TenderDekho Logo
Closed GEM

Government Tender Published for BBO Non Linear Crystal,PPKTP Non Linear Crystal,TEC PELTIER OVEN,Quarter Wave Plate,Half Wave Plate in BANGALORE, KARNATAKA

Bid Publish Date

01-Aug-2026, 11:44 am

Bid End Date

25-Aug-2026, 11:00 am

Progress

Issue01-Aug-2026, 11:44 am
AwardPending

Centre For Development Of Advanced Computing (c-dac) invites bids for BBO Non Linear Crystal, PPKTP Non Linear Crystal, TEC PELTIER OVEN, Quarter Wave Plate, Half Wave Plate, half inch Optic Rotation Mount -FiberBenches, Glan Thompson Polarizers with Lens Tube Mount, Tranlation Stage, Polarizing Beam Splitter, Rotation Mount for Optics, Beam Splitter, Mirror, Optical Lens, Platform Cube Mounts, Single-Axis Flexure Translation Stages, Piezo Controller and Strain Gauge Reader and Power supply, Multimode Fiber, Fiber Mating Sleeves, Kinematic Mirror Mount, Collimators, Adapters, Adjustable Collimators, SM1-Threaded Adapters, Kinematic Prism Mounts with Clamping Arms, Iris, Universal Post Holder, Optical Post in BANGALORE, KARNATAKA. Quantity: 204. Submission Deadline: 25-08-2026 11: 00: 00. Submit your proposal before the deadline.

Tender Data

Bid Details

Quantity

204

Category

BBO Non Linear Crystal

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Group wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

BBO Non Linear Crystal , PPKTP Non Linear Crystal , TEC PELTIER OVEN , Quarter Wave Plate , Half Wave Plate , half inch Optic Rotation Mount -FiberBenches , Glan Thompson Polarizers with Lens Tube Mount , Tranlation Stage , Polarizing Beam Splitter , Rotation Mount for Optics , Beam Splitter , Mirror , Optical Lens , Platform Cube Mounts , Single-Axis Flexure Translation Stages , Piezo Controller and Strain Gauge Reader and Power supply , Multimode Fiber , Fiber Mating Sleeves , Kinematic Mirror Mount , Collimators , Adapters , Adjustable Collimators , SM1-Threaded Adapters , Kinematic Prism Mounts with Clamping Arms , Iris , Universal Post Holder , Optical Post

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

5

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Bengaluru Urban

Delivery Pincodes

560038

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Shashidhar N Kunthe N560038,CDAC Knowledge Park #1, Old Madras Road BaippanahalliBengaluru UrbanKarnataka560038190-

Authority Records

MINISTRY OF ELECTRONICS AND INFORMATION TECHNOLOGYELECTRONICS AND INFORMATION TECHNOLOGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9673160.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 42 Items Sign in for GEM prices

#1

BBO Non Linear Crystal

Paired BBO Type I SPDC 405 nm 3 degree mounted

1 pieces Delivery: 90 days
#2

PPKTP Non Linear Crystal

ppKTP Type 0 SPDC 405 nm to 810 nm degenerate 10 mm

1 pieces Delivery: 90 days
#3

TEC PELTIER OVEN

TEC controller 20 to 60C Variance of 0.2C PID Pt1000 sensor

1 pieces Delivery: 90 days
#4

Quarter Wave Plate

Achromatic quarter wave plate 1/2 inch 700-1200 nm FiberBench Lambda/4

2 pieces Delivery: 90 days
#5

Half Wave Plate

Achromatic half wave plate 1/2 inch 700-1200 nm FiberBench Lamda/2

6 pieces Delivery: 90 days
#6

half inch Optic Rotation Mount -FiberBenches

Optics rotation mount 1/2 inch SM05 360 degree 2 degree graduations

9 pieces Delivery: 90 days
#7

Glan Thompson Polarizers with Lens Tube Mount

Mounted Glan Thompson polarizer calcite 5 mm 350-700 nm 100000 ratio

3 pieces Delivery: 90 days
#8

Tranlation Stage

Crossed roller linear stage 13 mm aluminium 30 40 mm compatible

4 pieces Delivery: 90 days
#9

Polarizing Beam Splitter

Polarizing beamsplitter cube 5 mm 700 to 1300 nm 1000 ratio

6 pieces Delivery: 90 days
#10

Half Wave Plate

Zero order half wave plate 1/2 inch 405 nm SM05 quartz

2 pieces Delivery: 90 days
#11

Quarter Wave Plate

Zero order quarter wave plate 1/2 inch 808 nm mounted quartz

6 pieces Delivery: 90 days
#12

Half Wave Plate

Zero order half wave plate 1/2 inch 808 nm mounted quartz

6 pieces Delivery: 90 days
#13

Rotation Mount for Optics

Optics rotation mount 1/2 inch

14 pieces Delivery: 90 days
#14

Polarizing Beam Splitter

Polarizing beamsplitter cube 1/2 inch 620 to 1000 nm N-SF1

4 pieces Delivery: 90 days
#15

Beam Splitter

Non polarizing 50 by 50 beamsplitter 1/2 inch 700 to 1100 nm

6 pieces Delivery: 90 days
#16

Beam Splitter

Non polarizing 50 by 50 beamsplitter cube 5 mm 700 to 1100 nm N-BK7

4 pieces Delivery: 90 days
#17

Mirror

Protected silver mirror 1 inch 450 nm to 20 um 97 percent SiO2

12 pieces Delivery: 90 days
#18

Optical Lens

Plano convex lens 1 inch 100 mm 650-1050 nm N-BK7

3 pieces Delivery: 90 days
#19

Optical Lens

Plano convex lens 1 inch 50 mm 350-700 nm N-BK7

2 pieces Delivery: 90 days
#20

Optical Lens

Plano convex lens 1 inch 120 mm 350-700 nm N-BK7

2 pieces Delivery: 90 days
#21

Platform Cube Mounts

Platform mount 1/2 inch optics M4

10 pieces Delivery: 90 days
#22

Single-Axis Flexure Translation Stages

Piezo translation stage 5 mm 300 um 20 um travel 0.6 nm resolution

1 pieces Delivery: 90 days
#23

Piezo Controller and Strain Gauge Reader and Power supply

K Cube piezo controller strain gauge 75 V 150 V closed loop

1 pieces Delivery: 90 days
#24

Multimode Fiber

Multimode FC/PC fiber 200 um NA 0.22 High OH 2 m

8 pieces Delivery: 90 days
#25

Multimode Fiber

Multimode FC/PC fiber 200 um NA 0.22 High OH 2 m

8 pieces Delivery: 90 days
#26

Fiber Mating Sleeves

FC/APC mating sleeve narrow key slot 0.5 dB

6 pieces Delivery: 90 days
#27

Kinematic Mirror Mount

Kinematic mirror mount 1 inch optics post centered 8-32 M4 threads

12 pieces Delivery: 90 days
#28

Collimators

UV collimator 350 to 500 nm 405 nm NA 0.60 EFL 11 mm BBAR

4 pieces Delivery: 90 days
#29

Adapters

Adapter 1 inch 11 mm compatible

6 pieces Delivery: 90 days
#30

Collimators

FC APC fiber collimator 11 mm 780 nm 405 nm NA 0.60

4 pieces Delivery: 90 days
#31

Adapters

Adapter 1/2 inch unthreaded smooth bore

6 pieces Delivery: 90 days
#32

Adjustable Collimators

Adjustable aspheric FC/APC collimator 7.5 mm 350 to 700 nm

2 pieces Delivery: 90 days
#33

SM1-Threaded Adapters

SM1 threaded adapter 15 mm 0.18 inch smooth bore

2 pieces Delivery: 90 days
#34

Kinematic Prism Mounts with Clamping Arms

Ring actuated iris diaphragm SM1 12 mm aperture

5 pieces Delivery: 90 days
#35

Iris

Ring actuated iris diaphragm SM1 12 mm aperture

6 pieces Delivery: 90 days
#36

Iris

Swiveling magnetic base post holder 1/2 inch 20 mm pack 5

2 pieces Delivery: 90 days
#37

Universal Post Holder

Swiveling magnetic base post holder 1/2 inch 30 mm pack 5

5 pieces Delivery: 90 days
#38

Universal Post Holder

Swiveling magnetic base post holder 1/2 inch 40 mm pack 5

5 pieces Delivery: 90 days
#39

Universal Post Holder

Optical post 12.7 mm stainless steel M6 base 30 mm pack 5

2 pieces Delivery: 90 days
#40

Optical Post

Optical post 12.7 mm stainless steel M6 base 20 mm pack 5

5 pieces Delivery: 90 days
#41

Optical Post

Optical post 12.7 mm stainless steel M6 base 50 mm pack 5

5 pieces Delivery: 90 days
#42

Optical Post

Kinematic prism mount M4 80 TPI variance 4 degree tip tilt

5 pieces Delivery: 90 days

Categories 35

Required Documents

1

Experience Criteria

2

Certificate (Requested in ATC)

3

OEM Annual Turnover

4

Additional Doc 1 (Requested in ATC)

5

Additional Doc 2 (Requested in ATC)

6

Additional Doc 3 (Requested in ATC)

7

Additional Doc 4 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer