Rigid GI Pipe (BHEL)
Indian Army
VARANASI, UTTAR PRADESH
Bid Publish Date
22-Dec-2025, 9:00 pm
Bid End Date
12-Jan-2026, 4:00 pm
EMD
₹8,000
Location
Progress
Quantity
94
Bid Type
Two Packet Bid
The opportunity is issued by the Urban Development Department, Chhattisgarh, for the procurement of Rigid GI Pipe (BHEL) in JANJGIR-CHAMPA, CHHATTISGARH 495549. The scope encompasses Supply, Installation, Testing, Commissioning of the goods, plus operator training and securing any required statutory clearances. The bid requires a minimum EMD of ₹8,000 and adherence to turnover criteria for both the bidder and the OEM. A strong emphasis is placed on past project experience and successful execution of similar supply/install/commissioning contracts. The BOQ shows no items listed, signaling a potentially composite or turnkey package with scope variations. Unique aspects include the integration of training and statutory compliance alongside hardware delivery. This tender targets bidders capable of end-to-end execution within the stated geography and regulatory framework, with a clear emphasis on capability proofs and financial stability.
Scope includes supply, installation, testing, commissioning of Rigid GI Pipe (BHEL) and operator training
EMD = ₹8,000
Turnover criteria: minimum average annual turnover for bidder and OEM as per bid document
Past experience proofs include contract copies with invoices or client execution certificates
No BOQ items listed; suggests turnkey or scope-based procurement
OEM turnover requirement applies to primary product in bunch bids
EMD of ₹8,000 must be submitted with bid
Bidder and OEM turnover criteria required with documentary proof
Past project experience proofs acceptable as contract/invoice-based evidence
Turnkey scope including training and statutory clearances if applicable
Not specified in available data; bidders should verify in terms document
Not specified; however scope includes supply, installation, testing, commissioning
Not specified in provided data; check buyer terms for LD and penalties
Minimum average turnover as per bid document for bidder and OEM
Evidence of past experience in supply and installation/commissioning
Authorized OEM certification or authorizations if bidding through reseller
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
VARANASI, UTTAR PRADESH
Urban Administration And Devlopment
DEWAS, MADHYA PRADESH
N/a
SOUTH DELHI, DELHI
N/a
SOUTH DELHI, DELHI
N/a
Tender Results
Loading results...
GST registration certificate
PAN card
Audited financial statements for turnover proof or CA certificate
Past project experience documents (contracts, invoices, execution certificates)
OEM authorization letter (if bidding via reseller)
Technical bid documents or compliance certificates (if required)
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ASHISH KUMAR SAO Under PMA | Make : NA Model : GI pipe 20 mm | 08-01-2026 14:30:10 | Qualified |
| 2 | Gayatri Enterprises Under PMA | Make : NA Model : GI pipe 20 mm | 01-01-2026 15:05:36 | Qualified |
| 3 | MAHAMAYA TRADERS Under PMA | Make : NA Model : GI pipe 20 mm | 03-01-2026 16:32:55 | Qualified |
| 4 | MANISH CONSTRUCTION AND GENERAL ORDER SUPPLIER Under PMA | Make : NA Model : G.I. Double side Thread Rigid GI pipe | 11-01-2026 16:15:00 | Disqualified |
| 5 | SAHU GLOBAL STTS Under PMA | Make : NA Model : ROYAL | 11-01-2026 16:52:34 | Disqualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | Gayatri Enterprises Under PMA | ₹7,99,940 | Item Categories : Rigid GI Pipe (BHEL) |
| L2 | MAHAMAYA TRADERS Under PMA | ₹8,13,100 | Item Categories : Rigid GI Pipe (BHEL) |
| L3 | ASHISH KUMAR SAO Under PMA | ₹8,93,000 | Item Categories : Rigid GI Pipe (BHEL) |
Please sign in or create an account to view contract details and download result documents.
Key insights about CHHATTISGARH tender market
Bidders must meet the turnover criteria for both bidder and OEM, provide EMD of ₹8,000, and submit past project experience proofs (contracts, invoices or execution certificates). The scope includes supply, installation, testing, commissioning, and operator training, with compliance to any statutory clearances. Ensure a turnkey price and document readiness per Terms and Conditions.
Submit GST certificate, PAN, audited financials or CA certificate showing turnover, past contracts with client certificates or invoices, OEM authorization if bidding via reseller, and technical/compliance documents. Ensure EMD computation is included and bid price covers all components as per scope.
Bidder must meet the specified average annual turnover over the last 3–4 years; OEM turnover must meet the same criterion. If the company is <3 years old, turnover is calculated from completed years after incorporation. Documentary evidence such as audited statements or CA certificates is required.
Scope includes supply, installation, testing, commissioning of GI pipes, plus operator training and provisions for any statutory clearances required by the project. Price to include all cost components; no separate BOQ items are listed in the available data.
Payment terms are not explicitly specified in the provided data. Bidders should verify the exact terms in the final Tender Conditions. Typically, such orders may involve milestone payments on commissioning and acceptance alongside warranty or service terms.
Acceptable proofs include contract copies with invoices and bidder self-certification, client execution certificates, and third-party notes like inspection release reports. These documents must demonstrate successful supply and/or installation/commissioning of similar products.
Statutory clearances are included in the scope if required by project planning and compliance. Bidders should anticipate possible regulatory approvals and prepare documentation to support clearance processes, aligning with supplier responsibilities and local regulations.
The BOQ shows zero items listed in the available data, indicating a turnkey or scope-based procurement rather than itemized quantities. Bidders should prepare a comprehensive proposal covering supply, installation, testing, commissioning, training, and compliance costs.
Sign up now to access all documents
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS