Advance Technical Training Center invites bids for essential networking infrastructure including Layer 2 access switches, Cat 6 UTP Ethernet cabling for WLAN, Cat 6 patch panels, fiber optic patch cords, and server racks. The procurement scope emphasizes 1G/10G copper ports, uplink SFP/SFP+ ports, multi-gigabit support, redundant power from day one, on-site OEM warranty, and console access. Location is Sikkim and the project encompasses multiple high-performance network components, with an emphasis on interoperability, scalability, and compliant cabling infrastructure. The tender requires complete supply, installation, testing, and commissioning as a single inclusive scope. A unique clause allows quantity adjustments up to 25% during contract execution, with delivery timelines tied to the original delivery period. The overall objective is a cohesive, ready-to-deploy network stack supporting indoor Wi-Fi backhaul and rack-based deployments.
Technical Specifications & Requirements
- Type of Switch: Layer 2 access switch
- Technology: Multi-Gigabit capable with 1G/10G copper ports and 1G/10G SFP uplinks
- Ports: Number of 1G Copper Ports, Number of 10G Copper Ports, Number of 1 G SFP Port (Uplink), Number of 10 G SFP+ Port (Uplink)
- Key features: Multi-Gigabit Support, Redundant Power supply from day one, Console Port, Switching Capacity Non-Blocking (Gbps), Throughput (MPPS), Dedicated Stacking Port/Slot from day one, Stacking Bandwidth (Gbps)
- Warranty: On-site OEM warranty; patch panel compatibility with Category 6 UTP
- Construction/Hardware: Patch panel material and RJ-45 modular fittings; cable management and dust protection; patch panel port count and RJ-45 compatibility; fiber and copper cable specifications; chassis/rack compatibility and sizing details
- Other specs: Environmental ratings, conductor details, jacket materials, cord length, connector types, and applicable standards notated in tender text
Terms, Conditions & Eligibility
- Option Clause: Purchaser may increase/decrease quantity by up to 25% during both initial and currency periods; delivery time adjusts using formula with a minimum of 30 days; extended periods may be applied.
- Scope: Scope deemed fully inclusive of all activities for supply, installation, testing, and commissioning as per tender specs.
- Delivery: Delivery periods governed by original delivery schedule; additional time rules apply if option clause exercised.
- Documents: Submit complete bid along with installation and commissioning readiness; OEM authorizations and warranty certificates may be required.
- Warranty/Support: On-site OEM warranty indicated; post-installation support terms to be aligned with OEM policies.
- Notes: All terms to be interpreted as per Buyer Added Terms and Conditions; compliance with installation, testing, and commissioning requirements is mandatory.