Buckle 32 mm Hot dip Galvanized wire diameter 7 mm Rust free
Advanced Weapons And Equipment India Limited
KANPUR NAGAR, UTTAR PRADESH
Progress
Quantity
40000
Category
L-HOOK HOT DIP GALVANIZED DIA 8MM LG 8IN
Bid Type
Two Packet Bid
Public procurement opportunity for Bokaro Steel Plant L-HOOK HOT DIP GALVANIZED DIA 8MM LG 8IN, L-HOOK HOT DIP GALVANIZED DIA 8MM LG 6IN, L-HOOK HOT DIP GALVANIZED DIA 8MM LG 7IN, L-HOOK HOT DIP GALVANIZED DIA 8MM LG 9IN, L-HOOK HOT DIP GALVANIZED DIA 8MM LG10IN in BOKARO, JHARKHAND. Quantity: 40000 issued by. Submission Deadline: 14-01-2026 14: 00: 00. View full details and respond.
Advanced Weapons And Equipment India Limited
KANPUR NAGAR, UTTAR PRADESH
Bharat Heavy Electricals Limited (bhel)
Oil And Natural Gas Corporation Limited
Border Road Organisation
CACHAR, ASSAM
Indian Army
ALLAHABAD, UTTAR PRADESH
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | L-HOOK HOT DIP GALVANIZED DIA 8MM LG 8IN | L-HOOK HOT DIP GALVANIZED DIA 8MM LG 8IN AS PER ATTACHED SPECIFICATION DOCUMENT | 6,000 | kg | consginee@p61 | 180 |
| 2 | L-HOOK HOT DIP GALVANIZED DIA 8MM LG 6IN | L-HOOK HOT DIP GALVANIZED DIA 8MM LG 6IN AS PER ATTACHED SPECIFICATION DOCUMENT | 2,000 | kg | consginee@p61 | 180 |
| 3 | L-HOOK HOT DIP GALVANIZED DIA 8MM LG 7IN | L-HOOK HOT DIP GALVANIZED DIA 8MM LG 7IN AS PER ATTACHED SPECIFICATION DOCUMENT | 27,000 | kg | consginee@p61 | 180 |
| 4 | L-HOOK HOT DIP GALVANIZED DIA 8MM LG 9IN | L-HOOK HOT DIP GALVANIZED DIA 8MM LG 9IN AS PER ATTACHED SPECIFICATION DOCUMENT | 3,500 | kg | consginee@p61 | 180 |
| 5 | L-HOOK HOT DIP GALVANIZED DIA 8MM LG10IN | L-HOOK HOT DIP GALVANIZED DIA 8MM LG10IN AS PER ATTACHED SPECIFICATION DOCUMENT | 1,500 | kg | consginee@p61 | 180 |
Discover companies most likely to bid on this tender
Certificate (Requested in ATC)
OEM Authorization Certificate
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS