Procurement of 700 Mtr Anti Climb Security Fence System with concertina coil incl installation work
Indian Army
Progress
Quantity
500
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, invites bids for CONCERTINA WIRE FENCING WITH Y MS ANGLE 4 LINE WITH INSTALLATION in PUNE, MAHARASHTRA. The scope covers supply and on-site installation of four-line concertina wire with Y MS angle supports. Key bid terms include a flexible quantity option of up to 25%, and extended delivery windows calculated by a defined formula. Bidders must demonstrate governance-compliant financial health and provide mandated documentation. This procurement emphasizes supplier capability for federal Defence projects and requires a Data Sheet alignment with offered product parameters. Unique factors include consortium allowances and mandatory End User Certificate handling as per Buyer format.
The bid emphasizes risk mitigation through verified end-to-end delivery capability, submission of governance documents, and adherence to GST norms, with a clear focus on government procurement norms and on-time installation at a defence location. The opportunity is distinguished by its defence-grade fencing solution, strong emphasis on data-sheet fidelity, and the option to scale orders within contract terms.
Concertina wire fencing with Y MS angle 4-line configuration
On-site installation included
Data Sheet must match offered product parameters
End User Certificate required in Buyer format
Two years govt/PSU supply experience for similar products
25% quantity variation rights during/after contract
Mandatory Data Sheet alignment with product
Gst and payment terms as per bidder responsibility
GST liability to be clarified by bidder; payments processed as per govt norms; GST reimbursement as actuals or at the applicable rate, whichever is lower, within contract terms.
Delivery period starts from the date of original delivery order; additional time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Penalties for delayed installation or non-compliance are per tender terms; LD details would be provided in the final agreement.
2+ years of regular govt/PSU supply experience for similar fencing products
Not under liquidation or bankruptcy; valid undertaking to that effect
GST registered with GSTIN; PAN and bank EFT mandate in place
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
Bharat Petroleum Corporation Ltd
Indian Council Of Agricultural Research (icar)
MEERUT, UTTAR PRADESH
RDD-CEO-BULDHANA
BULDHANA, MAHARASHTRA
RDD-CEO-NASHIK
NASHIK, MAHARASHTRA
Tender Results
Loading results...
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate certified by Bank
Data Sheet of offered product
End User Certificate (Buyer format)
Experience certificates or contract copies for govt/PSU supply
Consortium Undertaking if applicable
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | Aarohi Enterprises Under PMA | Make : NA Model : AE Title : CONCERTINA WIRE FENCING WITH Y MS ANGLE 4 LINE WITH INSTALLATION | 27-11-2025 22:58:03 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | Aarohi Enterprises(MII) Under PMA | ₹4,25,000 | Item Categories : CONCERTINA WIRE FENCING WITH Y MS ANGLE 4 LINE WITH INSTALLATION |
Key insights about MAHARASHTRA tender market
Bidders must meet 2+ years govt/PSU supply experience for similar fencing products; submit PAN, GSTIN, cancelled cheque, EFT mandate; Data Sheet alignment is mandatory; End User Certificate in Buyer format; consortium options allowed with shared responsibility; delivery terms require adherence to the 25% quantity variation clause.
Required documents include PAN Card, GSTIN, cancelled cheque, EFT Mandate certified by bank; Data Sheet of offered product; End User Certificate in Buyer format; proof of 2+ years govt/PSU supply contracts; consortium undertaking if applicable; and relevant contract copies for prior similar work.
Technical scope covers installation-ready four-line concertina wire with Y MS angle supports; Data Sheet must reflect exact product specifications; no BOQ items are listed; performance standards reference is IS 550 where applicable; the equipment must be suitable for defence perimeter installation at Pune site.
Delivery starts from the last date of the original delivery order. If quantity increases, the extra time is (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; the purchaser may extend to the original delivery period during option exercise.
Bidders must determine GST applicability; the buyer will reimburse GST at actuals or at the lower of the quoted rate, subject to a maximum equal to the quoted GST percentage; bidders must ensure GST compliance in the bid submission.
Bidder or OEM must have at least 2 years of regular manufacture and supply of similar fencing products to Central/State government or a PSU; provide copies of relevant contracts with bid submission to verify eligibility.
Consortium bids may be submitted with multiple sellers; one member acts as leader; all members share equal responsibility for execution; an Undertaking to this effect must be uploaded with bid; ensure clear allocation of roles and liabilities.
Sign up now to access all documents
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS