TenderDekho Logo
Closed GEM

India Optel Limited light instrument tender Dehradun Uttarakhand 2026 ISI/ISO compliant

Bid Publish Date

19-Sep-2026, 10:21 am

Bid End Date

10-Oct-2026, 11:00 am

Generate Docs

Progress

Issue19-Sep-2026, 10:21 am
Corrigendum10-Oct-2026
AwardPending

Key Highlights

  • • Explicit requirement for PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate for vendor-code creation
  • • Data Sheet must precisely match product specifications; potential bid rejection for mismatches
  • • Offline registration form and empanelment prior to bid opening; formal approval required
  • • Invoices must be raised in the consignee name with the consignee's GSTIN only

Tender Overview

Organization: India Optel Limited, under the Department Of Defence Production, seeks delivery of LIGHT INSTRUMENT for DRG. NO. IRDE-1129, MCT-3056 (COMPLETE) WO. 38421, for SUC-102B/SUC-1, in Dehradun, Uttarakhand 248001. No BOQ items listed; data sheet must align with offered product; data sheet mismatch may lead to bid rejection. Bidders must register with the offline authority via the Addendum form prior to bid opening. GST applicability is bidder’s responsibility with reimbursement as per actuals or applicable rate, capped at quoted GST. Invoices must be raised in the consignee name with the consignee GSTIN. The contract allows termination for non-compliance or delivery failure. Delivery/installation details are to be carried out at the Chief General Manager, Ordinance Factory, Raipur, Dehradun.

Technical Specifications & Requirements

  • Data Sheet of offered product to be uploaded and cross-verified against technical parameters.
  • Registration/Empanelment: bidder must be registered/empanelled with the designated authority before bid opening; offline form completes this requirement.
  • Documentation: provide PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate certified by bank for vendor code creation.
  • Invoicing: invoice must reflect consignee name and GSTIN of the consignee only.
  • Sub-contracting/assignment restrictions: no unilateral assignment or subcontracting without prior written consent; joint and several liability retained.
  • Termination rights available to buyer for material non-delivery or non-compliance.

Terms, Conditions & Eligibility

  • GST: bidder must determine applicability; reimbursement capped to actuals or statutory rate, whichever is lower.
  • Data Sheet verification: mismatch risk; ensure exact specification alignment with offered product.
  • Data submission: mandatory Data Sheet upload with bid; ensure offline registration completed before bid opening.
  • Payment/Delivery: delivery/installation (if within scope) to the Chief General Manager, ORD. FACTORY, RAIPUR, Dehradun; payment terms not explicitly stated.
  • Compliance: no assignment or subcontracting without buyer consent; supplier remains liable for performance.

Key Specifications

  • Product: LIGHT INSTRUMENT for DRG. NO. IRDE-1129, MCT-3056 (COMPLETE) WO. 38421

  • Location: Dehradun, Uttarakhand 248001

  • Data Sheet: mandatory upload and matching with technical parameters

  • Standards: Not specified in data; alignment with offered product is required

  • Delivery/Installation: at ORDnce Factory Raipur, Dehradun

  • Invoicing: in consignee name with consignee GSTIN only

Terms & Conditions

  • EMD/advance details not provided; ensure vendor code prerequisites are met

  • GST implications must be calculated by bidder; reimbursement capped to actuals or lower rate

  • Registration/empanelment required before bid opening; offline form submission

Important Clauses

Payment Terms

GST payable by bidder; reimbursement only to actuals or applicable rate, whichever is lower; invoicing in consignee name with consignee GSTIN

Delivery Schedule

Delivery/Installation at ORDnANCE FACTORY RAIPUR, Dehradun; terms not explicitly stated

Penalties/Liquidated Damages

Buyer may terminate for material non-compliance or failure to deliver; liability remains with seller

Bidder Eligibility

  • Registered/empanelled with the designated registration authority prior to bid opening

  • Submit PAN, GSTIN, Cancelled Cheque, EFT Mandate for vendor-code creation

  • Data Sheet accompanying bid; alignment with technical parameters

Advertisement

Authority & Contact

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

88

Bid Type

Two Packet Bid

Bid Validity

155 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

Yes

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Warranty Period

1 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

7406001005 LIGHT INSTRUMENT TO DRG. NO. IRDE-1129, MCT-3056(COMPLETE) , WO. 38421. FOR SUC-102B FOR SUC-1

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

120

Delivery Locations

1

Delivery Cities

DEHRADUN

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-DEHRADUNDEHRADUN--88120-

Authority Records

MINISTRY OF DEFENCEDEFENCE PRODUCTION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 11

GeM-Bidding-9910660.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Corrigendum Updates

1 Update
#1

Update

10-Oct-2026

Extended Deadline

16-Oct-2026, 5:30 am

Opening Date

17-Oct-2026, 5:30 am

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Copy of Cancelled Cheque

4

Copy of EFT Mandate certified by Bank

5

Data Sheet of offered product

6

Vendor code creation documents (GST, PAN, bank details)

7

Offline registration/empanelment form before bid opening

Frequently Asked Questions

Key insights about UTTARAKHAND tender market

How to bid for light instrument tender in Dehradun Uttarakhand 2026?

Bidders must register offline before bid opening, submit PAN, GSTIN, cancelled cheque, and bank-authenticated EFT mandate. Upload the mandatory Data Sheet that matches offered specifications for the DRG. NO. IRDE-1129/MCT-3056 WO 38421. Ensure consignee GSTIN appears on invoice and comply with termination conditions.

What documents are required for India Optel Limited supplier registration?

Submit PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate certified by bank. Include Data Sheet of offered product and offline registration form. These enable vendor-code creation and eligibility for the deployment at ORDENCE FACTORY RAIPUR, Dehradun.

What are the invoicing requirements for the Dehradun light instrument tender?

Invoices must be raised in the consignee name with the consignee’s GSTIN only. Ensure the data sheet aligns with the product, and the supply meets delivery/installation conditions at ORDnANCE FACTORY RAIPUR, Dehradun, Uttarakhand.

What happens if the data sheet mismatches the offered product?

A mismatch may cause bid rejection; bidders must ensure the Data Sheet exactly reflects the technical parameters of the DRG-1129/MCT-3056 WO-38421 item and cross-check with the BOQ/offer before submission.

What are the termination grounds for this India Optel Limited tender?

Buyer may terminate for material non-compliance, failure to deliver within the stipulated period, or failure to replace/rectify defective material promptly. The seller remains liable for performance under the contract.

What are the GST considerations for this Dehradun procurement?

Bidder bears GST applicability; reimbursement available at actuals or applicable rate, whichever is lower, limited to the quoted GST. Ensure GSTIN on invoices and alignment with consignee GSTIN.

Is there a BOQ for this light instrument tender in Uttarakhand 2026?

No BOQ items are listed in the tender data; emphasis is on Data Sheet accuracy and compliance with DRG-1129/MCT-3056 WO-38421 specifications; ensure offline registration is completed before bid opening.

What is the delivery location for the offered light instrument?

Delivery/installation is to the Chief General Manager, ORDANCE FACTORY RAIPUR in Dehradun, Uttarakhand; ensure all logistics align with the specified address and verification of Data Sheet against the offered product.