TenderDekho Logo
Active GEM

Indian Army Tower Air Conditioner 2 Ton Tender 2026 - 2 Ton AC Procurement for Department of Military Affairs

Bid Publish Date

29-Aug-2026, 8:18 pm

Bid End Date

09-Sep-2026, 8:00 pm

Progress

Issue29-Aug-2026, 8:18 pm
AwardPending

Key Highlights

  • Brand/OEM requirements: Not specified in tender data
  • Technical standards: Not specified; ensure military-grade safety and electrical compliance
  • Special clauses: 25% quantity variation during and after contract at contracted rates
  • Eligibility: No explicit EMD amount or qualification criteria published

Tender Overview

The opportunity is with the Indian Army under the Department of Military Affairs for the supply of a Tower Air Conditioner 2 Ton unit. Location details are not provided in the tender data. The contract scope centers on a specialized cooling unit for military facilities. A key clause allows up to a 25% quantity variation at contract award and during the contract period at the same rates. This option clause impacts quantity planning and price stability, and bidders should prepare for flexible delivery timelines aligned to the original delivery period. The absence of BOQ items suggests a single-item AC procurement or an unpopulated schedule. The emphasis is on compliant AC units suitable for military use under DMA oversight.

Technical Specifications & Requirements

  • Product name/category: Tower Air Conditioner 2 Ton
  • Standard/quality expectations: Not specified in the BOQ; bidders should ensure compliance with military-grade safety and electrical standards.
  • Quantity/estimate: Up to 25% increase in ordered quantity during contract; exact base quantity not disclosed.
  • Delivery considerations: Delivery period linked to the last date of the original delivery order; extended time computed as (Additional quantity ÷ Original quantity) × Original delivery period with a minimum of 30 days.
  • Contractual framework: Option clause allows quantity and schedule adjustments; bidders must comply with this mechanism.
  • Specifications gap: No explicit performance, energy, warranty, or installation requirements provided; suggest proactive clarification during bid submission.

Terms, Conditions & Eligibility

  • Delivery window: Additional time mechanics defined but base delivery timeline tied to original delivery order; minimum 30 days for extended period.
  • EMD/financials: Not disclosed in the tender data; bidders should verify exact EMD requirements in the final tender documents.
  • Delivery terms: Contracted rates apply to increased quantities within the 25% allowance; ensure price stability for additional units.
  • Compliance: Bidders must adhere to the option clause and deliver per DMA protocols; no explicit warranty or penalty details provided in the data.

Key Specifications

  • Product/service names: Tower Air Conditioner 2 Ton

  • Quantities: base quantity not disclosed; permissible increase up to 25%

  • EMD/estimated value: not disclosed in data

  • Experience: relevant supply of air conditioning units to government/military bodies recommended

  • Quality/standards: military-grade safety and electrical compliance recommended

Terms & Conditions

  • Quantity may be increased up to 25% at contract time with same rates

  • Delivery period adjusts from the last date of original order, minimum 30 days

  • Final EMD and specific submission documents to be confirmed in tender terms

Important Clauses

Payment Terms

Payment terms to be stated in final tender; no specific terms provided here

Delivery Schedule

Delivery period starts from last date of original delivery order; extended period uses calculated formula with minimum 30 days

Penalties/Liquidated Damages

No LD details published in data; verify in final documents

Bidder Eligibility

  • Experience in supplying air conditioning units to government or military entities

  • Demonstrated financial stability with appropriate turnover

  • Compliance with OEM authorizations and technical compliance certificates

Tender Data

Bid Details

Quantity

3

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Tower Air Conditioner (AC) 2 Ton

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Sonitpur

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-SonitpurSonitpur--315-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9822380.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Categories 2

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for supply of similar AC units

4

Financial statements / turnover evidence

5

EMD submission proof (as prescribed in final tender terms)

6

Technical bid documents and compliance certificates

7

OEM authorization (if bidding on behalf of a specific brand)

Frequently Asked Questions

Key insights about ASSAM tender market

How to bid for the Tower Air Conditioner tender in India Army 2026

Bidders should submit standard documents: GST, PAN, experience certificates, financials, and EMD as per final terms. Ensure OEM authorization if bidding on a specific brand and provide technical compliance for a Tower Air Conditioner 2 Ton unit that meets military safety standards and DMA procurement rules.

What documents are required for Army air conditioner procurement in 2026

Required documents include GST certificate, PAN card, experience certificates for similar AC supplies, financial statements, EMD proof, technical bid, and OEM authorization. Prepare installation and maintenance certifications if specified and ensure compliance with DMA guidelines for air conditioning equipment.

What are the technical specifications expected for 2 Ton Tower ACs in Army bids

Although explicit specs are not published, bidders should emphasize Tower AC 2 Ton capacity, energy efficiency, electrical safety, and compatibility with military use. Provide compliance certificates and test reports for performance, noise, and environmental conditions to meet DMA expectations.

When is the delivery deadline for the Indian Army air conditioner tender

The delivery period starts from the last date of the original delivery order, with extended time calculated as (additional quantity ÷ original quantity) × original period, minimum 30 days. Ensure readiness for up to 25% quantity changes at contract award.

How does the 25% quantity option affect pricing in Army AC tender

The buyer reserves the right to increase ordered quantity by up to 25% during contract and currency, at the contracted rates. Bidders should price flexibly for incremental units and plan logistics, installation, and warranty support for potential additional units.

What eligibility criteria apply to supply Tower ACs to Indian Army

Eligibility includes prior government/military AC supply experience, financial stability, GST/PAN validity, and ability to provide OEM authorizations and technical compliance certificates. Bidders should prepare to meet DMA procurement standards and warranty expectations if specified.

What are the key risks due to missing specifications in Army tender

Risks include unclear performance metrics and warranty terms. Respondents should proactively request clarifications, supply standardized compliance documentation, and propose pre-tested Tower AC 2 Ton solutions meeting military safety and electrical standards to reduce execution risk.

How to verify EMD requirements for the Army air conditioner bid

EMD details are not provided in data; bidders must refer to final tender terms for exact amount, format, and submission deadline. Prepare ready EMD via online or bank guarantee per stated value and ensure eligibility for performance security if required.