Bid Publish Date
02-Sep-2026, 7:05 pm
Bid End Date
17-Sep-2026, 8:00 pm
EMD
₹85,000
Location
Progress
Nagar Palika, under the Urban Development Directorate Of Uttarakhand, invites bids for supply and installation-related items including 25Sqmm 3 core aluminum unarmoured bunched cable, LED luminaires for roads, and tubular street light poles conforming to IS 10322 (Part 5/Section 3) (V3) under the BIS Scheme II. Estimated value is not disclosed; EMD: ₹85,000. The contract scope covers supply, installation, testing, and commissioning, with the possibility to adjust quantity up to 25% during and after contract award. A functional service centre in the respective state is mandatory, with a 30-day deadline to establish if not pre-existing. The ATC requires ISO 9001 certified suppliers, and terms include escalation matrices for service support, and a delivery schedule tied to original delivery periods.
25Sqmm 3 core aluminum unarmoured cable
LED luminaire for road lighting conforming to IS 10322 (Part 5/Section 3) (V3)
Tubular street light poles with coating and IS 2713/80 Part-2 designation
Street light clamps, cartage, excavation, laying of stringing and sagging
BIS Scheme II compliance for listed items
ISO 9001 certification for bidder or OEM
EMD ₹85,000 and option to vary quantity by up to 25%
Delivery period linked to last delivery date; possible extension with formula
Mandatory ISO 9001 and IS/ BIS standards; service centres required
Service escalation matrix and on-site/carry-in warranty terms
Comprehensive scope: supply, installation, testing, commissioning
Payment release subject to documentary evidence of a functional service centre and adherence to ISO 9001; standard terms per ATC.
Delivery period begins after award; option-driven quantity adjustments may extend delivery with minimum 30 days.
Not explicitly stated; apply standard procurement LDs if delivery or performance obligations breach terms.
ISO 9001 certified bidder or OEM
Functional service centre in each consignee state or commitment to establish within 30 days
Experience in supply/installation of lighting infrastructure and BIS IS 10322 compliance
Quantity
3187
Category
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2)
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
14
OEM Avg. Turnover
50
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Supply of 25Sqmm 3 core aluminum unarmoured bunched cable. , Timer For Street Light Control , Street light Clamp , Cartage , excavation , erection , grouting , muffing , Laying of stringing and Sagging of Cable , LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) , Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3)
Advisory Bank
State Bank of India
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Tehri Garhwal
Delivery Pincodes
249175
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Alam Singh Rawat | 249175,Nagar Palika Parisad near Town hall Narendra Nagar Tehri Garhwal | Tehri Garhwal | Uttarakhand | 249175 | 1500 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
CATALOG Specification
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Supply of 25Sqmm 3 core aluminum unarmoured bunched cable.
as per attachment
Timer For Street Light Control
as per attachment
Street light Clamp
as per attachment
Cartage
as per attachment
excavation
as per attachment
erection
as per attachment
grouting
as per attachment
muffing
as per attachment
Laying of stringing and Sagging of Cable
as per attachment
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Supply of 25Sqmm 3 core aluminum unarmoured bunched cable. | as per attachment | 1,500 | mtr | nppnnagar1 | 45 | |
| 2 | Timer For Street Light Control | as per attachment | 2 | pcs | nppnnagar1 | 45 | |
| 3 | Street light Clamp | as per attachment | 60 | pcs | nppnnagar1 | 45 | |
| 5 | Cartage | as per attachment | 1 | job | nppnnagar1 | 45 | |
| 6 | excavation | as per attachment | 1 | job | nppnnagar1 | 45 | |
| 7 | erection | as per attachment | 1 | job | nppnnagar1 | 45 | |
| 8 | grouting | as per attachment | 1 | job | nppnnagar1 | 45 | |
| 9 | muffing | as per attachment | 1 | job | nppnnagar1 | 45 | |
| 10 | Laying of stringing and Sagging of Cable | as per attachment | 1,500 | mtr | nppnnagar1 | 45 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar supply/installation
Financial statements (last 3 years)
EMD payment proof (DD/online transfer)
Technical bid documents and product compliance certificates
OEM authorizations or dealership/installation certifications
ISO 9001 certificate (supplier or OEM)
Service centre establishment proof or plan within 30 days
| Category | Specification | Requirement |
|---|---|---|
| Generic | Coating on the tubular steel poles | Bitumen coated as per clause 13.1 of IS:2713 part 1/1980 |
| Generic | Length of Tubular steel poles (Metre) | 9 |
| Generic | Designation of Tubular steel poles as per table 2 of IS 2713/80 Part-2 with amdt No 1 | 410SP-33 |
Key insights about UTTARAKHAND tender market
Bidders must meet eligibility criteria including ISO 9001 certification, experience in similar supply/installation projects, and GST/PAN documentation. Ensure EMD ₹85,000 payment, and submit OEM authorizations, service centre proof, and BIS/IS 10322 compliance certificates. The process requires uploading technical and financial bid documents by the quoted deadline.
Submit GST certificate, PAN card, 3-year financial statements, experience certificates for similar projects, EMD proof of ₹85,000, ISO 9001 certificate, OEM authorization, technical compliance, and service centre establishment proof or plan within 30 days of award.
LED luminaires must comply with IS 10322 (Part 5/Section 3) (V3) and BIS Scheme II; bidders or OEMs must hold ISO 9001 certification. Additional coating and pole design standards follow IS 2713/80 Part-2 amendment 1 for tubular poles.
The required EMD is ₹85,000. Payments can be made via demand draft or online transfer as proof attached with the bid; ensure it accompanies the technical bid submission to avoid disqualification.
The purchaser may adjust quantity by up to 25%. Delivery time scales as (additional quantity/original quantity) × original delivery period, with a minimum of 30 days; extended delivery aligns with the extended period and original terms.
Bidders must have a functional service centre in each consignee state; if not, establish one within 30 days of award. Payment is released only after documentary evidence of a functional service centre is provided.
Scope covers supply, installation, testing, and commissioning of 25Sqmm 3 core aluminum cables, LED luminaires, street light poles, clamps, and related accessories; includes cartage, excavation, stringing, sagging, and grouting per IS standards.
Poles must follow IS 2713/80 Part-2 with amendment 1 for designation and coating; ensure coating specifications and design meet BIS and IS standards as listed in tender terms.