Bid Publish Date
31-Oct-2025, 11:40 am
Bid End Date
15-Nov-2025, 12:00 pm
EMD
₹75,000
Value
₹24,93,000
Location
Progress
Quantity
4078
Category
Designing and Construction of double Howe Adjoining Flat Truss-
Bid Type
Two Packet Bid
Indian Army announces a tender for Designing and Construction of double Howe Adjoining Flat Truss-, Construction and Installation of Mild Steel Column, Installation of Structure Purling, Fixing and Installation of Cross Member, Covering Fixing Installation of Entire Structure with 0. 63 Millimeter Galvanized Metal Sheet, Construction and Installation of Water Drainage Plan, Painting Entire Structure with 02 Coats of Red Oxide 02 Coats of Enamel Paint Colour Chosen by User, Construction of Reinforced Cement Concrete Flooring, 12 millimetre wooden tiles approved by user 800 sqft, Designing and Installation of Glass Doors and Windows, Installation of toughen glass door used in heavy duty aluminum frame having size of 4 x 8 feet, Auto soft close machine system for all doors stainless steel handles will be placed, Construction of Reinforced Cement Concrete Brick Wall for Entire Sports Complex, Installation of Qty 16 x 200 Watt non-masked led lights, Specifications of Synthetic Floor Mats for Badminton Courts are as Under, Quantity of net poles posts 04 Badminton World Federation Specification 02 x Badminton Nets Make Yonex in POONCH, JAMMU & KASHMIR. Quantity: 4078. Submission Deadline: 15-11-2025 12: 00: 00. Last date to apply is approaching fast!
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Designing and Construction of double Howe Adjoining Flat Truss- , Construction and Installation of Mild Steel Column , Installation of Structure Purling , Fixing and Installation of Cross Member , Covering Fixing Installation of Entire Structure with 0.63 Millimeter Galvanized Metal Sheet , Construction and Installation of Water Drainage Plan , Painting Entire Structure with 02 Coats of Red Oxide 02 Coats of Enamel Paint Colour Chosen by User , Construction of Reinforced Cement Concrete Flooring , 12 millimetre wooden tiles approved by user 800 sqft , Designing and Installation of Glass Doors and Windows , Installation of toughen glass door used in heavy duty aluminum frame having size of 4 x 8 feet , Auto soft close machine system for all doors stainless steel handles will be placed , Construction of Reinforced Cement Concrete Brick Wall for Entire Sports Complex , Installation of Qty 16 x 200 Watt non-masked led lights , Specifications of Synthetic Floor Mats for Badminton Courts are as Under , Quantity of net poles posts 04 Badminton World Federation Specification 02 x Badminton Nets Make Yonex
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Designing and Construction of double Howe Adjoining Flat Truss-
Designing and Construction of double Howe Adjoining Flat Truss-
Construction and Installation of Mild Steel Column
Construction and Installation of Mild Steel Column
Installation of Structure Purling
Installation of Structure Purling
Fixing and Installation of Cross Member
Fixing and Installation of Cross Member
Covering Fixing Installation of Entire Structure with 0.63 Millimeter Galvanized Metal Sheet
Covering Fixing Installation of Entire Structure with 0.63 Millimeter Galvanized Metal Sheet
Construction and Installation of Water Drainage Plan
Construction and Installation of Water Drainage Plan
Painting Entire Structure with 02 Coats of Red Oxide 02 Coats of Enamel Paint Colour Chosen by User
Painting Entire Structure with 02 Coats of Red Oxide 02 Coats of Enamel Paint Colour Chosen by User
Construction of Reinforced Cement Concrete Flooring
Construction of Reinforced Cement Concrete Flooring
12 millimetre wooden tiles approved by user 800 sqft
12 millimetre wooden tiles approved by user 800 sqft
Designing and Installation of Glass Doors and Windows
Designing and Installation of Glass Doors and Windows
Installation of toughen glass door used in heavy duty aluminum frame having size of 4 x 8 feet
Installation of toughen glass door used in heavy duty aluminum frame having size of 4 x 8 feet
Auto soft close machine system for all doors stainless steel handles will be placed
Auto soft close machine system for all doors stainless steel handles will be placed
Construction of Reinforced Cement Concrete Brick Wall for Entire Sports Complex
Construction of Reinforced Cement Concrete Brick Wall for Entire Sports Complex
Installation of Qty 16 x 200 Watt non-masked led lights
Installation of Qty 16 x 200 Watt non-masked led lights
Specifications of Synthetic Floor Mats for Badminton Courts are as Under
Specifications of Synthetic Floor Mats for Badminton Courts are as Under
Quantity of net poles posts 04 Badminton World Federation Specification 02 x Badminton Nets Make Yonex
Quantity of net poles posts 04 Badminton World Federation Specification 02 x Badminton Nets Make Yonex
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Designing and Construction of double Howe Adjoining Flat Truss- | Designing and Construction of double Howe Adjoining Flat Truss- | 8 | nos | adjut_16rr | 120 | |
| 2 | Construction and Installation of Mild Steel Column | Construction and Installation of Mild Steel Column | 20 | nos | adjut_16rr | 120 | |
| 3 | Installation of Structure Purling | Installation of Structure Purling | 18 | nos | adjut_16rr | 120 | |
| 4 | Fixing and Installation of Cross Member | Fixing and Installation of Cross Member | 783 | rft | adjut_16rr | 120 | |
| 5 | Covering Fixing Installation of Entire Structure with 0.63 Millimeter Galvanized Metal Sheet | Covering Fixing Installation of Entire Structure with 0.63 Millimeter Galvanized Metal Sheet | 87 | nos | adjut_16rr | 120 | |
| 6 | Construction and Installation of Water Drainage Plan | Construction and Installation of Water Drainage Plan | 148 | rft | adjut_16rr | 120 | |
| 7 | Painting Entire Structure with 02 Coats of Red Oxide 02 Coats of Enamel Paint Colour Chosen by User | Painting Entire Structure with 02 Coats of Red Oxide 02 Coats of Enamel Paint Colour Chosen by User | 80 | ltr | adjut_16rr | 120 | |
| 8 | Construction of Reinforced Cement Concrete Flooring | Construction of Reinforced Cement Concrete Flooring | 2,100 | sqft | adjut_16rr | 120 | |
| 9 | 12 millimetre wooden tiles approved by user 800 sqft | 12 millimetre wooden tiles approved by user 800 sqft | 800 | sqft | adjut_16rr | 120 | |
| 10 | Designing and Installation of Glass Doors and Windows | Designing and Installation of Glass Doors and Windows | 8 | nos | adjut_16rr | 120 | |
| 11 | Installation of toughen glass door used in heavy duty aluminum frame having size of 4 x 8 feet | Installation of toughen glass door used in heavy duty aluminum frame having size of 4 x 8 feet | 2 | nos | adjut_16rr | 120 | |
| 12 | Auto soft close machine system for all doors stainless steel handles will be placed | Auto soft close machine system for all doors stainless steel handles will be placed | 1 | nos | adjut_16rr | 120 | |
| 13 | Construction of Reinforced Cement Concrete Brick Wall for Entire Sports Complex | Construction of Reinforced Cement Concrete Brick Wall for Entire Sports Complex | 1 | nos | adjut_16rr | 120 | |
| 14 | Installation of Qty 16 x 200 Watt non-masked led lights | Installation of Qty 16 x 200 Watt non-masked led lights | 16 | nos | adjut_16rr | 120 | |
| 15 | Specifications of Synthetic Floor Mats for Badminton Courts are as Under | Specifications of Synthetic Floor Mats for Badminton Courts are as Under | 4 | nos | adjut_16rr | 120 | |
| 16 | Quantity of net poles posts 04 Badminton World Federation Specification 02 x Badminton Nets Make Yonex | Quantity of net poles posts 04 Badminton World Federation Specification 02 x Badminton Nets Make Yonex | 2 | nos | adjut_16rr | 120 |
Discover companies most likely to bid on this tender
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS