Bid Publish Date
24-Dec-2025, 4:30 pm
Bid End Date
14-Jan-2026, 3:00 pm
Location
Progress
RAQuantity
106
Category
CONE TYPE INSULATORS WITH LOCK NUT
Bid Type
Two Packet Bid
Bharat Heavy Electricals Limited invites bids for the supply of electrical components including strip heater for top hat furnace, rectangular ceramic insulators, cone type insulators with lock nut, insulators for busbar support, and ceramic insulators for heater protection. The procurement location is Visakhapatnam, Andhra Pradesh. Scope notes indicate “Scope of supply: Only supply of Goods,” with an estimated contract value not disclosed and an EMD not specified in available data. The package appears to target multiple insulator and heater components for heavy electrical equipment, emphasizing standardization and OEM compatibility. A notable commercial term is the option clause allowing up to 25% quantity variation during contract and extension periods, with delivery calculations based on original/delivered quantities and minimum 30 days adjustments. The tender requires GST compliance considerations and specific documentary proofs for vendor code creation, including PAN, GSTIN, bank details, and EFT mandate. Vendor must ensure GST invoicing aligned to consignee GSTIN. The absence of explicit technical specs suggests bidders should rely on standard IS/IEC manufacturing norms for insulators and heater components and align with typical BHEL procurement quality controls. This tender targets qualified suppliers capable of timely delivery and accurate compliance with GST invoicing processes. Keywords: tender in Visakhapatnam, BHEL procurement, electrical insulators, heater components.
Product/service names: strip heater for top hat furnace; rectangular ceramic insulators; cone-type insulators with lock nut; insulator for busbar support; ceramic insulators for heater protection
Quantities/values: not disclosed in BOQ
EMD/Value: not specified or disclosed
Experience: not specified; bidders should demonstrate capability in heavy electrical components
Compliance: GST invoicing against consignee GSTIN; vendor-code prerequisites
Option clause allows up to 25% quantity variation during contract and currency
GST payable as actuals or lower rate; invoicing aligned to consignee GSTIN
Delivery period adjustments with minimum 30 days; extension rules apply
GST reimbursement per actuals or lower rate; GST invoice upload with GST portal payment screenshot
Delivery period commences from last date of original delivery order; option quantities adjust delivery time with a minimum 30 days
Contract termination rights for failure to deliver or misrepresentation; scheme applies to partial/non-delivery
Demonstrated ability to supply electrical insulators and strip heaters relevant to heavy industry
GST registered with valid GSTIN; PAN card in the bidder’s name
Financial stability evidence and manufacturer authorization if OEM
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
STRIP HEATER FOR TOP HAT FURNACE , RECTANGULAR CERAMIC INSULATOR , CONE TYPE INSULATORS WITH LOCK NUT , INSULATOR FOR BUSBAR SUPPORT , CERAMIC INSULATORS FOR HEATER PROTECTION
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
STRIP HEATER FOR TOP HAT FURNACE
STRIP HEATER FOR TOP HAT FURNACE
RECTANGULAR CERAMIC INSULATOR
RECTANGULAR CERAMIC INSULATOR
CONE TYPE INSULATORS WITH LOCK NUT
CONE TYPE INSULATORS WITH LOCK NUT
INSULATOR FOR BUSBAR SUPPORT
INSULATOR FOR BUSBAR SUPPORT
CERAMIC INSULATORS FOR HEATER PROTECTION
CERAMIC INSULATORS FOR HEATER PROTECTION
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | STRIP HEATER FOR TOP HAT FURNACE | STRIP HEATER FOR TOP HAT FURNACE | 6 | pieces | bhel.hpvp.consignee3 | 84 | |
| 2 | RECTANGULAR CERAMIC INSULATOR | RECTANGULAR CERAMIC INSULATOR | 30 | pieces | bhel.hpvp.consignee3 | 84 | |
| 3 | CONE TYPE INSULATORS WITH LOCK NUT | CONE TYPE INSULATORS WITH LOCK NUT | 30 | pieces | bhel.hpvp.consignee3 | 84 | |
| 4 | INSULATOR FOR BUSBAR SUPPORT | INSULATOR FOR BUSBAR SUPPORT | 20 | pieces | bhel.hpvp.consignee3 | 84 | |
| 5 | CERAMIC INSULATORS FOR HEATER PROTECTION | CERAMIC INSULATORS FOR HEATER PROTECTION | 20 | pieces | bhel.hpvp.consignee3 | 84 |
PAN card copy
GSTIN certificate copy
Cancelled cheque copy
EFT mandate certificate certified by bank
GST invoice upload and GST payment screenshot (GeM portal)
Vendor code creation documents as per Terms
Any OEM authorization if applicable
Extended Deadline
14-Jan-2026, 3:00 pm
Opening Date
14-Jan-2026, 3:30 pm
Extended Deadline
06-Jan-2026, 5:00 pm
Opening Date
06-Jan-2026, 5:30 pm
Start
10-Apr-2026, 5:00 pm
End
11-Apr-2026, 5:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | DAK ENTERPRISES Under PMA | - | 28-12-2025 20:50:33 | |
| 2 | SKC SERVICES Under PMA | - | 01-01-2026 19:57:07 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | SKC SERVICES(MII)( MSE Social Category:OBC ) Under PMA | Item Categories : STRIP HEATER FOR TOP HAT FURNACE,RECTANGULAR CERAMIC INSULATOR,CONE TYPE INSULATORS WITH LOCK NUT,I | |
| L2 | DAK ENTERPRISES (MII) Under PMA | Item Categories : STRIP HEATER FOR TOP HAT FURNACE,RECTANGULAR CERAMIC INSULATOR,CONE TYPE INSULATORS WITH LOCK NUT,I |
Key insights about ANDHRA PRADESH tender market
Bidders must register on the GeM portal, submit PAN and GSTIN copies, cancelled cheque and EFT mandate, and ensure GST invoicing to the consignee GSTIN. Include OEM authorizations if applicable and prepare for the option clause allowing up to 25% quantity variation.
Required documents include PAN, GSTIN, cancelled cheque, EFT mandate certified by bank, GST invoice proof and GeM portal payment screenshot, plus OEM authorization if needed. Vendor code creation requires these items; ensure correct consignee GSTIN on invoices.
No explicit numerical specs are published; bidders should supply OEM-grade strip heaters and ceramic insulators, conforming to standard heavy electrical components. Ensure compatibility with top hat furnaces and busbar supports, and align with industry norms for insulation materials and locking nuts.
Delivery starts from the last date of the original delivery order. If the option clause is exercised, additional time equals (increased quantity / original quantity) × original delivery period, with a minimum of 30 days; extension possible up to the original delivery period.
Invoices must be raised in the consignee’s name with the consignee GSTIN. GST reimbursement will be as per actuals or applicable lower rates; document GST portal payment proof during submission to GeM.
Scope is strictly the supply of goods for strip heater and ceramic insulator components, with no on-site service or installation included; ensure timely delivery and comply with the vendor-code prerequisites.
Eligibility includes demonstrated capability to supply heavy electrical components, valid GST registration and PAN, financial stability evidence, and, if applicable, OEM authorizations. Adhere to delivery terms and option-quantity provisions to avoid contract termination.
The purchaser may increase or decrease quantity by up to 25% at contract placement or during currency. Delivery timelines adjust proportionally, with at least 30 days minimum extension; bidders must plan for variability in orders and maintain readiness.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS