Indian Air Force invites bids for 48 Core Single Mode unarmourmed Optical Fiber Cable, 24 Core Single Mode unarmoured OFC, Cemented Pipe Dia 150mm for routing of OFC under ground, OFC Splice Enclosure, GI Pipe for road crossing dia 150mm, Construction of manhole Cemented dimension 04 ft X 04 ft X 04 ft with iron cover, 48 core FDF LIU, 24 core FDF LIU, 144 core FDF LIU, Route markers, CatVI UTP Cable, CatVI STP cable, RJ45 24 Port Patch Panel, RJ45 Keystone Jack, IO Box, Casing Capping 1 inch X 6 ft, Casing Capping 2inchX 6 ft, Casing Capping 4inchX 2inch X 6 ft, Laying and installtion of UTP STP cable in casing caping, Velcro for routingtieing OFC patch cord, High Density OFC cable raceway Made of High density PVC, Colour Yellow, Inter facility Buffer cable 48 core OFC Patch cord with LC Connector at both end 5Mtr, Inter facility Buffer cable 24 core OFC Patch cord with LC Connector at both end 5Mtr, 05 Mtr OFC patch cord duplex for inter connectivity, 10 Mtr OFC patch cord duplex for inter connectivity, 02 Mtr LC to LC OFC patch cord duplex, 01 Mtr LC to LC OFC patch cord duplex, 02 Mtr UTP patch cord, 01 Mtr UTP patch cord, Armored UG cable of 200 pair, DP Box of 200 pair for UG cable termination with krone module INCLUDING INSTALLATION, Digging and laying of OFC and JFC at depth of 1. 65 Mtr and 2 ft width as per BSNL IAF standards to lay multiple OFCs in two separate concrete pipes, Splicing of 24 and 48 core OFC at existing site 2 equipment room and NFS PKG site, Provision of iron rack mounting stand as per rack dimensions for positioning of equipment and server rack Dimension, Metallic OFC cable raceway passing inside raised flooring from OFC entry point to HD FDF of dimension 60 ft long x 1 ft wide x 4 inch height including installation, Procurement and installation of DC electric power cable 50Sq mm, Procurement and installation of DC Electric Distribution Box, Procurement and installation of 10 Sq mm 4 core electric power cable, Procurement and installation of 25 Sq mm 4 core flexible electric copper cable, Procurement and installation of distribution box 150 Amps, Procurement and installation of eyelet lugs cable 50 Sq, Procurement and installation of eyelet lugs cable 10 Sq, Procurement and installation of eyelet lugs cable 25 Sq, Removal of 42 U Rack from existing site and installation with grouting at new site, MCCB 150 Amps, 3 Phase MCB 63 Amps, Single Phase Two Pole MCB 32 Amps, Single Phase Two Pole MCB 63 Amps, 3 Phase SPD Type1, Cable Tray with cover for Electric cables including installation in DIBRUGARH, ASSAM. Quantity: 17176. Submission Deadline: 22-05-2025 09: 00: 00. Submit your proposal before the deadline.
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Hqids
BHOPAL, MADHYA PRADESH
Indian Navy
SOUTH GOA, GOA
Marketing Division
LUCKNOW, UTTAR PRADESH
Indian Army
TIRUVALLUR, TAMIL NADU
Dg Armed Forces Medical Service
LEH, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | 48 Core Single Mode unarmourmed Optical Fiber Cable | 48 Core Single Mode unarmourmed Optical Fiber Cable | 3,000 | mtr | information@14 | 60 |
| 2 | 24 Core Single Mode unarmoured OFC | 24 Core Single Mode unarmoured OFC | 5,000 | mtr | information@14 | 60 |
| 3 | Cemented Pipe Dia 150mm for routing of OFC under ground | Cemented Pipe Dia 150mm for routing of OFC under ground | 700 | mtr | information@14 | 60 |
| 4 | OFC Splice Enclosure | 24 and 48 core OFC Splice Enclosure | 25 | each | information@14 | 60 |
| 5 | GI Pipe for road crossing dia 150mm | GI Pipe for road crossing dia 150mm | 50 | mtr | information@14 | 60 |
| 6 | Construction of manhole Cemented dimension 04 ft X 04 ft X 04 ft with iron cover | Construction of manhole Cemented dimension 04 ft X 04 ft X 04 ft with iron cover | 2 | each | information@14 | 60 |
| 7 | 48 core FDF LIU | 48 core FDF LC to LC | 14 | each | information@14 | 60 |
| 8 | 24 core FDF LIU | 24 core FDF LC to LC | 5 | each | information@14 | 60 |
| 9 | 144 core FDF LIU | 144 core FDF LC to LC | 2 | each | information@14 | 60 |
| 10 | Route markers | Route Jointing markers Cemented pillar type 3feetx1feetx3inch | 10 | each | information@14 | 60 |
| 11 | CatVI UTP Cable | Cat-VI UTP Cable Copper 23 AWG | 2,440 | mtr | information@14 | 60 |
| 12 | CatVI STP cable | Cat VI STP cable Copper 23 AWG | 1,525 | mtr | information@14 | 60 |
| 13 | RJ45 24 Port Patch Panel | RJ45 24 Port Patch Panel Loaded | 10 | each | information@14 | 60 |
| 14 | RJ45 Keystone Jack | RJ45 Keystone Jack | 140 | each | information@14 | 60 |
| 15 | IO Box | IO Box 2 Port30 and 4 Port 20 | 50 | each | information@14 | 60 |
| 16 | Casing Capping 1 inch X 6 ft | Casing Capping 1inch X 6 ft | 200 | each | information@14 | 60 |
| 17 | Casing Capping 2inchX 6 ft | Casing Capping 2inch X 6 ft | 200 | each | information@14 | 60 |
| 18 | Casing Capping 4inchX 2inch X 6 ft | Casing Capping 4inchX 2inch X 6 ft | 50 | each | information@14 | 60 |
| 19 | Laying and installtion of UTP STP cable in casing caping | Laying and installtion of UTP STP cable in casing caping | 900 | mtr | information@14 | 120 |
| 20 | Velcro for routingtieing OFC patch cord | Velcro for routing tieing OFC patch cord | 10 | role | information@14 | 60 |
| 21 | High Density OFC cable raceway Made of High density PVC, Colour Yellow | High Density OFC cable raceway Made of High density PVC, Colour-Yellow | 40 | mtr | information@14 | 60 |
| 22 | Inter facility Buffer cable 48 core OFC Patch cord with LC Connector at both end 5Mtr | Inter facility Buffer cable 48 core OFC Patch cord with LC Connector at both end 5Mtr | 5 | each | information@14 | 60 |
| 23 | Inter facility Buffer cable 24 core OFC Patch cord with LC Connector at both end 5Mtr | Inter facility Buffer cable 24 core OFC Patch cord with LC Connector at both end 5Mtr | 8 | each | information@14 | 60 |
| 24 | 05 Mtr OFC patch cord duplex for inter connectivity | 05 Mtr LC to LC OFC patch cord duplex for inter connectivity | 50 | each | information@14 | 60 |
| 25 | 10 Mtr OFC patch cord duplex for inter connectivity | 10 Mtr LC to LC OFC patch cord duplex for inter connectivity | 60 | each | information@14 | 60 |
| 26 | 02 Mtr LC to LC OFC patch cord duplex | 02 Mtr LC to LC OFC patch cord duplex | 200 | each | information@14 | 60 |
| 27 | 01 Mtr LC to LC OFC patch cord duplex | 01 Mtr LC toLC OFC patch cord duplex | 200 | each | information@14 | 60 |
| 28 | 02 Mtr UTP patch cord | 02 Mtr UTP patch cord | 40 | each | information@14 | 60 |
| 29 | 01 Mtr UTP patch cord | 01 Mtr UTP patch cord | 40 | each | information@14 | 60 |
| 30 | Armored UG cable of 200 pair | Armored UG cable of 200 pair | 450 | mtr | information@14 | 60 |
| 31 | DP Box of 200 pair for UG cable termination with krone module INCLUDING INSTALLATION | DP Box of 200 pair for UG cable termination with krone module | 2 | each | information@14 | 60 |
| 32 | Digging and laying of OFC and JFC at depth of 1.65 Mtr and 2 ft width as per BSNL IAF standards to lay multiple OFCs in two separate concrete pipes | Digging and laying of OFC at depth of 1.65 Mtr and 2 ft width as per BSNL/ IAF standards to lay multiple OFCs in two separate concrete pipes | 350 | mtr | information@14 | 120 |
| 33 | Splicing of 24 and 48 core OFC at existing site 2 equipment room and NFS PKG site | Splicing of 24 and 48 core OFC at existing site 2 equipment room and NFS PKG site | 1,000 | core | information@14 | 120 |
| 34 | Provision of iron rack mounting stand as per rack dimensions for positioning of equipment and server rack Dimension | 01mtr x 0.8mtr x 0.48mtr Qty 02, 01mtr x 0.8mtr x 0.48mtr Qty 02, 0.6mtr x 0.8mtr x 0.48mtr Qty 01, 0.4mtr x 0.6mtr x 0.48mtr Qty 01, 0.68mtr x 1.06mtr x 0.48mtr Qty 02 | 6 | each | information@14 | 120 |
| 35 | Metallic OFC cable raceway passing inside raised flooring from OFC entry point to HD FDF of dimension 60 ft long x 1 ft wide x 4 inch height including installation | Metallic OFC cable raceway passing inside raised flooring from OFC entry point to HD FDF of dimension 60 ft long x 1 ft wide x 4 inch height including installation | 1 | each | information@14 | 120 |
| 36 | Procurement and installation of DC electric power cable 50Sq mm | Procurement and installation of DC electric power cable 50Sq mm | 100 | mtr | information@14 | 120 |
| 37 | Procurement and installation of DC Electric Distribution Box | Procurement and installation of DC(Electric) Distribution Box | 2 | each | information@14 | 120 |
| 38 | Procurement and installation of 10 Sq mm 4 core electric power cable | Procurement and installation of 10 Sq mm 4 core electric power cable | 80 | mtr | information@14 | 120 |
| 39 | Procurement and installation of 25 Sq mm 4 core flexible electric copper cable | Procurement and installation of 25 Sq mm 4 core flexible electric copper cable | 50 | mtr | information@14 | 120 |
| 40 | Procurement and installation of distribution box 150 Amps | Procurement and installation of distribution box 150 Amps | 2 | each | information@14 | 120 |
| 41 | Procurement and installation of eyelet lugs cable 50 Sq | Procurement and installation of eyelet lugs cable 50 Sq | 20 | each | information@14 | 120 |
| 42 | Procurement and installation of eyelet lugs cable 10 Sq | Procurement and installation of eyelet lugs cable 10 Sq | 30 | each | information@14 | 120 |
| 43 | Procurement and installation of eyelet lugs cable 25 Sq | Procurement and installation of eyelet lugs cable 25 Sq | 30 | each | information@14 | 120 |
| 44 | Removal of 42 U Rack from existing site and installation with grouting at new site | Removal of 42 U Rack from existing site and installation with grouting at new site | 4 | each | information@14 | 120 |
| 45 | MCCB 150 Amps | MCCB 150 Amps | 2 | each | information@14 | 120 |
| 46 | 3 Phase MCB 63 Amps | 3 Phase MCB 63 Amps | 4 | each | information@14 | 120 |
| 47 | Single Phase Two Pole MCB 32 Amps | Single Phase Two Pole MCB 32 Amps | 22 | each | information@14 | 120 |
| 48 | Single Phase Two Pole MCB 63 Amps | Single Phase Two Pole MCB 63 Amps | 4 | each | information@14 | 120 |
| 49 | 3 Phase SPD Type1 | 3 Phase SPD Type1 | 1 | each | information@14 | 120 |
| 50 | Cable Tray with cover for Electric cables including installation | Cable Tray with cover for Electric cables including installation | 40 | mtr | information@14 | 120 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Start
07-Jun-2025, 10:00 am
End
09-Jun-2025, 9:00 am
Duration: 47 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | ALL TIME SERVICE TECHNOLOGY(MSE,MII) Under PMA Winner | ₹19,26,915 | Item Categories : 48 Core Single Mode unarmourmed Optical Fiber Cable,24 Core Single Mode unarmoured OFC,Cemented Pip |
| L2 | M/S PHOENIX KONCEPTS (MII) Under PMA | ₹19,32,125 | Item Categories : 48 Core Single Mode unarmourmed Optical Fiber Cable,24 Core Single Mode unarmoured OFC,Cemented Pip |
| L3 | SDH Enterprises (MSE,MII) Under PMA | ₹36,30,022 | Item Categories : 48 Core Single Mode unarmourmed Optical Fiber Cable,24 Core Single Mode unarmoured OFC,Cemented Pip |
🎉 L1 Winner
ALL TIME SERVICE TECHNOLOGY(MSE,MII) Under PMA
Final Price: ₹19,26,915
Key insights about ASSAM tender market
The eligibility requirements include being a registered entity, having substantial experience in telecommunications projects, and adhering to all regulatory standards set forth by the Ministry of Defence. Interested bidders must provide evidence of prior projects and legal compliance documentation to qualify.
Bidders must submit a complete Bid Proposal Form, a detailed Bill of Quantities (BOQ), recent Financial Statements, and relevant Compliance Certificates during the tender submission process. All documents should be submitted electronically in formats specified in the tender guidelines.
The primary materials required are 48 Core and 24 Core Single Mode unarmoured Optical Fiber Cables, along with high-quality Fiber Distribution Frames (FDF) and Cemented Pipes for underground routing. Bidders should ensure that all products meet the latest required quality standards and specifications within the telecommunications industry.
Payment terms generally involve an upfront Earnest Money Deposit (EMD) followed by milestone-based payments upon completion of specific project phases. A detailed payment schedule will be discussed with the winning bidder to ensure clarity and adherence to financial regulations.
Yes, the tender includes specific benefits for Micro, Small, and Medium Enterprises (MSEs) and startups, such as participation incentives and preferential bidding conditions. This is part of a broader initiative to empower smaller entities within the industry and create a diverse contractor pool.