys SPB 3 GROV PCD 236 mm, 180 mm, 170 mm, 250 mm, 355 mm, 1000 mm; SPB 2 GROV PCD 200 mm and 150 mm
  • BOQ details: 8 items, exact quantities not disclosed in summary; item entries listed as N/A
  • Delivery terms: Option to increase/decrease quantity up to 25%; delivery period calculated per clause; minimum extension rules apply
  • ATC/documentation: An ATC document is uploaded and governs bidder compliance and conditions
  • Standards/quality: No explicit standards published in data; bidders should reference the ATC for compliance requirements
  • Location/context: Procurement aligned with Odisha energy infrastructure requirements; hardware for drive systems and pulleys
  • Bid security/EMD: Not specified in the provided data; bidders should verify in ATC
  • Contract scope: Scope includes potential extended delivery during currency of contract

Terms, Conditions & Eligibility

  • Option Clause: Buyer may modify quantity by up to 25% at contract rates and extend delivery as per formula (minimum 30 days)
  • Delivery & timeframe: Delivery period starts from last date of original delivery order; extended period follows the option clause mechanics
  • ATC reference: Mandatory adherence to Buyer Uploaded ATC document
  • BOQ specifics: 8 items with varied pulley configurations; exact quantities not disclosed in summary
  • Payment/EMD: Not specified in provided terms; verify in official ATC and tender documents
  • Eligibility criteria: Suppliers must comply with option-based delivery terms and ATC requirements
  • Penalties/LD: Not detailed in the summary; refer to full terms for any performance penalties
  • Geographic scope: Odisha State energy procurement context; local applicability noted

Key Specifications

    • Pulley type: PULLEY TAPER LOCK SPB 3 GROV PCD with sizes 236 MM, 180 MM, 170 MM, 250 MM, 355 MM, 1000 MM
    • Additional: PULLEY TAPER LOCK SPB 2 GROV PCD 200 MM, 150 MM
    • BOQ items: total 8 items; exact quantities not disclosed
    • Delivery terms: quantity adjustments up to 25%; delivery period extensions per option clause
    • Compliance: adherence to ATC document uploaded by Buyer

Terms & Conditions

  • Option-based quantity flexibility up to 25% at contracted rates

  • Delivery period adjustments governed by original/extended delivery rules

  • ATC document governs technical and contractual compliance for bidders

Important Clauses

Payment Terms

Not specified in data; bidders must consult ATC for payment schedule and milestones

Delivery Schedule

Delivery period commences from last date of original delivery order; extended periods via option clause with minimum 30 days

Penalties/Liquidated Damages

Not detailed in provided information; refer to ATC for LD terms and penalties

Bidder Eligibility

  • Capability to supply taper lock pulleys SPB with GROV configurations

  • Compliance with option clause delivery terms (±25%)

  • Adherence to ATC requirements and OEM authorizations if applicable

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

145100200003 - PULLEY TAPER LOCK SPB 3 GROV PCD 1000 MM , 145100200004 - PULLEY TAPER LOCK SPB 3 GROV PCD 355 MM , 145100700088 - PULLEY TAPER LOCK SPB 3 GROV PCD 236 MM , 145100700089 - PULLEY TAPER LOCK SPB 3 GROV PCD 180 MM , 145100700090 - PULLEY TAPER LOCK SPB 3 GROV PCD 250 MM , 145100700091 - PULLEY TAPER LOCK SPB 3 GROV PCD 170 MM , 145100700092 - PULLEY TAPER LOCK SPB 2 GROV PCD 200 MM , 145100700093 - PULLEY TAPER LOCK SPB 2 GROV PCD 150 MM

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Jharsuguda

Delivery Pincodes

768234

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Ashis Mohapatra768234,BANHARPALIJharsugudaOdisha768234530-

Authority Records

ENERGY DEPARTMENTODISHA POWER GENERATION CORPORATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9669777.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 8 Items Sign in for GEM prices

#10

145100200003 - PULLEY TAPER LOCK SPB 3 GROV PCD 1000 MM

REFER BOQ CUM ITEM TECHNICAL SPECIFICATION SHEET

5 no Delivery: 30 days
#20

145100200004 - PULLEY TAPER LOCK SPB 3 GROV PCD 355 MM

REFER BOQ CUM ITEM TECHNICAL SPECIFICATION SHEET

10 no Delivery: 30 days
#30

145100700088 - PULLEY TAPER LOCK SPB 3 GROV PCD 236 MM

REFER BOQ CUM ITEM TECHNICAL SPECIFICATION SHEET

2 no Delivery: 30 days
#40

145100700089 - PULLEY TAPER LOCK SPB 3 GROV PCD 180 MM

REFER BOQ CUM ITEM TECHNICAL SPECIFICATION SHEET

3 no Delivery: 30 days
#50

145100700090 - PULLEY TAPER LOCK SPB 3 GROV PCD 250 MM

REFER BOQ CUM ITEM TECHNICAL SPECIFICATION SHEET

2 no Delivery: 30 days
#60

145100700091 - PULLEY TAPER LOCK SPB 3 GROV PCD 170 MM

REFER BOQ CUM ITEM TECHNICAL SPECIFICATION SHEET

3 no Delivery: 30 days
#70

145100700092 - PULLEY TAPER LOCK SPB 2 GROV PCD 200 MM

REFER BOQ CUM ITEM TECHNICAL SPECIFICATION SHEET

2 no Delivery: 30 days
#80

145100700093 - PULLEY TAPER LOCK SPB 2 GROV PCD 150 MM

REFER BOQ CUM ITEM TECHNICAL SPECIFICATION SHEET

2 no Delivery: 30 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar pulley/taper lock procurement

4

Financial statements (last 3 years)

5

EMD/Security deposit documentation as per ATC

6

Technical bid documents demonstrating compliance with ATC

7

OEM authorization if bidding as an authorized dealer

8

Any other documents specified in the ATC

Frequently Asked Questions

Key insights about ODISHA tender market

How to bid for pulleys SPB GROV tender in Odisha 2026?

Bidders must review the ATC, submit GST, PAN, experience certificates, financials, and EMD as specified in the ATC. Ensure compliance with 25% quantity option and deliver within the calculated extended period rules. Confirm OEM authorizations if bidding as dealer and provide technical bid demonstrating SPB 3 GROV capabilities.

What documents are required for SPB pulley procurement in Odisha?

Required documents include GST registration, PAN, last 3 years financial statements, experience certificates for pulley supply, EMD/Security deposit per ATC, technical bid documents, OEM authorization if applicable, and any other documents listed in the ATC. Ensure conformity with the 8 BOQ items and groove configurations.

What are the pulley sizes in the Odisha SPB tender 2026?

Tender covers GROV SPB sizes: 236 mm, 180 mm, 170 mm, 250 mm, 355 mm, 1000 mm for SPB 3 GROV, plus SPB 2 GROV in 200 mm and 150 mm. Exact quantities per item are not disclosed; bid must align to listed configurations and ATC terms.

What delivery terms apply to the Odisha SPB pulley tender?

Delivery terms include an option to modify quantity by up to 25% at contract rates, with delivery period adjustments based on last date of original order. If extended, additional time uses the (increased quantity/ original quantity) × original delivery period formula, minimum 30 days.

Which organization is issuing the SPB pulley procurement in Odisha?

The procurement is issued by Odisha Power Generation Corporation Limited (OPGCL) under the Energy Department, Odisha, for pulley taper lock SPB configurations across GROV and groove variants as specified in the ATC.

Are there any mandatory OEM authorizations for this pulley tender?

If bidding as an authorized dealer, provide OEM authorization to demonstrate supply rights for taper lock SPB pulleys. Confirm compliance with ATC requirements and product specifications for GROV configurations and PCD measurements.

What standards or quality requirements are specified for SPB pulleys?

The provided data does not list explicit standards; bidders must consult the ATC document for any standards, tests, or certifications required for SPB 3 GROV and SPB 2 GROV pulleys, and ensure ISI/ISO conformity if specified therein.

When is the supplier delivery period for the Odisha pulleys tender?

Delivery timing is based on the original delivery order with possible extensions under the option clause. Minimum extension is calculated to ensure a minimum 30 days added time; parties must follow the ATC for precise milestone dates.