TenderDekho Logo
Closed GEM

Bids are Invited For Socket Adaptor with Pyramid Adaptor,Tube Clamp Adaptor,Tube Clamp Long,Foam Cover AK,AK Cosmetic St in KAMRUP, ASSAM

Bid Publish Date

01-Aug-2026, 2:04 pm

Bid End Date

31-Aug-2026, 3:00 pm

Location

Progress

Issue01-Aug-2026, 2:04 pm
AwardPending

Indian Army has released a public tender for Socket Adaptor with Pyramid Adaptor, Tube Clamp Adaptor, Tube Clamp Long, Foam Cover AK, AK Cosmetic Stockings, BK Cosmetic Stockings, Orthocryl Lamination Resin 80 colon 20, Hardening Powder for Resin, PVA Bags Box of 10 Pcs 130X22X5, Carrying Strap White Cotton Webbing 35, Rust Removal Spray, Pedding Sheet, Pedilin Caucasian 6mm, Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core slash Plastic Keel With Foot Shell Size 24 Lt, Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core slash Plastic Keel With Foot Shell Size 24 Rt, Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core slash Plastic Keel With Foot Shell Size 25 Lt, Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core slash Plastic Keel With Foot Shell Size 25 Rt, BK Pylon, Plaster of Paris Bandage, Double End Adaptor 90mm, Buckle Sliding 1 dot 5 in KAMRUP, ASSAM. Quantity: 899. Submission Deadline: 31-08-2026 15: 00: 00. Download documents and apply online.

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

899

Category

Socket Adaptor with Pyramid Adaptor

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Item wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

1

OEM Avg. Turnover

4

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Socket Adaptor with Pyramid Adaptor , Tube Clamp Adaptor , Tube Clamp Long , Foam Cover AK , AK Cosmetic Stockings , BK Cosmetic Stockings , Orthocryl Lamination Resin 80 colon 20 , Hardening Powder for Resin , PVA Bags Box of 10 Pcs 130X22X5 , Carrying Strap White Cotton Webbing 35 , Rust Removal Spray , Pedding Sheet , Pedilin Caucasian 6mm , Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core slash Plastic Keel With Foot Shell Size 24 Lt , Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core slash Plastic Keel With Foot Shell Size 24 Rt , Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core slash Plastic Keel With Foot Shell Size 25 Lt , Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core slash Plastic Keel With Foot Shell Size 25 Rt , BK Pylon , Plaster of Paris Bandage , Double End Adaptor 90mm , Buckle Sliding 1 dot 5

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

6

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Kamrup

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-KamrupKamrup--645-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9669918.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 21 Items Sign in for GEM prices

#1

Socket Adaptor with Pyramid Adaptor

Socket Adaptor with Pyramid Adaptor

6 no Delivery: 45 days
#2

Tube Clamp Adaptor

Tube Clamp Adaptor

7 no Delivery: 45 days
#3

Tube Clamp Long

Tube Clamp Long

7 no Delivery: 45 days
#4

Foam Cover AK

Foam Cover AK

3 no Delivery: 45 days
#5

AK Cosmetic Stockings

AK Cosmetic Stockings

10 no Delivery: 45 days
#6

BK Cosmetic Stockings

BK Cosmetic Stockings

10 no Delivery: 45 days
#7

Orthocryl Lamination Resin 80 colon 20

Orthocryl Lamination Resin 80 colon 20

9 kg Delivery: 45 days
#8

Hardening Powder for Resin

Hardening Powder for Resin

300 gm Delivery: 45 days
#9

PVA Bags Box of 10 Pcs 130X22X5

PVA Bags Box of 10 Pcs 130X22X5

6 no Delivery: 45 days
#10

Carrying Strap White Cotton Webbing 35

Carrying Strap White Cotton Webbing 35

100 mtr Delivery: 45 days
#11

Rust Removal Spray

Rust Removal Spray

2 no Delivery: 45 days
#12

Pedding Sheet

Pedding Sheet

5 sheet Delivery: 45 days
#13

Pedilin Caucasian 6mm

Pedilin Caucasian 6mm

14 sheet Delivery: 45 days
#14

Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core slash Plastic Keel With Foot Shell Size 24 Lt

Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core slash Plastic Keel With Foot Shell Size 24 Lt

3 no Delivery: 45 days
#15

Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core slash Plastic Keel With Foot Shell Size 24 Rt

Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core slash Plastic Keel With Foot Shell Size 24 Rt

3 no Delivery: 45 days
#16

Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core slash Plastic Keel With Foot Shell Size 25 Lt

Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core slash Plastic Keel With Foot Shell Size 25 Lt

3 no Delivery: 45 days
#17

Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core slash Plastic Keel With Foot Shell Size 25 Rt

Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core slash Plastic Keel With Foot Shell Size 25 Rt

3 no Delivery: 45 days
#18

BK Pylon

BK Pylon

15 no Delivery: 45 days
#19

Plaster of Paris Bandage

Plaster of Paris Bandage

240 no Delivery: 45 days
#20

Double End Adaptor 90mm

Double End Adaptor 90mm

3 no Delivery: 45 days
#21

Buckle Sliding 1 dot 5

Buckle Sliding 1 dot 5

150 no Delivery: 45 days

Categories 21

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer