TenderDekho Logo
Active GEM

Bids are Invited For Control Valve Characteristics,Calibration Of Thermocouple,Dynamic response of the U tube manometer, in PATNA, BIHAR

Bid Publish Date

25-Sep-2026, 12:52 pm

Bid End Date

16-Oct-2026, 1:00 pm

Location

Progress

Issue25-Sep-2026, 12:52 pm
AwardPending

National Institute Of Technology (nit) invites bids for Control Valve Characteristics, Calibration Of Thermocouple, Dynamic response of the U tube manometer, Interacting Non Interacting System, Proportional P and Proportional Integral PI controllers for flow and level control, Time Constant of the stirred tank heater, Temperature control trainer with computer system, Pressure Control Trainer, P I I P Convertor, Capacitance Method, Nephelometer or Turbidimeter, Hot Air Oven, Muffle Furnace, Jar test apparatus, High volume air sampler PM10, Fine particulate sampler PM2. 5, Biochemical Oxygen Demand Analyzer, COD reflux apparatus with COD digester, Bomb Calorimeter, Biogas Digester or Anaerobic Digester, Melting Point Apparatus, Ball Mill, Air compressor, Oil Free Vacuum Pump, Ultra Violet Flourescene Inspection Cabinet in PATNA, BIHAR. Quantity: 26. Submission Deadline: 16-10-2026 13: 00: 00. Submit your proposal before the deadline.

Advertisement

Tender Data

Bid Details

Quantity

26

Category

Biogas Digester or Anaerobic Digester

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

23

OEM Avg. Turnover

185

Past Performance

60 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Control Valve Characteristics , Calibration Of Thermocouple , Dynamic response of the U tube manometer , Interacting Non Interacting System , Proportional P and Proportional Integral PI controllers for flow and level control , Time Constant of the stirred tank heater , Temperature control trainer with computer system , Pressure Control Trainer , P I I P Convertor , Capacitance Method , Nephelometer or Turbidimeter , Hot Air Oven , Muffle Furnace , Jar test apparatus , High volume air sampler PM10 , Fine particulate sampler PM2.5 , Biochemical Oxygen Demand Analyzer , COD reflux apparatus with COD digester , Bomb Calorimeter , Biogas Digester or Anaerobic Digester , Melting Point Apparatus , Ball Mill , Air compressor , Oil Free Vacuum Pump , Ultra Violet Flourescene Inspection Cabinet

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

38

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Patna

Delivery Pincodes

800005

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Prince Kumar800005,NIT PATNA, ASHOK RAJPATH, MAHENDRU, PATNA- 800005PatnaBihar800005145-

Authority Records

MINISTRY OF EDUCATIONHIGHER EDUCATION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9873961.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Bill of Quantities (BOQ) 25 Items Sign in for GEM prices

#1

Control Valve Characteristics

Specification of Control Valve Characteristics

1 pieces Delivery: 45 days
#2

Calibration Of Thermocouple

Specification of Calibration Of Thermocouple

1 pieces Delivery: 45 days
#3

Dynamic response of the U tube manometer

Specification of Dynamic response of the U tube manometer

1 pieces Delivery: 45 days
#4

Interacting Non Interacting System

Specification of Interacting Non Interacting System

1 pieces Delivery: 45 days
#5

Proportional P and Proportional Integral PI controllers for flow and level control

Specification of Proportional P and Proportional Integral PI controllers for flow and level control

1 pieces Delivery: 45 days
#6

Time Constant of the stirred tank heater

Specification of Time Constant of the stirred tank heater

1 pieces Delivery: 45 days
#7

Temperature control trainer with computer system

Specification of Temperature control trainer with computer system

1 pieces Delivery: 45 days
#8

Pressure Control Trainer

Specification of Pressure Control Trainer

1 pieces Delivery: 45 days
#9

P I I P Convertor

Specification of P I I P Convertor

1 pieces Delivery: 45 days
#10

Capacitance Method

Specification of Capacitance Method

1 pieces Delivery: 45 days
#11

Nephelometer or Turbidimeter

Specification of Nephelometer orTurbidimeter

1 pieces Delivery: 45 days
#12

Hot Air Oven

Specification of Hot Air Oven

1 pieces Delivery: 45 days
#13

Muffle Furnace

Specification of Muffle Furnace

1 pieces Delivery: 45 days
#14

Jar test apparatus

Specification of Jar test apparatus

1 pieces Delivery: 45 days
#15

High volume air sampler PM10

Specification of High volume air sampler PM10

1 pieces Delivery: 45 days
#16

Fine particulate sampler PM2.5

Specification of Fine particulate sampler PM2.5

1 pieces Delivery: 45 days
#17

Biochemical Oxygen Demand Analyzer

Specification of Biochemical Oxygen Demand Analyzer

1 pieces Delivery: 45 days
#18

COD reflux apparatus with COD digester

Specification of COD reflux apparatus with COD digester

1 pieces Delivery: 45 days
#19

Bomb Calorimeter

Specification of Bomb Calorimeter

1 pieces Delivery: 45 days
#20

Biogas Digester or Anaerobic Digester

Specification of Biogas Digester or Anaerobic Digester

1 pieces Delivery: 45 days
#21

Melting Point Apparatus

Specification of Melting Point Apparatus

2 pieces Delivery: 45 days
#22

Ball Mill

Specification of Ball Mill

1 pieces Delivery: 45 days
#23

Air compressor

Specification of Air compressor

1 pieces Delivery: 45 days
#24

Oil Free Vacuum Pump

Specification of Oil Free Vacuum Pump

1 pieces Delivery: 45 days
#25

Ultra Violet Flourescene Inspection Cabinet

Specification of Ultra Violet Flourescene Inspection Cabinet

1 pieces Delivery: 45 days

Categories 113

BP INSTRUMENT MELTING POINT APPARATUS PLATFORM SCALE DECIBEL METER LABORATORY ITEM MILK COLLECTING SYSTEMS STEAM IRON PARAMETER TEST REFRIGERATED MICROCENTRIFUGES PRECIOUS METAL SCRAP TESTING INSTRUMENT OILS SUPPLY COMPRESSOR CLINKER GRINDER GROWTH CHAMBERS CRUSHERS BREAKERS AND GRINDERS AIR BRAKE MILKING MACHINE ANALYZER LUBRICATING OILS BLOOD PRESSURE CUFF KIT BI DISTILLATION UNIT RADIO FREQUENCY ANALYSER GEYSER HIGH VACUUM WATTMETERS MAGNET VALVE AMC OF ELECTRONIC PROGRAMMABLE CRUCIBLE FURNACES ARTICULATING LAZY ARMS BLOOD PRESSURE MEASURING INSTRUMENT ACCESSORIES HEATER VACCUM PUMP ULTRACENTRIFUGES THICKNESS GAUGE BALL MILL MILITARY VEHICLE VAPORIZERS LABORATORY FURNACES MAINTENANCE CONTRACT OF ELECTRONIC INDICATING AND RECORDING INSTRUMENTS POLLUTION MEASURING INSTRUMENT COOLER REFRIGERATORS MAGNETIC STIRRERS BOMB CALORIMETER AIR SAMPLERS PROGRAMMABLE BOX FURNACES MACHINE OIL AIR COMPRESSOR PNEUMATIC POSITIONER THERMOMETER AUDIOMETERS INDUCTION COOKER FLUID MECHANICS EQUIPMENT VOLTMETER COMPRESSED AIR VACUUM OVENS PNEUMATIC MACHINERY DRYING CABINETS GLUCOMETER PNEUMATIC VALVES PNEUMATIC VACUUM PNEUMATIC PRESSURE GAUGE LUBRICANT PRODUCT WEIGH BRIDGE THERMOWELLS AUTOCLAVE AND STERILIZER EQUIPMENT ELECTRICAL CONDENSER ICE BOX VERTICAL COOLER TUBE THERMOCOUPLES BIOPSY ASPIRATOR PRODUCTS AIR INFLATORS VALVE PNEUMATIC TOOLS WATER LEVEL RECORDER PRESSURE MEASURING AND CONTROL INSTRUMENTS HEAT MEASURING INSTRUMENTS AIR GENERATOR BODYWEIGHT MEASURING SCALE RAW MATERIALS PROCESSING MACHINERY HOT AIR BOILER SOLENOID VALVES VACUUM CENTRIFUGES AIRCRAFT HYDRAULIC SYSTEMS ROUTINE MAINTENANCE SMART POSITIONER SLIDER VALVES HEATING EQUIPMENT SPARES CABINET ORBITAL SHAKERS LABORATORY OVENS BIO GAS PLANT ROTARY VANE PUMPS PYROMETERS FIRE SPRINKLER CRUCIBLE FURNACES GAUGE ROTARY EVAPORATORS COAL TESTING INSTRUMENTS MEDICAL GAS FREEZE DRYERS FURNACE SUPPLY PNEUMATIC METER BENCH REFRACTOMETERS RIPENING ROOM MEDICAL DIAGNOSTIC GAMMA CAMERAS CALORIMETERS WEIGHTS LABORATORY MILLS

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement