Bid Publish Date
16-Jul-2026, 9:59 am
Bid End Date
24-Jul-2026, 10:00 am
Value
₹4,46,043
Location
Progress
Quantity
2
Bid Type
Single Packet Bid
The Marketing Division of Indian Oil Corporation Limited invites bids for AMC/CMC services covering Fire Detection, Fire Alarm, Fire Hydrant and Sprinkler systems. The estimated contract value is ₹4,46,043. Location and exact delivery venue are not disclosed in the data. The procurement focuses on ongoing maintenance and correctional services for safety-critical fire protection equipment, with emphasis on compliant service delivery and timely response. The scope appears to be maintenance-centric rather than new installation, with emphasis on reliability and regulatory alignment. The absence of BOQ items suggests a framework/annual maintenance contract structure rather than a one-off supply. Bidders should verify ATC terms and ensure capability to manage integrated fire protection systems under IOC oversight.
EMD amount not disclosed; verify in ATC for exact value and submission method
Delivery/service cadence to be defined in ATC; confirm response times and onsite attendance
Documentation must include GST, PAN, experience, financials, and OEM authorizations per ATC
Terms to be clarified in ATC; bidders should anticipate IOC standard payment cycles post service delivery and acceptance
Maintenance services cadence to be defined; confirm on-site visit windows and emergency response times in ATC
Not specified in available data; review ATC for SLAs, penalties for non-compliance, and service credits
Experience in AMC/CMC of fire protection systems (fire detection, alarm, hydrant, sprinkler)
Ability to provide OEM authorizations or equivalent OEM-backed service capability
Financial capability evidenced by recent financial statements and tax registrations
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
AMC / CMC of Fire Detection, Fire Alarm, Fire Hydrant and Sprinkler System
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
12
Payment Timelines
Payments shall be made to the Seller within 10 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Delivery Locations
1
Delivery Cities
Guna
Delivery Pincodes
473111
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Akash Yadav | 473111,INDIAN OIL CORP. LTD., INDANE BOTTLING PLANT, VILL: DONGAR, RAGHOGARH, GUNA 473111 | Guna | Madhya Pradesh | 473111 | 2 | - | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST Registration Certificate
Permanent Account Number (PAN) Card
Company Registration/Incorporation Certificate
Experience Certificates for similar AMC/CMC of fire protection systems
Financial Statements (last 2-3 years)
EMD submission document (if required by ATC)
Technical Compliance Certificates or OEM Authorizations
Technical bid documents (as per ATC)
Any other documents specified in Buyer Added ATC
Bidders should review the ATC for scope, confirm eligibility in fire detection/alarm/hydrant/sprinkler AMC, assemble GST, PAN, experience, financials, OEM authorizations, and any required technical bid documents; ensure you meet maintenance and emergency response SLAs as per ATC.
Required documents include GST certificate, PAN, company registration, experience certificates for similar AMC/CMC work, financial statements, EMD submission (if stated), OEM authorizations or technical compliance certificates, and the ATC-specified technical bid documents.
Standards will be defined in the ATC; bidders should expect IS/BN standards alignment for fire detection, alarm, hydrant, and sprinkler systems, along with OEM compatibility and service level expectations in IOC contract terms.
Deadline details are provided in the ATC; bidders must monitor the GEM portal and the ATC update to confirm the exact bid submission date and any pre-bid meeting schedules.
The available data does not disclose the EMD amount; verify the EMD value and payment method in the ATC to ensure compliant submission with the bid.
ATC will specify on-site attendance windows, emergency response times, preventive maintenance cadence, and reporting formats; bidders should prepare to meet defined SLAs and regular maintenance logs.
Eligibility is demonstrated via prior AMC/CMC experience, OEM authorizations, GST and PAN, financial statements, and compliance certificates as specified in the ATC; ensure all documents are current and verifiable.
Review ATC for exact standards; ensure technicians are trained for IS/IS/ISO-based maintenance, maintain calibration records, and supply warranty/AMC support aligned with IOC requirements.
Sign up now to access all documents
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS