Organization: Indian Coast Guard (Department of Defence). Service category: Repair, maintenance, and installation of plant/systems/equipment (Version 2) with emphasis on AC compressor No. 1 replacement due to suboptimal performance and overload trips. Location: coastal operations; tender scope focuses on on-board or attached serviceable compressors in the ICGS C-423 class framework. Estimated value and EMD are not disclosed in the data, but the project contemplates a full compressor replacement and related installation. The tender notes a flexible scope via an ATC/bid-specific SOW attachment and a 50% quantity/duration adjustment clause, enabling scope expansion with consent. The absence of a BOQ indicates a sole-component repair/upgrade task, potentially involving OEM replacement with compatible units. Unique aspect: integration with existing shipboard systems, potential supplier collaboration based on ATC terms. The document signals formal attachments for SOW and ATC, implying structured technical acceptance criteria.
AC compressor replacement for No. 1 unit on ICGS platform
Field installation and commissioning of replacement compressor
Compatibility with existing shipboard electrical/control interfaces
Compliance with ATC/SOW specifications attached by buyer
OEM-authorized spare parts and warranty terms to be defined in ATC
50% quantity/duration adjustment allowed before contract issuance; post-issuance cap at 50%
Review of SOW and ATC attachments mandatory for scope and technical criteria
EMD, payment terms, and delivery timelines to be detailed in ATC/BoQ
Payment terms to be described in ATC; requires adherence to defence procurement schedules and milestone payments post-commissioning
Delivery and installation milestones defined in ATC/SOW; shipboard integration critical for operational readiness
LDs, if any, will be specified in ATC; early/late delivery penalties aligned with defence procurement norms
Experience in marine/combat vessel AC system maintenance or compressor replacement
Capability to provide OEM-authorized compressor and installation services
Compliance with GST, PAN, and relevant defence procurement norms
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-423; E 020 Performance of AC Compressor no 1 suboptimal Compressor frequently trip overload protection under normal load condition Compressor to be replaced with ..
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
SCOPE_OF_WORK
GEM_GENERAL_TERMS_AND_CONDITIONS
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar AC compressor replacement on marine platforms
Financial statements or solvency certificate
EMD/Security deposit documents as per ATC
Technical bid documents and compliance certificates
OEM authorizations or tie-up letters for the proposed compressor
Any ATC-specific documents referenced in Buyer Added ATC
Extended Deadline
11-Jun-2026, 11:00 am
Opening Date
11-Jun-2026, 11:30 am
Extended Deadline
08-Jun-2026, 11:00 am
Opening Date
08-Jun-2026, 11:30 am
Key insights about ANDAMAN & NICOBAR tender market
Bidders should submit GST, PAN, and experience certificates, plus OEM authorizations for the compressor. Review the SOW and ATC attachments for scope, deliverables, and payment terms; ensure shipboard integration capabilities and provide a detailed installation plan with milestones.
Required documents include GST certificate, PAN, experience certificates for compressor replacement on vessels, financial statements, EMD, OEM authorization, and technical bid documents as specified in the ATC/SOW attachments.
The buyer may increase or decrease contract quantity or duration up to 50% prior to contract issuance; post-issuance, changes remain capped at 50% with the service provider's agreement in lumpsum scenarios.
Replacement must align with shipboard interfaces and control systems; installation and commissioning are included in the scope, with milestones defined in the ATC/SOW document.
Exact timelines are defined in the ATC/SOW; bidders should prepare a phased plan with procurement, removal, installation, testing, and commissioning aligned to defence schedules.
ATC references the need for OEM-compliant parts and shipboard installation; exact standards are specified in the SOW/ATC attachments and OEM documentation.
Confirm marine repair capability, OEM authorization, financial stability, and prior experience in vessel compressor replacement; ensure compliance with GST, PAN, and ATC submission requirements.
Payment terms are defined in the ATC; bidders should expect milestone-based payments post-installation and commissioning, subject to compliance and acceptance testing.