TenderDekho Logo
Closed GEM

Government Tender Published for Supply of 48 ports stackableLayer-3 fully managed switch,Supply of 28 ports multi-Gigabit ethernet in SOUTH SIKKIM, SIKKIM

Bid Publish Date

05-Sep-2025, 1:19 pm

Bid End Date

20-Sep-2025, 4:00 pm

EMD

₹70,000

Value

₹34,79,992

Progress

Issue05-Sep-2025, 1:19 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

2339

Category

Supply of 10G Base X Single mode Fibre SFP plus module

Bid Type

Two Packet Bid

Categories 40

Nhpc Limited announces a tender for Supply of 48 ports stackableLayer-3 fully managed switch, Supply of 28 ports multi-Gigabit ethernet smart managed PoE plus plus Switch, Supply of 10 ports multi Gigabit ethernet smart managed switch, Supply of 10G Base X Single mode Fibre SFP plus module, Supply of WiFi 6 PoE plus Tri band Multi-Gig Wireless Access Point, Supply of 6 Core Fibre Single mode G point 652 D Outdoor, Supply of 12 Port 19 Inch Rack mount sliding LIU Fully Loaded 4 Adapter, Supply of 24 Port 19 Inch Rack mount sliding LIU Fully Loaded 4 Adapter Plates front panel, Supply of SC UPC LC UPC Single mode Bend insensitive 2mm Duplex patch cord, 2meter, Supply of CAT6 U UTP 4 Pair PVC jacket cable, Grey, 305Mtr per Box, Supply of I O Box CAT6 RJ45 full set with front and back box, Supply of Unshielded CAT6 Stranded LSZH Patchcord, Supply of 1KV Online UPS with inbuilt battery backup, Supply of 9U Single Section Wall mount Network RACK 550x650mm, Supply of 42U Floor Standing Network Server RACK 800x1200 mm, Supply of 3Core 1 point 5mm Unshielded Power Cable, Supply of 25mm PVC MMS Conduit, Supply of 32mm HDPE Pipe, Cable laying including all accessories with existing conduit, ICT Installation, testing, commissioning, Demonstration and maintenance Charges in SOUTH SIKKIM, SIKKIM. Quantity: 2339. Submission Deadline: 20-09-2025 16: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply of 48 ports stackableLayer-3 fully managed switch , Supply of 28 ports multi-Gigabit ethernet smart managed PoE plus plus Switch , Supply of 10 ports multi Gigabit ethernet smart managed switch , Supply of 10G Base X Single mode Fibre SFP plus module , Supply of WiFi 6 PoE plus Tri band Multi-Gig Wireless Access Point , Supply of 6 Core Fibre Single mode G point 652 D Outdoor , Supply of 12 Port 19 Inch Rack mount sliding LIU Fully Loaded 4 Adapter , Supply of 24 Port 19 Inch Rack mount sliding LIU Fully Loaded 4 Adapter Plates front panel , Supply of SC UPC LC UPC Single mode Bend insensitive 2mm Duplex patch cord, 2meter , Supply of CAT6 U UTP 4 Pair PVC jacket cable, Grey, 305Mtr per Box , Supply of I O Box CAT6 RJ45 full set with front and back box , Supply of Unshielded CAT6 Stranded LSZH Patchcord , Supply of 1KV Online UPS with inbuilt battery backup , Supply of 9U Single Section Wall mount Network RACK 550x650mm , Supply of 42U Floor Standing Network Server RACK 800x1200 mm , Supply of 3Core 1 point 5mm Unshielded Power Cable , Supply of 25mm PVC MMS Conduit , Supply of 32mm HDPE Pipe , Cable laying including all accessories with existing conduit , ICT Installation, testing, commissioning, Demonstration and maintenance Charges

Authority Records

MINISTRY OF POWERNATIONAL HYDROELECTRIC POWER CORPORATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 7

GeM-Bidding-8169018.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 20 Items Sign in for GEM prices

#1

Supply of 48 ports stackableLayer-3 fully managed switch

As Per BOQ and Detailed TS

1 pieces Delivery: 90 days
#2

Supply of 28 ports multi-Gigabit ethernet smart managed PoE plus plus Switch

As Per BOQ and Detailed TS

1 pieces Delivery: 90 days
#3

Supply of 10 ports multi Gigabit ethernet smart managed switch

As Per BOQ and Detailed TS

2 pieces Delivery: 90 days
#4

Supply of 10G Base X Single mode Fibre SFP plus module

As Per BOQ and Detailed TS

32 pieces Delivery: 90 days
#5

Supply of WiFi 6 PoE plus Tri band Multi-Gig Wireless Access Point

As Per BOQ and Detailed TS

9 pieces Delivery: 90 days
#6

Supply of 6 Core Fibre Single mode G point 652 D Outdoor

As Per BOQ and Detailed TS

450 meters Delivery: 90 days
#7

Supply of 12 Port 19 Inch Rack mount sliding LIU Fully Loaded 4 Adapter

As Per BOQ and Detailed TS

3 pieces Delivery: 90 days
#8

Supply of 24 Port 19 Inch Rack mount sliding LIU Fully Loaded 4 Adapter Plates front panel

As Per BOQ and Detailed TS

1 pieces Delivery: 90 days
#9

Supply of SC UPC LC UPC Single mode Bend insensitive 2mm Duplex patch cord, 2meter

As Per BOQ and Detailed TS

10 pieces Delivery: 90 days
#10

Supply of CAT6 U UTP 4 Pair PVC jacket cable, Grey, 305Mtr per Box

As Per BOQ and Detailed TS

2 boxes Delivery: 90 days
#11

Supply of I O Box CAT6 RJ45 full set with front and back box

As Per BOQ and Detailed TS

10 sets Delivery: 90 days
#12

Supply of Unshielded CAT6 Stranded LSZH Patchcord

As Per BOQ and Detailed TS

10 pieces Delivery: 90 days
#13

Supply of 1KV Online UPS with inbuilt battery backup

As Per BOQ and Detailed TS

3 pieces Delivery: 90 days
#14

Supply of 9U Single Section Wall mount Network RACK 550x650mm

As Per BOQ and Detailed TS

3 pieces Delivery: 90 days
#15

Supply of 42U Floor Standing Network Server RACK 800x1200 mm

As Per BOQ and Detailed TS

1 pieces Delivery: 90 days
#16

Supply of 3Core 1 point 5mm Unshielded Power Cable

As Per BOQ and Detailed TS

200 meters Delivery: 90 days
#17

Supply of 25mm PVC MMS Conduit

As Per BOQ and Detailed TS

50 pieces Delivery: 90 days
#18

Supply of 32mm HDPE Pipe

As Per BOQ and Detailed TS

350 meters Delivery: 90 days
#19

Cable laying including all accessories with existing conduit

As Per BOQ and Detailed TS

1,200 meters Delivery: 90 days
#20

ICT Installation, testing, commissioning, Demonstration and maintenance Charges

As Per BOQ and Detailed TS

1 lot Delivery: 90 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer