TenderDekho Logo
Active GEM

South East Central Railway Air Circulator Type Electric Fan and Regulator Tender Raipur Chhattisgarh IS 2997 (Q2) 2026

Bid Publish Date

30-Aug-2026, 1:00 pm

Bid End Date

09-Sep-2026, 1:00 pm

Progress

Issue30-Aug-2026, 1:00 pm
AwardPending

Key Highlights

  • IS 2997 (Q2) compliance for air circulator fans and regulators
  • Quantity variation up to 25% during contract execution
  • Post-receipt inspection at consignee site by OEM GC & TC
  • Raipur, Chhattisgarh procurement under Indian Railways

Tender Overview

The South East Central Railway (Indian Railways) invites bids for Air Circulator Type Electric Fans and Regulators conforming to IS 2997 (Q2) in Raipur, Chhattisgarh. The procurement scope is the supply of goods for construction category stores, with specifications including fan size tolerance, blade count, induction motor type, minimum total air delivery, mounting type, and height adjustment availability. Although the BOQ shows no line items, the tender emphasizes IS 2997 (Q2) compliance and single-site supplier delivery to RAIPUR. The bid allows a quantity variation up to 25% during contract execution, at contracted rates, with delivery-time adjustments tied to original and extended periods. The inspection regime includes post-receipt inspection at consignee site by OEM GC/TC. Unique points include the IS 2997 (Q2) standard requirement and option-based quantity flexibility.

Technical Specifications & Requirements

  • Organization: South East Central Railway (Indian Railways) – Raipur, Chhattisgarh 492001
  • Product category: Air Circulator Type Electric Fan and Regulator conforming to IS 2997 (Q2)
  • Key specs extracted: Size of fan (tolerance ±5 mm), number of blades, induction motor type, minimum total air delivery (m3/min), mounting type, height adjustment availability
  • Quality/standards: IS 2997 (Q2) compliance; construction category stores
  • Delivery context: Delivery terms aligned to original and extended delivery periods with option clause
  • Inspection: Post-receipt inspection at consignee site by OEM GC & TC; pre-dispatch not mandated
  • Value/EMD: Not disclosed in data; some flexibility exists for quantity variation up to 25%
  • BOQ: 0 items listed as of data; procurement implied as supply-only

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase/decrease quantity up to 25% of bid quantity; extended delivery period proportionally adjusted with a minimum of 30 days
  • Scope of Supply: Bid price to include all cost components; scope is Only supply of Goods
  • Inspection: Post-receipt inspection by consignee on OEM GC & TC; no pre-dispatch inspection selected in ATC
  • Delivery/Payment: Delivery timeline tied to original/extended periods; payment terms not specified in data
  • Documents & Compliance: Submit standard OEM authorizations and IS 2997 (Q2) compliance; ensure availability of required certification

Key Specifications

  • Product: Air Circulator Type Electric Fan and Regulator

  • Standards: IS 2997 (Q2) compliant

  • Category: Construction – Store equipment

  • Key specs: Fan size with ±5 mm tolerance; number of blades; induction motor type

  • Performance: Minimum total air delivery (m3/min) as per IS 2997 (Q2) and project needs

Terms & Conditions

  • 25% quantity variation allowed with contracted rates

  • Post-receipt inspection at consignee site by OEM GC & TC

  • Supply-only scope; no pre-dispatch inspection required by ATC

  • Delivery schedule aligned to original and extended periods with minimum 30 days

Important Clauses

Option Clause

Purchaser may adjust quantity by ±25% during contract and extended period with corresponding delivery time adjustments.

Delivery Schedule

Delivery period commences from the last date of original delivery order; extended period follows option clause calculations.

Payment Terms

Not specified in data; bidders should assume standard government procurement payment terms unless stated otherwise.

Bidder Eligibility

  • Experience in supplying IS 2997 (Q2) compliant fans or equivalent

  • Financial capacity to handle 25% quantity variation

  • Authorized OEM certification for product supply

Tender Data

Bid Details

Quantity

20

Bid Type

Single Packet Bid

Bid Validity

60 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Air Circulator Type Electric Fan and Regulator (V2) Conforming To IS 2997 (Q2)

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Raipur

Delivery Pincodes

492001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Sudarshan Lal Dhiwar492001,Sr. Section Electrical Engineer (G) S S No : 1, Behind Railway StationRaipurChhattisgarh4920012045-

Authority Records

MINISTRY OF RAILWAYSSOUTH EAST CENTRAL RAILWAY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9822884.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

Indian Railways

Office Name

Hq New General Manager Secr

Grievance Contact

[email protected]

Categories 7

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates demonstrating prior similar supply

4

Financial statements for last 2-3 years

5

EMD/Security deposit details (if applicable)

6

Technical compliance certificates evidencing IS 2997 (Q2) conformity

7

OEM authorization/authorizations from principal supplier

8

Any required installation or maintenance affidavits

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
Construction Description of Stores Air circulator type electric fan and regulator with 2 minimum number of speed, minimum 5 meter flexible cord, guard and speed regulator
Construction Size of Fan (Hint: Tolerance of ± 5 mm) 600.0
Construction Number of Blades 3
Construction Type of Induction Motor Capacitor Type
Construction Minimum Total Air Delivery (in m3/min) 250.0
Construction Mounting Type Oscillating (Automatic, continuous directional change of airflow in one plane)
Construction Availability of Height Adjustment No

Frequently Asked Questions

Key insights about CHHATTISGARH tender market

How to bid on air circulator tender in Raipur for IS 2997 Q2?

Bidders must submit GST, PAN, experience certificates, financials, EMD, and OEM authorizations. Ensure IS 2997 (Q2) compliance, provide technical datasheets, and confirm post-receipt inspection readiness. Include 25% quantity variation acceptance and delivery schedule aligned to RAC terms.

What documents are required for South East Central Railway fan supply?

Submit GST certificate, PAN, company financial statements, at least two similar project experience letters, OEM authorization, technical compliance certificate for IS 2997 (Q2), and EMD details. Attach installation/service capability if applicable and a bid security document.

What are the key technical specifications for IS 2997 fans?

Key specs include fan size with ±5 mm tolerance, specified number of blades, induction motor type, minimum total air delivery in m3/min, mounting type, and height adjustment availability. Ensure conformity to IS 2997 (Q2) and provide performance curves and test reports.

When is delivery expected under the railway option clause for quantity changes?

Delivery schedules adjust with the 25% variation; minimum 30-day additional time applies if extended. Original delivery period governs the base timeframe, with proportional adjustments based on added quantity.

What are the inspection requirements for the fan supply contract?

Post-receipt inspection is conducted at the consignee site by OEM GC & TC; pre-dispatch inspection is not mandated unless ATC specifies. Vendors should be ready for on-site inspection and testing as per contractual standards.

What standards govern the air circulator equipment for this tender?

Equipment must conform to IS 2997 (Q2). Bidders should provide ISI/ISO certifications if applicable and attach third-party test reports demonstrating compliance with the standard.

What is the scope of supply for the bidder in this tender?

Scope is limited to the supply of goods only; services, installation, or commissioning are not included unless explicitly stated. Ensure all cost components are included in the bid price.

What is the minimum air delivery requirement for the fan?

The tender specifies a minimum total air delivery in m3/min as part of the construction category specs. Provide exact delivery value from the technical datasheet and verify it against IS 2997 (Q2) requirements.