Contract Bidding Open For Title1,Title2,Title3,Title4,Title5,Title6,Title7,Title8,Title9,Title10,Title11,Title12,Title13,Titl in EAST SINGHBHUM, JHARKHAND

Bid Publish Date

06-Jun-2026, 3:18 pm

Bid End Date

27-Jun-2026, 4:00 pm

EMD

₹29,194

Value

₹29,19,405

Progress

Issue06-Jun-2026, 3:18 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

29325

Category

Title1

Bid Type

Two Packet Bid

Categories 70

Uranium Corporation Of India Limited invites bids for Title1, Title2, Title3, Title4, Title5, Title6, Title7, Title8, Title9, Title10, Title11, Title12, Title13, Title14, Title15, Title16, Title17, Title18, Title19, Title20, Title21, Title22, Title23, Title24, Title25 in EAST SINGHBHUM, JHARKHAND. Quantity: 29325. Submission Deadline: 27-06-2026 16: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Title1 , Title2 , Title3 , Title4 , Title5 , Title6 , Title7 , Title8 , Title9 , Title10 , Title11 , Title12 , Title13 , Title14 , Title15 , Title16 , Title17 , Title18 , Title19 , Title20 , Title21 , Title22 , Title23 , Title24 , Title25

Authority Records

DEPARTMENT OF ATOMIC ENERGY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9432105.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 25 Items Sign in for GEM prices

#1

Title1

Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing (1 Cement , 2 coarse sand (zone III), 4 graded stone aggregate 20 mm nominal size)

80 cu m Delivery: 150 days
#2

Title2

Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landing, balconies and access platform

480 sq m Delivery: 150 days
#3

Title3

Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts

150 sq m Delivery: 150 days
#4

Title4

Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. Thermo Mechanically Treated bars of grade Fe 500D or more.

500 kg Delivery: 150 days
#5

Title5

Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in a) Cement mortar (1 cement, 6 coarse sand)

25 cu m Delivery: 150 days
#6

Title6

12 mm cement plaster of mix (1 cement, 4 fine sand)

200 sq m Delivery: 150 days
#7

Title7

Neat cement punning.

50 sq m Delivery: 150 days
#8

Title8

Providing and fixing 1st quality ceramic glazed floor tiles conforming to IS 15622 (thickness to be specified by the manufacturer) of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by EIC in skirting, risers of steps and dados over 12 mm thick bed or cement Mortar (1 cement, 3 coarse sand) and jointing with grey cement slurry, 3.3 kg per sqm including pointing in white cement mixed with pigment of matching shade complete.

100 sq m Delivery: 150 days
#9

Title9

White washing with lime to give an even shade. a) Satna lime wash on walls with one coat.

10,800 sq m Delivery: 150 days
#10

Title10

Removing white or colour wash by scrapping and sand preparing the surface smooth including necessary papering and repairs to scratches etc. complete

4,000 sq m Delivery: 150 days
#11

Title11

Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade. One or more coats on old work

150 sq m Delivery: 150 days
#12

Title12

Finishing walls with water proofing cement paint of required shade. New work (Two or more coats applied, 3.84 kg per 10 sqm)

4,000 sq m Delivery: 150 days
#13

Title13

Distempering with 1st quality acrylic distemper (ready made) having VOC content less than 50 gm per ltr. of approved manufacturer and of required shade and colour complete as per manufacturers specification. One or more coats on old work

6,800 sq m Delivery: 150 days
#14

Title14

Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade, One or more coats on old work

200 sq m Delivery: 150 days
#15

Title15

Providing and fixing soil, waste and vent pipes 100 mm dia, Sand cast iron S and S pipe as per IS 1729

60 meter Delivery: 150 days
#16

Title16

Demolishing R.C.C. work manually by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of EIC

5 cu m Delivery: 150 days
#17

Title17

Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete.

125 sq m Delivery: 150 days
#18

Title18

Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of EIC. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding.

200 sq m Delivery: 150 days
#19

Title19

Cement concrete flooring (1 cement, 2 coarse sand, 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate

50 sq m Delivery: 150 days
#20

Title20

1.5 mm thick decorative laminated sheet

600 sq m Delivery: 150 days
#21

Title21

Labour for fitting and fixing G.C.l. or C.A. sheet roofing in proper slope including the cost of J or L hooks, limpet Iand bitumen washers, carriage of sheets to work site, and taxes all complete as per building specification and direction of EIC.

600 sq m Delivery: 150 days
#22

Title22

Servicing of rolling Shutters, Rolling shutter made of 80mm x 1.25 mm machine rolled laths

50 sq m Delivery: 150 days
#23

Title23

Servicing of rolling Shutters, Top cover for rolling shutters 1.25 mm thick metre

50 meter Delivery: 150 days
#24

Title24

Servicing of rolling Shutters, 27.5 cm long wire spring grade No. 2 for rolling shutters

25 each Delivery: 150 days
#25

Title25

Servicing of rolling Shutters, Ball bearing for rolling shutters

25 each Delivery: 150 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Bidder Turnover

3

Additional Doc 1 (Requested in ATC)

4

Additional Doc 2 (Requested in ATC)

5

Additional Doc 3 (Requested in ATC)

6

Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer