TenderDekho Logo
GEM

Indian Army Department Of Military Affairs Rewind & Allied Components Tender Jammu 2026 - ISOs, OEM Authorisation, GST Compliance & Turnover 3-Year

Bid Publish Date

09-Jul-2026, 10:44 am

Bid End Date

21-Jul-2026, 11:00 am

Progress

Issue09-Jul-2026, 10:44 am
Corrigendum09-Jul-2026
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

639

Category

Rewind of submersible motor 7.5 HP

Bid Type

Two Packet Bid

Categories 163

AGITATORS SIMPLEX PUMPS WORM PUMPS PIPE AND TUBE FITTINGS ELECTRICAL WIND MILL ENERGY PROJECT APPARELS PLATFORM SCALE UG CABLE IMPELLERS ANIMAL WATERING MACHINES APFC PANEL POLYETHYLENE PIPE AXLE ALTERNATOR BUILDING CONSTRUCTION WATER STORAGE TANK PAINTING PLUMBING WORK RING COOLING FAN FASTENER WOODEN TROLLEY POWER CABLE PTFE WIRE MOSQUITO REPELLENT AIR CYLINDERS BORE WELL CONTROL WIRE PERISTALTIC PUMPS ARNO STARTING CONTACTOR SEALLESS PUMPS BEARINGS WIRING ASSEMBLY LABORATORY WATER PURIFICATION EQUIPMENT WHEAT FLOUR AMPS DIRECT TRANSFORMER ELECTROCARDIOGRAPHY UNITS DISTILLATION HARDWARE AND FASTENERS GEYSER CR PANEL FERROUS ALLOY SUPPLY AGRICULTURAL PUMP STRIP WOODEN PRODUCT XLPE CABLE LIGHTENING PROTECTION DEVICE PUMP SPARE PARTS SOIL EARTH SNG CLOTHING FLANGE BLOOD PRESSURE MEASURING INSTRUMENT ACCESSORIES SYNCHRONOUS MOTORS CABLE JOINTING KIT DEEPWELL PUMPS COPPER SHEET IRRIGATION PUMPS MILITARY VEHICLE WATER SUPPLY WINDING MACHINE PANEL STOMACHERS CONDUCTOR PUMPS ELASTROMERIC PIPE SLUDGE PUMPS POWER STETHOSCOPE WATER PURIFIER AND RO PLANT BUS TERMINAL WATER TANK CENTRIFUGAL MACHINE AC PIPES ELECTRICAL BOARD WATER STORAGE AND SUPPLY COILED CABLE GINNING OIL SWITCH GEAR FLUID MECHANICS EQUIPMENT CEMENT FITMENT LFH CABLE EARTH AND STONE ELECTRODES ALUMINIUM PROFILE ROTATING PISTON PUMPS BEARING HOLDERS COUPLERS ALTERNATING CURRENT MOTOR RF PASSIVE COMPONENTS AWM WIRE BASSES BOLTS ROTARY CAM PUMPS WASHERS HYDRAULIC MACHINES POWER WIRE AC MOTORS TECHNICAL SERVICES NUTS DRINKING WATER SYSTEM TUBE OIL PUMP WATER LEVEL RECORDER SANITARY FITTING WATER SUPPLY MATERIAL WHEEL DOZER CENTRIFUGAL COMPRESSORS FUEL PUMP FUME HOODS ELECTRONIC COMPONENTS AND SUPPLIES WORM GEAR TURBINE PUMPS BULLDOZER STEAM PUMPS VACUUM CENTRIFUGES EXHAUST SYSTEM FILLING RAIN CUT FLUORESCENT LAMP OVER HEAD TANK DREDGE PUMPS FIBERS THREADS AND YARNS INDUCTION MOTORS TUBES AND PIPES COMPLETION EQUIPMENTS BARE CABLE PROGRESSIVE CAVITY PUMPS BACKHOE TRANSITION METALS CABLE AXIAL SPLIT PUMPS OVERHEAD STIRRERS SOLAR WATER HEATER FABRICATOR SLEEVE STARTER SANITARY PUMPS MACHINE SUBMERSIBLE PUMP VALVE PARTS AND ACCESSORIES CABLE SPLICING KITS EXCAVATION ESCRAP LABORATORY VIBRATORS AUTOMOTIVE CABLE BUNDI LOW TENSION PANEL PEB PIPES RIBBON CABLE UPVC PIPE WATER PUMP PUMPING MACHINEY WATERING FACILITY METAL PRODUCTS TEST TUBE CAPS EARTH MOVING TEE BUSH BARREL LABOUR

Tender Overview

The opportunity is with the Indian Army under the Department of Military Affairs for a comprehensive procurement package encompassing rewind of submersible motors (7.5 HP), 4 Sqmm 3-core cables, gearbox and bearing components, seals, sleeves, nuts, bolts, washers, gaskets, painting of pump sets, MS column pipes, and related labour services. The scope includes material supply, installation, testing, commissioning, and ongoing maintenance support including day-to-day emergency attendances. The work location is specified as the Garrison Engineer (Air Force), Jammu, J&K with delivery terms aligned to this address. The quantity and value are not disclosed; BOQ lists 39 items without unit details. A notable clause permits quantity variation up to 25% during both initial and extended periods, with delivery timelines tied to the last delivery order. Unique contracting terms emphasize GST considerations and turnover prerequisites.

  • Organization: Indian Army, Department of Military Affairs

  • Product/Service: Rewind and rehabilitation components for submersible pumps, related labour and installation services

  • Location: Jammu, J&K (Garrison Engineer, Air Force)

  • Estimated value: Not disclosed; EMD not listed

  • Delivery scope: Supply, installation, testing, commissioning, and after-hours maintenance

  • Key differentiator: Option clause enabling up to 25% quantity increase/decrease and extended delivery timelines

  • Context: Comprehensive repair and replacement package for critical pump systems in a defence setup

    Technical Specifications & Requirements

    • Scope: Supply Installation Testing and Commissioning of goods
    • Items listed: 39 line items (varied components including motors, cables, bearings, seals, sleeves, fasteners, and related hardware); detailed BOQ not provided
    • Delivery address: Garrison Engineer (Air Force), Jammu, J&K 180003
    • GST: Bidder to determine GST applicability; reimbursement as per actuals up to quoted rate
    • Turnover: Minimum average annual turnover required over the last 3 years as specified in the bid document (not disclosed here)
    • OEM/Importer: Imported products require OEM authorization with Indian registered office for after-sales support
    • Scope of supply: Includes labour for removal, relining, wiring, testing, commissioning, and day-to-day emergency handling
    • Special terms: Option clause allows +/- 25% quantity adjustment; minimum delivery time aligned to delivery orders; not-to-be-declared end-of-life products

    Terms, Conditions & Eligibility

    • EMD: Amount not disclosed in available data; bidders must comply with standard EMD submission practices
    • Eligibility: Bidder must have clean financial standing (not under liquidation or bankruptcy) and adequate turnover per bid requirements
    • Delivery: Delivery period as per original and extended periods; extensions calculated as (increased quantity / original quantity) × original delivery period, with a minimum of 30 days
    • GST: GST to be paid on actuals or as per applicable rate, whichever is lower
    • Documentation: GST certificate, PAN, audited financials or CA certificate showing turnover, OEM authorization (if applicable), and technical bid documents
    • Warranty/Support: Not explicitly stated; emphasis on after-sales service and day-to-day emergency response
    • Payment terms: Not specified in available data; standard government terms would apply per supply, installation, testing & commissioning

Key Specifications

  • Product/Service names: submersible pump rewind components, 7.5 HP motors, 4 Sqmm 3-core cables, associated bearings, seals, sleeves, nuts, bolts, washers

  • Quantities: 39 BOQ items (exact quantities not disclosed)

  • EMD/Estimated value: not disclosed in available data

  • Experience: turnover and prior project experience required as per bid document (details not provided)

  • Quality/Compliance: OEM authorization for imported items; GST compliance as per actuals

Terms & Conditions

  • Option clause allows +/- 25% quantity variation at contract placement and during currency

  • Delivery at Garrison Engineer (Air Force) Jammu; delivery period linked to delivery orders

  • GST to be reimbursed at actuals or quoted rate, whichever is lower

Important Clauses

Payment Terms

Not explicitly stated; payment terms follow standard government procurement norms for supply, installation, testing & commissioning

Delivery Schedule

Delivery timelines commence from the last date of the original delivery order; extended time calculated with minimum 30 days

Penalties/Liquidated Damages

Not explicitly specified in data; standard LDs and penalties typically apply for delays in defence contracts

Bidder Eligibility

  • Not under liquidation, court receivership, or bankruptcy

  • Minimum turnover as per bid document (3-year average; exact figure not disclosed)

  • OEM authorization required for imported items with registered Indian office for after-sales support

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Rewind of submersible motor 7.5 HP , Sub cable 4 Sqmm 3 core complete. , GM Bearing Bush , Water Seal , Cable Seal , Revolving Disc , Sand Guard , DOL Bush , DOL Sleave , SS Distance sleeve , Rottar sleeve turning and grinding , Coupling key , Impellar Key , T nut , Guide bush , GM Neck ring , Nut bolts with washer , Rubber packing flange of size 150 mm , Cable jointing kit , Painting of submersible pump set , MS column pipe 100 mm dia medium grade , Labour charges for taking out and relowering , Labour charges for opening cutting rewinding , Supply installation testing and commissioning , Material and labour for making , Attending day to day emergency breakdowns , Attending day to day emergency breakdowns complaints of damaged , Material and Labour PCC 1 , Supply and fixing Rotational moulded , Material and labour for disconnecting , Supply only anti friction heavy duty , Material and Labour for removing SWT column pipes , Material and Labour for Earthing , Supply laying 50 mm bore steel water , Supply and fixing in replacement , Excavation in trenches not , Returning filling in including spreading leveling , Removing excavated soil to a distance

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

2

Pre-Bid & Qualification

Pre-Bid Date

09-07-2026 10:00:00

Pre-Bid Venue

GARRISON ENGINEER (AIR FORCE) JAMMU, J&K-180003 CONT NO 9697030227

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Jammu

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-JammuJammu--145-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9551425.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 39 Items Sign in for GEM prices

#1

Rewind of submersible motor 7.5 HP

Rewind of submersible motor 7.5 HP

1 jobs Delivery: 45 days
#2

Sub cable 4 Sqmm 3 core complete.

Sub cable 4 Sqmm 3 core complete.

60 rm Delivery: 45 days
#3

GM Bearing Bush

GM Bearing Bush

4 nos Delivery: 45 days
#4

Water Seal

Water Seal

2 nos Delivery: 45 days
#5

Cable Seal

Cable Seal

2 nos Delivery: 45 days
#6

Revolving Disc

Revolving Disc

1 nos Delivery: 45 days
#7

Sand Guard

Sand Guard

1 nos Delivery: 45 days
#8

DOL Bush

DOL Bush

1 nos Delivery: 45 days
#9

DOL Sleave

DOL Sleave

1 set Delivery: 45 days
#10

SS Distance sleeve

SS Distance sleeve

8 nos Delivery: 45 days
#11

Rottar sleeve turning and grinding

Rottar sleeve turning and grinding

1 nos Delivery: 45 days
#12

Coupling key

Coupling key

1 nos Delivery: 45 days
#13

Impellar Key

Impellar Key

8 nos Delivery: 45 days
#14

T nut

T nut

12 nos Delivery: 45 days
#15

Guide bush

Guide bush

8 set Delivery: 45 days
#16

GM Neck ring

GM Neck ring

8 nos Delivery: 45 days
#17

Nut bolts with washer

Nut bolts with washer 1 by 2 x 2 inch

24 nos Delivery: 45 days
#18

Rubber packing flange of size 150 mm

Rubber packing flange of size 150 mm

6 nos Delivery: 45 days
#19

Cable jointing kit

Cable jointing kit

2 nos Delivery: 45 days
#20

Painting of submersible pump set

Painting of submersible pump set

2 nos Delivery: 45 days
#21

MS column pipe 100 mm dia medium grade

MS column pipe 100 mm dia medium grade of 3 mtr in length

5 nos Delivery: 45 days
#22

Labour charges for taking out and relowering

Labour charges for taking out and relowering the sub pump set from bore well

1 jobs Delivery: 45 days
#23

Labour charges for opening cutting rewinding

Labour charges for opening cutting rewinding cleaning complete the sub pump for repairing and refixing the same after repairing, assembling testing complete

1 jobs Delivery: 45 days
#24

Supply installation testing and commissioning

Supply installation testing and commissioning in repairs of SATHYA SAI DOSING DRUM adjustable dozing pump including fixing complete

1 nos Delivery: 45 days
#25

Material and labour for making

Material and labour for making 100 percentage serviceable to the AMF LT PANEL startor suitable for Motors and Submersible pump by tracing out defects and replacing unsv parts including control wiring complete. minor parts such as nuts, bolts, washers, thimbles etc shall be deemed to be included in the quoted rate.

1 nos Delivery: 45 days
#26

Attending day to day emergency breakdowns

Attending day to day emergency breakdowns complaints of damaged water supply lines of 15 to 25mm bore in distribution system and restoration of water supply by stopping the leakage occured by deputing skilled semi skilled man power for smooth functioning of water supply.

45 job Delivery: 45 days
#27

Attending day to day emergency breakdowns complaints of damaged

Attending day to day emergency breakdowns complaints of damaged water supply lines of 40mm to 50mm bore in distribution system and restoration of water supply by stopping the leakage occured by deputing skilled semi skilled man power for smooth functioning of water supply

35 job Delivery: 45 days
#28

Attending day to day emergency breakdowns

Attending day to day emergency breakdowns complaints of damaged water supply lines of 80mm to 150mm bore in distribution system and restoration of water supply by stopping the leakage occured by deputing skilled semi skilled man power for smooth functioning of water supply

50 job Delivery: 45 days
#29

Material and Labour PCC 1

Material and Labour PCC 1 ration 3 ratio 6 type C1 using 20 mm graded stone aggregate for platform of motor and water storage tank size 1.5 x 1.5 x 0.4m etc incl fair finishing the exposed surfaces even and smooth without using extra cement including necessary form work complete.

1 cum Delivery: 45 days
#30

Supply and fixing Rotational moulded

Supply and fixing Rotational moulded polyethylene water storage tank inner and out white five layers ISI marked cylinderical vertical with closed top hoisted with threaded cap and fixed of capacity 2000 liters each including all accessories including taking down of old broken water tank complete.

1 each Delivery: 45 days
#31

Material and labour for disconnecting

Material and labour for disconnecting and removing the Squirrel cage 3 phase 415 Volts 50 Hz Induction motor of 7.5 HP capacity from its foundations by disconnecting electrical connections and motor couplers taking it to workshop for repair and dismantling and opening up of MOTOR removing burnt out winding wires complete cleaning startor and rotor assembly

1 each job Delivery: 45 days
#32

Supply only anti friction heavy duty

Supply only anti friction heavy duty bearings suitable for 7.5 HP.

2 each Delivery: 45 days
#33

Material and Labour for removing SWT column pipes

Material and Labour for removing SWT column pipes upto 100 mm dia with submersible flat cable of any type and dismantling and taking up down SUBMERSIBLE PUMP and Motor ASSEMBLY of capacity 7.5 HP shifting to workshop and removing unserviceable spares replacing with new spares such impeller bushes distance bush seal etc of same specifications type model. removing burnt copper winding from motor and rewinding with same guage and type of insulation copper conductor winding wires and insulation sheets assembling back and testing for proper function including necessary machining works as required bringing back and reinstalling into the SWT complete.

1 each job Delivery: 45 days
#34

Material and Labour for Earthing

Material and Labour for Earthing in repalcement complete with galvanised steel earth plate electrode 60 cm x 60 cm x 6.0mm thick buried directly in ground Earth pit not less than 2.25 mtr deep below ground level with top edge of plate not less than 1.5 mtr below normal ground level connected to and including 25 x 4 mm galvanised earth strip by means of bolts nuts check nuts and washers of galvanised standard iron or steel all as specified or indicated in electrical

2 each job Delivery: 45 days
#35

Supply laying 50 mm bore steel water

Supply laying 50 mm bore steel water tubing medium grade galvanised with all fittings including short lengths laid in trenches complete with all fittings such as bends elbows Tee short pieces connectors back nuts diminishing pieces caps and plugs unions etc including taking down old unsv pipe any type complete

240 rm Delivery: 45 days
#36

Supply and fixing in replacement

Supply and fixing in replacement direct on line starter in sheet metal enclosure for motor rating 415 Volts 3 phase 50 Hz 9-14 Amps relay maximum range of capacity 7.5 HP complete

1 each Delivery: 45 days
#37

Excavation in trenches not

Excavation in trenches not exc. 1.5m wide and not exc. 1.5m in depth for foundation etc or for shafts wells cesspits manholes pier holes etc not exc. 10sqm on plan and not exc 1.5m in depth and getting out in soft loose soil complete

49 cum Delivery: 45 days
#38

Returning filling in including spreading leveling

Returning filling in including spreading leveling watering and well ramming in layer not exceeding 25 cms thick after laying and testing of cable complete

41 cum Delivery: 45 days
#39

Removing excavated soil to a distance

Removing excavated soil to a distance not exc. 50m and depositing where directed at a level not exc. 1.5m above starting point complete

8 cum Delivery: 45 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Audited financial statements or CA certificate indicating turnover for the last 3 years

4

OEM authorization/authorized distributor certificate (for imported products)

5

Technical bid documents demonstrating compliance with scope

6

Experience certificates for similar rehabilitation/repair works

7

Proof of non-liquidity (undertaking if applicable)

8

Any other statutory registrations (as required by T&C)

Corrigendum Updates

1 Update
#1

Update

09-Jul-2026

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid for the Indian Army pump components tender in Jammu?

To bid, prepare GST, PAN, and 3-year turnover proof, plus OEM authorization for imported parts. Include technical bid detailing scope, 39 BOQ items, and labour for installation and commissioning. Ensure compliance with the option clause allowing ±25% quantity changes and deliver to Jammu address.

What documents are required for the Jammu pump tender submission?

Submit GST certificate, PAN, audited financials or CA turnover certificate for 3 years, OEM authorization if importing, technical bid, and experience certificates for similar work. Include any bid-specific undertakings on financial health and non-liquidity per terms.

What are the delivery requirements for the Garrison Engineer Jammu contract?

Delivery must be to the Garrison Engineer (Air Force), Jammu, with timelines tied to the last delivery order. The option clause permits up to 25% quantity variation, and extended delivery time is calculated with a minimum of 30 days.

What standards or certifications are required for imported pump components?

Imported items must have OEM authorization and India-based after-sales support. While ISI/IS 550 compliance is referenced in keywords, confirm exact standards in the bid document and ensure vendors provide product certification from the OEM.

How is GST handled in this defence procurement tender in Jammu?

GST is not included in the base price; reimbursement is allowed on actuals or the applicable rate, whichever is lower, limited to the quoted GST percentage. Ensure GST registration and proper invoicing for reimbursement.

What is the scope of work for the pump rehabilitation package in this tender?

Scope includes rewind components, supply of spare parts (bearing, seals, sleeves, fasteners), painting of pump sets, MS column pipes, and related labour for removal, relining, installation, testing, commissioning, and emergency maintenance.

What is the minimum turnover requirement for bidders in the Jammu tender?

The minimum average annual turnover must be demonstrated over the last three financial years as per the bid document. Bidders should provide audited balance sheets or CA certificates to substantiate turnover figures.

Are there penalties for delivery delays under this Indian Army tender?

Penalties are not explicitly stated in the available data; however, standard defence contracts typically apply LDs for delays. Ensure adherence to the original delivery period and any extended period calculations defined by the option clause.