TenderDekho Logo
Active GEM

Invitation to Bid - Switch Socket combination 3 5 Pin 6 Amp,Switch Socket combination 3 5 Pin 16 Amp,LED Bulb 12 W,LED in BARAMULLA, JAMMU & KASHMIR

Bid Publish Date

21-Aug-2026, 8:29 pm

Bid End Date

03-Sep-2026, 9:00 pm

Value

₹49,000

Generate Docs

Progress

Issue21-Aug-2026, 8:29 pm
Corrigendum31-Aug-2026
AwardPending

Public procurement opportunity for Indian Army Switch Socket combination 3 5 Pin 6 Amp, Switch Socket combination 3 5 Pin 16 Amp, LED Bulb 12 W, LED Tube light fitting 1 x 18W 4 feet long complete with all accessories including LED tube rod, MCB 16 Amps SP, MCB 20 Amp sp, Socket 3 pin 5 6 Amps, PBS Roll, Acrylic Sheet 6 ft x 4ft 4mm, PVC Insulated Cable 1. 5 Sqmm Single Core Copper Conductor, Cornet set, Modular Switch one way 6 Amp, PVC Insulation tape 2 cm wide 10 mtr long, Rotational moulded polyethylene water storage tank double layer 500 ltr capacity, Looking Mirror 3 ft x 2 ft, Playwood 6 ft x 3 ft, Vitreous china wash Hand Basin WHB white flat back size 550x400 mm, CGI sheet 10 ft long, PVC bib tab 15mm, Wooden Rails in BARAMULLA, JAMMU & KASHMIR. Quantity: 180 issued by. Submission Deadline: 03-09-2026 21: 00: 00. View full details and respond.

Tender Data

Bid Details

Quantity

180

Category

LED Tube light fitting 1 x 18W 4 feet long complete with all accessories including LED tube rod

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

80 %

Warranty Period

3 years

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Switch Socket combination 3 5 Pin 6 Amp , Switch Socket combination 3 5 Pin 16 Amp , LED Bulb 12 W , LED Tube light fitting 1 x 18W 4 feet long complete with all accessories including LED tube rod , MCB 16 Amps SP , MCB 20 Amp sp , Socket 3 pin 5 6 Amps , PBS Roll , Acrylic Sheet 6 ft x 4ft 4mm , PVC Insulated Cable 1.5 Sqmm Single Core Copper Conductor , Cornet set , Modular Switch one way 6 Amp , PVC Insulation tape 2 cm wide 10 mtr long , Rotational moulded polyethylene water storage tank double layer 500 ltr capacity , Looking Mirror 3 ft x 2 ft , Playwood 6 ft x 3 ft , Vitreous china wash Hand Basin WHB white flat back size 550x400 mm , CGI sheet 10 ft long , PVC bib tab 15mm , Wooden Rails

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

14

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Baramulla

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-BaramullaBaramulla--260-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9780400.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

31-Aug-2026

Extended Deadline

03-Sep-2026, 3:30 pm

Opening Date

03-Sep-2026, 4:00 pm

Bill of Quantities (BOQ) 20 Items Sign in for GEM prices

#1

Switch Socket combination 3 5 Pin 6 Amp

Make Anchor Havells ABB Legrand Schneider

2 nos Delivery: 60 days
#2

Switch Socket combination 3 5 Pin 16 Amp

Make Anchor Havells ABB Legrand Schneider

4 nos Delivery: 60 days
#3

LED Bulb 12 W

Make Bajaj Philips Syska Havells Goodwyn

10 nos Delivery: 60 days
#4

LED Tube light fitting 1 x 18W 4 feet long complete with all accessories including LED tube rod

Make Bajaj Philips Syska Havells Goodwyn

6 nos Delivery: 60 days
#5

MCB 16 Amps SP

Make L and T ABB Siemens Legrand Havells

2 nos Delivery: 60 days
#6

MCB 20 Amp sp

Make L and T ABB Siemens Legrand Havells

2 nos Delivery: 60 days
#7

Socket 3 pin 5 6 Amps

Make L and T ABB Siemens Legrand Havells

10 nos Delivery: 60 days
#8

PBS Roll

PBS Roll

1 nos Delivery: 60 days
#9

Acrylic Sheet 6 ft x 4ft 4mm

Acrylic Sheet 6 ft x 4ft 4mm

3 nos Delivery: 60 days
#10

PVC Insulated Cable 1.5 Sqmm Single Core Copper Conductor

Make Havells Finolex Polycab

90 rm Delivery: 60 days
#11

Cornet set

Cornet set

1 nos Delivery: 60 days
#12

Modular Switch one way 6 Amp

Make Anchor Havells Goldmedal Panasonic

10 nos Delivery: 60 days
#13

PVC Insulation tape 2 cm wide 10 mtr long

Make Anchor ISI Marked

14 nos Delivery: 60 days
#14

Rotational moulded polyethylene water storage tank double layer 500 ltr capacity

Make Star Comfort Sintex

2 nos Delivery: 60 days
#15

Looking Mirror 3 ft x 2 ft

Make Modiguard Saint Gobain

1 nos Delivery: 60 days
#16

Playwood 6 ft x 3 ft

Playwood 6 ft x 3 ft

2 nos Delivery: 60 days
#17

Vitreous china wash Hand Basin WHB white flat back size 550x400 mm

lncluding waste coupling of PTMT 15mm dia 450mm long PVC connection with PTMT nut 1m long PVC flexible waste pipe and bracket for holding WHB

8 nos Delivery: 60 days
#18

CGI sheet 10 ft long

Galvanisation as per IS 429

6 nos Delivery: 60 days
#19

PVC bib tab 15mm

Make Prayag and Cera

4 nos Delivery: 60 days
#20

Wooden Rails

Wooden Rails

2 nos Delivery: 60 days

Categories 47

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer