Bid Publish Date
19-Jun-2026, 1:21 pm
Bid End Date
01-Jul-2026, 9:00 am
EMD
₹1,90,000
Location
Progress
RAQuantity
2
Bid Type
Two Packet Bid
Indian Army announces a tender for P. F. Huts with PUF Panel (MHA) (Q3) in NORTH SIKKIM, SIKKIM. Quantity: 2. Submission Deadline: 01-07-2026 09: 00: 00. Last date to apply is approaching fast!
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
P.F. Huts with PUF Panel (MHA) (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
| Category | Specification | Requirement |
|---|---|---|
| SIZE | Prefabricated Shelter Building sizes | Barrack 9.76 Mtr (32.00 feet) X 5.50 Mtr (18.00 feet) with 1.52 Mtr (5.00 feet) verandah, Barrack 19.52 Mtr (64.00 feet) X 5.50 Mtr (18.00 feet) with 1.52 Mtr (5.00 feet) verandah |
| FOUNDATION | Foundation for Prefab Shelter NOTE : if required | Building of Foundation at site shall be the responsibility of the Consignee and the Seller shall Install / Erect and Commission the structure on the foundation constructed up-to plinth level by the Consignee |
| COLOURS | Outside colour of wall panel | As per buyer’s requirement |
| COLOURS | Inside colour of Wall panel and Roof | As per buyer’s requirement |
| OTHERS | Number of windows in each shelter | 8 numbers windows for Barrack 19.52 Mtr (64.00 feet) X 5.50 Mtr (18.00 feet), 4 numbers windows for Barrack 9.76 Mtr (32.00 feet) X 5.50 Mtr (18.00 feet) |
| TEST REPORT | Availability of Test Report from Designated AHSP / NABL / ILAC accredited or Central Government Lab to prove conformity of products to the specification | Yes |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Start
14-Jul-2026, 7:00 pm
End
15-Jul-2026, 7:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Sign up now to access all documents
Main Document
CATALOG Specification
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS