Bid Publish Date
12-Feb-2025, 6:58 pm
Bid End Date
01-Mar-2025, 3:00 pm
Value
₹10,89,559
Location
Progress
RABharat Sanchar Nigam Limited Portal(bsnl) announces a tender for Supply of 3 TR Ductable type Inverter type Aircooled split AC unit, Installation Testing and Commissioning of 3 TR Ductable type Air cooled split AC unit, Providing and laying of refrigerant pipes and other works, Supplying and fixing of 25 mm dia of UPVC Pipe, providing and fixing of suspension round rods in CHITTOOR, ANDHRA PRADESH. Quantity: 282. Submission Deadline: 01-03-2025 15: 00: 00. Last date to apply is approaching fast!
Start
10-Apr-2025, 7:00 pm
End
12-Apr-2025, 9:00 pm
Duration: 50 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
282
Category
Supply of 3 TR Ductable type Inverter type Aircooled split AC unit
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
Min. Avg. Annual Turnover
4
Past Performance
80 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Supply of 3 TR Ductable type Inverter type Aircooled split AC unit , Installation Testing and Commissioning of 3 TR Ductable type Air cooled split AC unit , Providing and laying of refrigerant pipes and other works , Supplying and fixing of 25 mm dia of UPVC Pipe , providing and fixing of suspension round rods
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Supply of 3 TR Ductable type Inverter type Aircooled split AC unit
Supply of 3 TR Ductable Inverter type Aircooled split AC unit with scroll or rotary compressor single circuit refrigerant type with Not less than 36000 BTU per hr, having EER of Min 10 BTU per Watthour and Static pressure of min 45 Pascals, with copper coils evaporator and condenser as per specification as required Note Rate shall be quoted inclusive of GST
Installation Testing and Commissioning of 3 TR Ductable type Air cooled split AC unit
Installation, Testing & Commissioning ICT of 3 TR Ductable type Air cooled split AC unit as per specification including lifting and positioning of indoor and outdoor units, Pre-testing, vaccumisation, pressure testing with nitrogen, Supplying and charging of refrigerant gas, Supplying and Laying of power supply cable on surface or recess from outdoor unit to the nearby existing Supply Terminal Box as required Note Rate shall be quoted inclusive of GST
Providing and laying of refrigerant pipes and other works
Providing and laying of refrigerant connection with copper tubes of suitable gauge and sizes as per manufacturer recommendation for both suction and liquid lines on existing tray/ wall / partition including Supplying and Fixing of all required accessories such as bends elbows couplings including brazing, pressure testing, Providing and fixing suitable clamps supports and insulating the refrigerant lines with insulation hoses or with nitrile rubber sleeve wrapped with Thermal tape etc including Interconnection cabling between Indoor to Outdoor units complete as required. Note Rate shall be quoted inclusive of GST
Supplying and fixing of 25 mm dia of UPVC Pipe
Supplying and fixing of 25 mm dia of UPVC Pipe along with accessories on surface or recess including cutting the wall/partition and making good the same to drain condensate water etc., complete as required . Note Rate shall be quoted inclusive of GST
providing and fixing of suspension round rods
providing and fixing of suitable size MS rods for suspending the indoor units with anchor bolts in ceiling i/c providing double nuts on each suspension rod and making good damages etc., complete as required Note Rate shall be quoted inclusive of GST
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Supply of 3 TR Ductable type Inverter type Aircooled split AC unit | Supply of 3 TR Ductable Inverter type Aircooled split AC unit with scroll or rotary compressor single circuit refrigerant type with Not less than 36000 BTU per hr, having EER of Min 10 BTU per Watthour and Static pressure of min 45 Pascals, with copper coils evaporator and condenser as per specification as required Note Rate shall be quoted inclusive of GST | 7 | nos | [email protected] | 30 | |
| 2 | Installation Testing and Commissioning of 3 TR Ductable type Air cooled split AC unit | Installation, Testing & Commissioning ICT of 3 TR Ductable type Air cooled split AC unit as per specification including lifting and positioning of indoor and outdoor units, Pre-testing, vaccumisation, pressure testing with nitrogen, Supplying and charging of refrigerant gas, Supplying and Laying of power supply cable on surface or recess from outdoor unit to the nearby existing Supply Terminal Box as required Note Rate shall be quoted inclusive of GST | 7 | jobs | [email protected] | 30 | |
| 3 | Providing and laying of refrigerant pipes and other works | Providing and laying of refrigerant connection with copper tubes of suitable gauge and sizes as per manufacturer recommendation for both suction and liquid lines on existing tray/ wall / partition including Supplying and Fixing of all required accessories such as bends elbows couplings including brazing, pressure testing, Providing and fixing suitable clamps supports and insulating the refrigerant lines with insulation hoses or with nitrile rubber sleeve wrapped with Thermal tape etc including Interconnection cabling between Indoor to Outdoor units complete as required. Note Rate shall be quoted inclusive of GST | 120 | mtrs | [email protected] | 30 | |
| 4 | Supplying and fixing of 25 mm dia of UPVC Pipe | Supplying and fixing of 25 mm dia of UPVC Pipe along with accessories on surface or recess including cutting the wall/partition and making good the same to drain condensate water etc., complete as required . Note Rate shall be quoted inclusive of GST | 120 | mtrs | [email protected] | 30 | |
| 5 | providing and fixing of suspension round rods | providing and fixing of suitable size MS rods for suspending the indoor units with anchor bolts in ceiling i/c providing double nuts on each suspension rod and making good damages etc., complete as required Note Rate shall be quoted inclusive of GST | 28 | nos | [email protected] | 30 |
Extended Deadline
01-Mar-2025, 9:30 am
Opening Date
01-Mar-2025, 10:00 am
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about ANDHRA PRADESH tender market
The eligibility requirements include being a registered entity with valid documentation supporting experience and past performance. Moreover, bidders must showcase a minimum average annual turnover of 4 Lakh (INR) to qualify.
Bidders are required to submit several certificates including the OEM Authorization Certificate, compliance documents as per bid specifications, and any additional documents requested in the ATC (Additional Terms and Conditions). This ensures adherence to quality and specification standards during the bidding process.
The registration process involves creating an account on the official government portal, completing the necessary profiles, and submitting the required documentation proving eligibility. Bidders must ensure that all documents are valid and compliant with the tender requirements.
Accepted document formats typically include PDF, DOCX, and JPG, ensuring easy upload and processing. Bidders should adhere to the document submission guidelines detailed in the official tender.
Payment terms will be outlined in the contract following evaluation and awarding of the tender. Typically, payments involve milestone-based releases upon satisfactory completion of the installation and commissioning processes. Additional specifics are available prior to the final agreement post-selection.