Fuel Filter Primary,Fuel Filter Secondary,Oil Filter,Hand Brake Cable Complete,Front Brake Pad,Rear
Indian Army
RI BHOI, MEGHALAYA
Bid Publish Date
05-Feb-2026, 6:41 pm
Bid End Date
16-Feb-2026, 7:00 pm
Location
Progress
Quantity
31
The Indian Army, Department Of Military Affairs, seeks procurement in Kathua, Jammu & Kashmir (PIN 184101) for a range of kit and filter components, including KIT U JOINT, KIT UJ CROSS, FILTER ELEMENT, FILTER OIL, DUAL FUEL FILTER ELEMENT, LUB OIL FILTER, AIR FILTER OUTER, WIRE HARNESS, HOSE RADIATOR INLET, HOSE RADIATOR OUTLET, LEVER, and HALF CLAMP. The BOQ lists 12 items, though item-wise quantities/units are not disclosed. The estimated value and EMD are not specified. The buyer clause permits up to 25% quantity variation during contract placement and currency, with a delivery time formula based on original quantities and extended periods. This is a government procurement tender with standard option-clause delivery flexibility.
Key differentiators include the explicit quantity-variation provision and extended delivery-time calculation, which influences bid pricing strategies and post-award logistics planning. The tender emphasizes compliance with Army procurement norms, and requires bidders to align with the option-clauses while maintaining delivery discipline. Bidders should prepare for a potentially fluctuating order size within the 25% band and plan production capacity accordingly.
Product/service names from title: KIT U JOINT, KIT UJ CROSS, FILTER ELEMENT, FILTER OIL, DUAL FUEL FILTER ELEMENT, LUB OIL FILTER, AIR FILTER OUTER, WIRE HARNESS, HOSE RADIATOR INLET, HOSE RADIATOR OUTLET, LEVER, HALF CLAMP
Quantity details: 12 total items in BOQ; exact quantities not disclosed
Estimated value/EMD: Not specified in data
Delivery: Clause allows up to 25% quantity variation; delivery period tied to original delivery order end date with calculation for extended period
Quality/standards: No explicit standards listed in tender data
Option Clause: bidder must accommodate up to 25% quantity variation during contract and currency
Delivery extension formula: (Increased quantity ÷ Original quantity) × Original delivery period, min 30 days
EMD/Estimated value: Not disclosed; bidders to align with standard Army norms
Not specified in provided data; standard Army terms presumed
Delivery period calculated from last date of original delivery order; extended period per option clause with minimum 30 days
Not specified in provided data; bidders to review standard penalties under Army procurement
Experience in supplying mechanical/hydraulic kit components to defense/government sector
Ability to manage 25% quantity variation without disruption
Compliance with standard GST, PAN, and financial disclosure requirements
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
RI BHOI, MEGHALAYA
Indian Army
Ajmer, RAJASTHAN
Indian Army
DEHRADUN, UTTARAKHAND
Indian Army
TINSUKIA, ASSAM
Indian Army
BUDGAM, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | KIT U JOINT | KIT U JOINT | 2 | pieces | [email protected] | 15 |
| 2 | KIT UJ CROSS | KIT UJ CROSS | 2 | pieces | [email protected] | 15 |
| 3 | FILTER ELEMENT | FILTER ELEMENT | 2 | pieces | [email protected] | 15 |
| 4 | FILTER OIL | FILTER OIL | 2 | pieces | [email protected] | 15 |
| 5 | DUAL FUEL FILTER ELEMENT | DUAL FUEL FILTER ELEMENT | 2 | pieces | [email protected] | 15 |
| 6 | LUB OIL FILTER | LUB OIL FILTER | 2 | pieces | [email protected] | 15 |
| 7 | AIR FILTER OUTER | AIR FILTER OUTER | 2 | pieces | [email protected] | 15 |
| 8 | WIRE HARNESS | WIRE HARNESS | 2 | pieces | [email protected] | 15 |
| 9 | HOSE RADIATOR INLET | HOSE RADIATOR INLET | 2 | pieces | [email protected] | 15 |
| 10 | HOSE RADIATOR OUTLET | HOSE RADIATOR OUTLET | 2 | pieces | [email protected] | 15 |
| 11 | LEVER | LEVER | 1 | pieces | [email protected] | 15 |
| 12 | HALF CLAMP | HALF CLAMP | 10 | pieces | [email protected] | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar/current capacity projects
Financial statements (balance sheet, P&L) for the last 2-3 years
EMD/Security deposit proof as per tender norms
Technical bid documents and conformity statements
OEM authorizations or authorized dealer certificates
Any applicable quality/certification documents (if available)
Key insights about JAMMU AND KASHMIR tender market
To bid for the Kathua kit procurement, ensure you meet eligibility for defense contracts, submit GST and PAN, provide 2-3 years of relevant experience, and attach OEM authorizations. Include 12-item BOQ coverage, confirm no quantity restrictions beyond 25%, and align pricing with potential extensions under the option clause.
Required documents include GST certificate, PAN, experience certificates for similar supply, financial statements for the last 2-3 years, EMD proof, technical conformity documentation, and OEM authorization where applicable. Ensure these are uploaded with the technical bid and cross-checked against the terms.
The contract allows a 25% variation in bid quantity at placement and during currency. The delivery period is recalculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days, ensuring scheduling flexibility without breaching core timelines.
The bid covers KIT U JOINT, KIT UJ CROSS, FILTER ELEMENT, FILTER OIL, DUAL FUEL FILTER ELEMENT, LUB OIL FILTER, AIR FILTER OUTER, WIRE HARNESS, HOSE RADIATOR INLET, HOSE RADIATOR OUTLET, LEVER, and HALF CLAMP, consolidating mechanical and hydraulic parts for defense equipment.
The tender data does not specify explicit standards; bidders should provide standard defense-grade documentation, OEM certifications, and quality assurances. Clarify IS/IS standards or industry certifications during pre-bid queries if available to align with Army procurement norms.
Delivery timing follows the last date of the original delivery order; any extended delivery time due to option-clause quantity changes is calculated per the prescribed formula, ensuring a minimum 30-day extension and adjusting project scheduling accordingly.
Nuclear Power Corporation Of India Limited
📍 CHITTORGARH, RAJASTHAN
Nhpc Limited
📍 KULLU, HIMACHAL PRADESH
Indian Coast Guard
📍 MUMBAI, MAHARASHTRA
Bhakra Beas Management Board
Hindustan Aeronautics Limited (hal)
📍 KORAPUT, ODISHA
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS