Bid Publish Date
11-Aug-2026, 1:07 pm
Bid End Date
01-Sep-2026, 12:00 pm
EMD
₹40,000
Value
₹20,00,000
Location
Progress
N/a announces a tender for Solar Power Plant (Roof Top) for ONGRID System, Single Phase (Q3) in WEST DELHI, DELHI. Quantity: 1. Submission Deadline: 01-09-2026 12: 00: 00. Last date to apply is approaching fast!
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
10
OEM Avg. Turnover
20
Past Performance
50 %
Warranty Period
1 years
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Solar Power Plant (Roof Top) for ONGRID System, Single Phase (Q3)
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
14
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
South West
Delivery Pincodes
110078
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Hari Om Singh | 110078,NSIT, Sector-3, Dwarka, New Delhi-110078 | South West | Delhi | 110078 | 1 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | A Grid Tied Photo Voltaic (SPV) power plant consists of | SPV array, Module Mounting Structure, Power Conditioning Unit (PCU) consisting of Maximum Power Point Tracker (MPPT), Inverter, and Controls and Protections, interconnect cables and switches |
| GENERIC | PV Array Mounting | Mounted on a suitable structure |
| GENERIC | Grid Tied SPV System | Without battery and designed with necessary features to supplement the grid power during day time. |
| INVERTER | Rated output power of inverter (in KW) | 5 |
| INVERTER | Switching device | IGBT |
| INVERTER | Number of Phase | 1 |
| INVERTER | Inverter output wave form | Pure sine wave |
| INVERTER | Number of MPPT per inverter | 2 |
| INVERTER | Number of string at input side of inverter ( input port +ve and -ve) ( hint: 1 sets contains 1 +ve and 1 -ve port) | 2 set |
| INVERTER | Maximum power point tracker | Integrated in the PCU/inverter to maximize energy drawn from the array |
| INVERTER | Service condition | Outdoor |
| INVERTER | Ingress protection rating of inverter | IP 65 (for outdoor use) |
| INVERTER | Manual switch for disconnecting DC supply | Yes |
| INVERTER | Inverter mounting type | Wall Mounted |
| INVERTER OUTPUT | Overall Efficiency (in %) | >98 |
| DISPLAY FEATURES ON INVERTER | Type of display | LED |