GEM

Procurement Opportunity: 1.5 Tonne Split AC inverter type,Vaccum Cleaner Wet and Dry,Calculator 12 Digits,Stapler Small,Stap

Bid Publish Date

26-Nov-2024, 4:21 pm

Bid End Date

17-Dec-2024, 5:00 pm

Latest Corrigendum Available

Progress

Issue26-Nov-2024, 4:21 pm
Technical19-12-2024 21:32:45
Financial
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

14

Category

1.5 Tonne Split AC inverter type

Bid Type

Two Packet Bid

Categories 14

Jammu And Kashmir Forest Protection Force has released a public tender for 1. 5 Tonne Split AC inverter type, Vaccum Cleaner Wet and Dry, Calculator 12 Digits, Stapler Small, Stapler Big Size. Quantity: 14. Submission Deadline: 17-12-2024 17: 00: 00. Download documents and apply online.

Past Similar Tenders (Historical Results)

5 found

1.5 TON INVERTER TYPE SPLIT AIR CONDITIONERS,2 TON INVERTER TYPE SPLIT AIR CONDITIONERS,STABILIZERS

Hindustan Aeronautics Limited (hal)

BANGALORE, KARNATAKA

Posted: 8 May 2025
Closed: 30 May 2025
GEM

Office executive high back chair,UPS 600 VA,Stapler Pin Small,Stapler Pin Big,Dusting Cloth Yellow

Indian Army

VISAKHAPATNAM, ANDHRA PRADESH

Posted: 11 February 2025
Closed: 4 March 2025
GEM

Wall mounted Split Type 5 Star Inverter Air-conditioner 1TON,Wall mounted Split Type 5 Star Inverte

Bharat Heavy Electricals Limited (bhel)

Posted: 31 May 2025
Closed: 10 June 2025
GEM

Tape Dispenser,Paper Cutter Large,Scissor Medium,Scale Stainless Steel,Stapler Large,Stapler Small,

Hqids

SOUTH ANDAMAN, ANDAMAN & NICOBAR

Posted: 30 January 2025
Closed: 20 February 2025
GEM

Digital Standee USB T Type Frame,Electric ARC Welding Machine,5 KVA Stabilizer,Air Stapler Pneumati

Indian Army

KARGIL, JAMMU & KASHMIR

Posted: 10 October 2025
Closed: 21 October 2025
GEM

Bill of Quantities (BOQ) 5 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 1.5 Tonne Split AC inverter type As Per Specification 1 nos rojammu1 15
2 Vaccum Cleaner Wet and Dry As Per Specification 1 nos rojammu1 15
3 Calculator 12 Digits As Per Specification 3 nos rojammu1 15
4 Stapler Small As Per Specification 3 nos rojammu1 15
5 Stapler Big Size As Per Specification 6 nos rojammu1 15

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

19-Dec-2024

Extended Deadline

20-Dec-2024, 9:00 am

Opening Date

20-Dec-2024, 9:30 am

Technical Results

S.No Seller Item Date Status
1EISHVAR ASSOCIATES   Under PMA-19-12-2024 21:32:45Qualified
2S K Enterprises   Under PMA-19-12-2024 22:11:09Qualified
3Sharma & Sharma Company   Under PMA-19-12-2024 22:21:13Qualified

Financial Results

Rank Seller Price Item
L1EISHVAR ASSOCIATES   Under PMA₹89,125Item Categories : 1.5 Tonne Split AC inverter type,Vaccum Cleaner Wet and Dry,Calculator 12 Digits,Stapler Small,Stap
L2Sharma & Sharma Company   Under PMA₹92,245Item Categories : 1.5 Tonne Split AC inverter type,Vaccum Cleaner Wet and Dry,Calculator 12 Digits,Stapler Small,Stap
L3S K Enterprises   Under PMA₹1,00,336Item Categories : 1.5 Tonne Split AC inverter type,Vaccum Cleaner Wet and Dry,Calculator 12 Digits,Stapler Small,Stap

Frequently Asked Questions

## FAQs
What are the eligibility requirements for bidding?

Eligibility requirements include being a registered entity, having a minimum average annual turnover of 1 Lakh, and having 3 years’ past experience in supplying similar equipment.

What required certificates must be submitted?

Bidders must submit various certificates including the OEM authorization certificate, past performance evidence, and compliance documents to meet the specifications listed in the BoQ.

How does the registration process work for this tender?

Bidders must complete the registration process on the designated online platform prior to bidding, providing all necessary documentation as stipulated in the tender requirements.

What document formats are accepted for submission?

The accepted document formats generally include PDFs and other standard formats specified in the tender document. It is crucial that all documents are clearly labeled and uploaded as directed.

What are the technical specifications for the required equipment?

Technical specifications include compliance with standards for the 1.5 Tonne Split AC inverter type, and details outlined in the BoQ. Specific performance metrics may also be highlighted in the documentation.

What quality standards must be adhered to?

Bidders must comply with the quality standards as per the IS: 1391 (part 2) for air conditioning units and other relevant quality assurances specified for each equipment type.

What are the compliance requirements for bidders?

Bidders must ensure they meet the compliance requirements as defined in the tender specifications, including but not limited to financial and technical criteria.

What are the performance security requirements?

Bidders must adhere to the performance security guidelines set forth in the tender document, often including a guarantee or bond to ensure contract compliance.

What are the payment terms outlined in the tender?

Payment terms are generally stipulated in the tender documentation, including any advance payment conditions and milestones for payment releases upon successful delivery.

How are prices evaluated in the tender process?

Price evaluation typically considers the total value of bids, ensuring compliance with technical and quality standards while offering the best value for money.

What are the submission methods allowed?

Bidders are instructed to submit documents electronically through the specified tender portal, following the guidelines provided in the main tender document.

What key timelines should bidders be aware of?

Bidders must pay attention to key timelines for bid submission, including opening and closing dates as specified in the tender notice without altering them.

How is the evaluation and selection process conducted?

The evaluation and selection process involves a total value-wise assessment along with technical compliance checks, with notifications sent to successful bidders.

How will results be notified?

Results of the tender will be communicated through the official channels as mentioned in the tender document, ensuring transparency in the process.

What benefits are available for Micro, Small, and Medium Enterprises (MSEs)?

MSEs may benefit from special provisions, reduced submission requirements, and potentially favorable evaluation conditions as highlighted in the tender framework.

Are there any provisions to support startups?

Specific provisions are available for startups to encourage their participation in the procurement process, potentially including relaxed criteria as per the latest procurement policies.

What does compliance with the 'Make in India' policy entail?

Compliance with the 'Make in India' policy entails utilizing domestically produced goods and materials, promoting local content in the supplied products as outlined in the procurement guidelines.